- ML20151A661 + (ML20151A661)
- ML20151A663 + (ML20151A663)
- L-88-149, Forwards Response to NRC Re Violations Noted in Insp Repts 50-250/88-03 & 50-251/88-03.Interface Between Engineering & Const W/Security Being Improved.Response Withheld (Ref 10CFR2.790 & 73.21) + (ML20151A664)
- ML20151A665 + (ML20151A665)
- ML20151A666 + (ML20151A666)
- ML20151A668 + (ML20151A668)
- ML20151A670 + (ML20151A670)
- ML20151A671 + (ML20151A671)
- ML20151A672 + (ML20151A672)
- ML20151A674 + (ML20151A674)
- ML20151A678 + (ML20151A678)
- ML20151A682 + (ML20151A682)
- ML20151A684 + (ML20151A684)
- AECM-88-0066, Special Rept 88-001/0:on 880302,diesel Generator 12 Automatically Tripped on Low Lube Oil Pressure.Caused by Automatic Start Due to Lube Oil Pressure Fluctuations That May Occur During Engine Startup.Diesel Generator Tested + (ML20151A685)
- ML20151A687 + (ML20151A687)
- ML20151A688 + (ML20151A688)
- ML20151A690 + (ML20151A690)
- BECO-88-063, Supersedes 870611 Response to Generic Ltr 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves. All Valves on Encl Have Been Added to Inservice Testing Program & Satisfactorily Tested + (ML20151A691)
- ML20151A693 + (ML20151A693)
- ML20151A695 + (ML20151A695)
- ML20151A699 + (ML20151A699)
- ML20151A702 + (ML20151A702)
- ML20151A704 + (ML20151A704)
- ML20151A705 + (ML20151A705)
- ST-HL-AE-2600, Requests That Encl Svc List Be Used for NRC Correspondence W/Util Re Facilities.List Replaces Previous Requests from Util for Distribution of Correspondence + (ML20151A707)
- ML20151A708 + (ML20151A708)
- W3P88-0059, Advises That Exercise Objectives Meeting Scheduled for 880523 to Discuss 881012 Emergency Exercise Objective Prior to Submittal to NRC & FEMA + (ML20151A713)
- PY-CEI-NRR-0830, Responds to NRC Re Violations Noted in Insp Rept 50-440/87-22.Corrective Actions:Temporary Alteration Reevaluated & 10CFR50.59 Safety Evaluation Performed + (ML20151A715)
- ML20151A717 + (ML20151A717)
- ML20151A720 + (ML20151A720)
- ML20151A722 + (ML20151A722)
- ML20151A724 + (ML20151A724)
- ML20151A730 + (ML20151A730)
- ML20151A737 + (ML20151A737)
- ML20151A738 + (ML20151A738)
- ML20151A744 + (ML20151A744)
- ML20151A745 + (ML20151A745)
- IR 05000333/1988008 + (ML20151A749)
- ML20151A751 + (ML20151A751)
- ML20151A757 + (ML20151A757)
- ML20151A758 + (ML20151A758)
- PY-CEI-NRR-0835, Motor Valve Testing & Evaluatiion at Perry Nuclear Power Plant (IE Bulletin 85-003) + (ML20151A766)
- ML20151A768 + (ML20151A768)
- ML20151A769 + (ML20151A769)
- ML20151A770 + (ML20151A770)
- PNO-I-88-072, on 880709,inboard MSIV Failed Full Closure Test.Subsequent Testing Indicated That Valve Stem May Be Separated from Valve Disc.Msiv Repair Estimated to Take 18 Days + (ML20151A773)
- ML20151A775 + (ML20151A775)
- ML20151A778 + (ML20151A778)
- ML20151A779 + (ML20151A779)
- ML20151A784 + (ML20151A784)
- ML20151A789 + (ML20151A789)