Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20149K697 + (ML20149K697)
- ML20149K698 + (ML20149K698)
- ML20149K699 + (ML20149K699)
- ML20149K701 + (ML20149K701)
- ML20149K703 + (ML20149K703)
- ML20149K704 + (ML20149K704)
- ML20149K705 + (ML20149K705)
- ML20149K706 + (ML20149K706)
- U-601133, Forwards Proprietary Preliminary Test Rept 17955-1, AMP Product Corp 53549-1 & 53550-1 Butt Splices & Thomas & Betts Corp RB-4 & RC-6 Wire Joints. Rept Withheld + (ML20149K707)
- B16568, Forwards Response to RAI Re RCS Cooldown Weaknesses in NRC Insp Repts 50-245/95-44,50-336/95-44 & 50-423/95-44 on 951227-960207.Corrective Actions:Operating Practices During Cooldown Activities to Operated RCPs Changed + (ML20149K708)
- 1CAN029602, Monthly Operating Rept for Jan 1996 for ANO-Unit 1 + (ML20149K709)
- ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP + (ML20149K710)
- ML20149K713 + (ML20149K713)
- ML20149K715 + (ML20149K715)
- B16617, Provides Response to Recommendations Made by Little Harbor Consultants,Inc During 970603 Meeting + (ML20149K721)
- ML20149K723 + (ML20149K723)
- 05000302/LER-1997-004, :on 970207,thermal Relief Valves Inside Containment Did Not Meet Requirements for Design Basis Accidents.Caused by Personnel Error.Nuclear Engineering Procedure NEP-213 Were Revised + (ML20149K724)
- U-602798, Responds to NRC Questions Re Util Application for Temporary Partial Exemption & License Amend, + (ML20149K727)
- ML20149K728 + (ML20149K728)
- ML20149K730 + (ML20149K730)
- ML20149K731 + (ML20149K731)
- ML20149K732 + (ML20149K732)
- IA-97-223, Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $220,000.Violation Noted:Licensee Failed to Take Action to Address Condition Until 891117,when FWCI Was Inoperable + (ML20149K733)
- ML20149K733 + (ML20149K733)
- NG-96-0351, Provides Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20149K734)
- ML20149K735 + (ML20149K735)
- ML20149K736 + (ML20149K736)
- 05000482/LER-1997-001-01, :on 970624,failed to Comply with Surveillance Requirements to Test Certain Components at Shutdown.Caused by Personnel Error.Expectations Re Compliance with TS Were Discussed & Reinforced + (ML20149K738)
- ML20149K739 + (ML20149K739)
- ML20149K741 + (ML20149K741)
- ML20149K743 + (ML20149K743)
- ML20149K745 + (ML20149K745)
- ML20149K747 + (ML20149K747)
- ML20149K749 + (ML20149K749)
- 1CAN079702, Discusses Review of Preliminary Accident Sequence Precursor (Pasp) Analysis of Operational Event at Unit 1.Utilizing Unit 1 Failure Probability in Pasp Analysis Would Reduce Conditional Probability of Event Below Value of 1E-05 + (ML20149K750)
- ML20149K753 + (ML20149K753)
- ML20149K754 + (ML20149K754)
- ML20149K755 + (ML20149K755)
- ML20149K757 + (ML20149K757)
- ML20149K758 + (ML20149K758)
- ML20149K759 + (ML20149K759)
- ML20149K760 + (ML20149K760)
- AECM-88-0022, Forwards Rev 1 to Relief Request C41-1 Re Standby Liquid Control Sys from ASME Section Xi,Per 10CFR50.55a(g)5(iii).No Problems Identified Preventing Valves from Performing Safety Functions.Testing Frequency of Cold Shutdown Not Necessar + (ML20149K762)
- ML20149K763 + (ML20149K763)
- NPL-97-0429, Forwards Revision to Pbnp Security Plan Figure W IAW 10CFR50.54(p).Plan Wittheld + (ML20149K766)
- ML20149K771 + (ML20149K771)
- ML20149K772 + (ML20149K772)
- ML20149K773 + (ML20149K773)
- U-602771, Provides Response to Questions Concerning Megger & Ductor Testing Performed on Circuit Breakers at CPS + (ML20149K776)
- ML20149K778 + (ML20149K778)
- ML20149K779 + (ML20149K779)