Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
. ..
I OPERAilNG DATA REPDRT l 1
l DOCKET NO 50-413 1 BATE Februarv 15. 1996 0'ERATl46 STATUS - COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 >
- 1. Unit Manet Catawba 1
- 2. Reporting Period: January 1, 1996-January 31,1996 .;'
- 3. Licensed Thereal Poser (MWt): 3411
- 4. Naseplate Rating (6tess MWe):- 13054 Notes eNaseplateRating ,
5.' Design Electrical Rating (Not MWe): !!45 (Gross MWe) calculated as
- 6. Marlaus Dependable Capacity (Bross MWe)
- 1192 1450.000 MVA x .90 poser
- 7. Marieve Dependable Capacity (Nel luie): . !!29 factor per Page 111, B. If Changes Occur in Capacity Ratings (!!eas Number 3 Through 7) Since Last NUREG-0020. ,
' Rep 6rt. Give Reasons:
- 9. Power Level To Which Restricted, If A,ny (Net MWe): ,
- 10. Reason for Restrictions, If any: J This Month Yr.-to-Date Cuaulative
- 11. Hours In Reporting Period 744.0 744.0 92857.0
~
- 12. Nuaber Of Hours Reactor Was Critical 673.1 673.1 72966.7
- 13. Reactor Reserve Shutdoun Hours --0-- --0-- - 14. Hours Generator On-Line 652.9 652.9 71741.6 i- 15. Unit Reserve Shutdown Hours - --0-- ,
- 16. Gross Thereal Energy Generated (MWH) 2094050 2094050 234M4309
- 17. Gross Electrical Energy 6enerated IMWH) 749598 749598 82652409
- 18. Het Electrical Energy 6enerated (MWH) 706503 706503 77751592
- 19. Unit Service Factor 87.8 87.8 77.3 !
- 20. Unit Availability Factor 87.8 87.8 77.3 t
- 21. Unit Capacity Factor (Using MDC Net) 84.1 84,1 73.9
- 22. Unit Capacity Factor (Using DER Net) 82.9 82.9 73.1 4
- 23. Unit Forced Outage Rate 12.2 12.2 8.2
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - June 01, 1996 - 99 days
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMIERCIAL OPERAi10N 4
9602220106 960215 PDR ADOCK 05000413 R PDR e
f
-i
, )
.i 1
GPEMilt1G MfA REPORT - j J
DOCKET 110 50-413-Isi!T Cat" 1 MTE Fantaarv 15. 1996 '
COIPLETED BY R.A. lillliams TELEPHONE 704-3B2-5346 i
i i
IIONTH Imamarv. 1996 i
I MLL AVERAGE MILY poler LEVEL M1 - AVERAGE MILY P0llER LEVEL f
- (Illie-IletI (INie-Ilet)' {
i
- 1..
1162. '17 1141 s
- 2. 1162 18 997 r
3 1163 19 516 i
4 11M to -777 !
1 9 725 21 1157 ;
i
& 0 22 1160 .!
7- 0 23 1161 j i
8 0 24 1157 ,
9 152 25 1162 ,
t to 876 26 1161
!! 1145 27 1160 j l
1155 29 1165 t 12 13 1161 29 !!&4 - ,
14- 1160 30 1164 ,
I 15 1159 31 1163 ;
. !& 1159 i i
i f
4
, ~ . , I
UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO. 50-413' UNIT NAME uuawna _1 DATE uz/1d/36 REPORT MONTH January 1996 COMPLETED BY x. A _. williams TELEPHONE (sue;-Jaz-dsed (1) (2) (3) (4) (5)
R MET-
E HOD T A OF LICENSE N- Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
.. -DATE E HOURS N R/X NO. CODE CODE y PREVENT RECURRENCE 1-P 96 5 F --
D --
IA CKTEKR REACTOR TRIP BREAKER TESTING.
VOLTAGE CRITERION NOT MET 1 96 5 F 91.08 D 1 IA CKTBKR REACTOR TRIP BREAKER TESTING VOLTAGE CRITERION NOT MET 2-P 96 9 F --
H --
RC FUELXX EVALUATE QUADRANT POWER TILT RATIO' 3-P 96 9 F --
A --
HH PUMPXX '1B' FEEDWATER PUMP WIRING REPAIRS i
4-P 96- 1-10 F --
A --
HH PUMPXX '1B' FEEDWATER PUMP WIRING REPAIRS 5-P 96- 1-18 F --
A ---
HH PUMPXX '1A' FEEDWATER PUMP (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
, D-Regulatory Restriction 4-Other-(Explain) File (NUREG-0161)
E-Operator Training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H -Other (Explain) (Explain) i i
_ _ _ . - - - - - _ ..____ _ _ _ _ ___1__
1 DOCKET: 50-413 I
UNIT: Catawba 1 Date: 02/15/96 NARRATIVE
SUMMARY
i MONTH: January,1996 Catawba Unit i began the month of January operating at 100% full power. Re unit operated at or near 100% full power until 01/05/96 at 1330, when the unit began decreasing power due to reactor trip breaker testing voltage criterion not being met per technical specification action statement. The unit was removed from service on 01/05/96 at 1700 due to reactor trip breaker testing voltage criterion not being met. The l l
unit was placed on-line 01/09/96 at 1205. The unit held at 48% power from 1745 to 2305 to evaluate quadrant power tilt ratio greater than technical specification limit for operation above 50% r 11 power.
During power escalation, the unit held at $2% power on 01/09/96 from 2330 to 01/10/96 at 0142 and from 0215 to 0335 at 60% power due to feedwater pump 'IB' The unit returned to 100% full power on 01/11/96 at 0535 and operated at or near 100% power until 01/18/96 at 1537 when the unit began ,
decreasing power and held from 20$$ to 01/20/96 at 1050 due to feedwater pump 'l A' wiring repairs. The !
unit returned to 100% full power on 01/20/96 at 2205 and operated at or near 100% power the remainder ;
of the month. i 1
1 1
i i
i l
1 Prepared by: R. A. Williams i Telephone: (704)- 382-5346 !
MONTHLY REFUELING INFORMATION REOUEST
- l. Facility name: Catawba. Unit 1
- 2. Scheduled next refueling shutdown: June 1996
- 3. Scheduled restart following refueling: September 1996 TiiE PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT, TIIEREFORE, QUESTIONS 4 TilROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing cc,nsiderations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblics (a) in the core: 121 (b) in the spent fuel pool: MQ
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: :.-
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
Sentember 1QQ2 i
DUKE POWER COMPANY DATE: February 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 f
1 OPERATIN6 DATA REPORT DOCKET NO 50-414 DATE Februarv 15. 1996 OPERATill6 ST4TUS COMPLETED By R.A. Williams TELEPHONE 704-382-5346
- 1. Unit Names Catauba 2 2.ReportingPeriod: January 1,1996-January 31,1996 - ;
- 3. Licensed Thereal Power (MWt): 3411 1
- 4. Naseplate Rating 16tess MWe): 1305e llotes Hiaasplate Rating l
- 5. Design Electrical Rating (llet IIWe): !!45 (Gross flue) calculated as ,
- 6. Manteue Dependanie Capacity (Stoss leie): 1192 1450.000 MVA x .90 poser i
- 7. Maxieue Dependable Capacity (Net llue): !!29 factor per Page 111, j
- 8. If Changes Occur in Capacity Ratings (! tees llueber 3 Through 7) Since Last NURE6-0020. 1 Report. Give Reasons:
9 _ Power Level To Which Restricted, If Any (llet MWe):
10.' Reason For Restrictions, If any:
This Month Yr.-to-Bate Cuaulative
!!. Hours in Reporting Period 744.0 744.0 82873.0
- 12. Number of Hours Reactor Was Critical 744.0 744.0 64910.2
- 13. Reactor Reserve Shutdoun Hours - --0-- --0--
- 14. Hours Senerator On-Line 744.0 744.0 63881.7
- 15. Unit Reserve Shutdoun Hours - - - .,
- 16. Gross Thernal Energy Generated (MiiH) 2528638 2528638 205945176
' 17. Gross Electrical Energy Generated (MWH) 909424 909424 73013791
- 18. Net Electrical Energy Generated (MWH) 865470 865470 68777727
- 19. Unit Service Factor 100.0 100.0 77.1
- 20. Unit Availability Factor 100.0 100.0 77.1 ,
- 21. Unit Capacity Factor (Using MDC Net) 103.0 103.0 73.4
- 22. Unit Capacity Factor (Using DER Net) 101.6 101.6 72.5 ,
- 23. Unit Forced Outage Rate 0.0 0.0 8.8
]
- 24. Shutdown Scheduled Dyer Next 6 Months (Type, pate, and Duration of Each): j None j l
25._If Shut Dona At End Of Report Perled. Estiaated Date of Startup ;
- 26. Units In Test Status (Prior ta Coseercial Operation): Forecast Achieved l INITIAL CRITICALITV INITIAL ELECTRICITY COMMERCIAL OPERATION i-p,-. i y
OPERATING DATA REPORT DOCKET N0 50-414 UNIT catada 2
- DATE February 15. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MGMTH January.1996 l
E AYERA6 EDA!LYPOWERLEVEL M AVERAGE DAILY POWER LEVEL
( R -Net) t h -Net). i
!" 1165 17 1165
?
2 .. Ilu 18 till a
3 1166 19 1157 4 !!69 20 1164 5 11M - 21 1167 i 6 1161 22 1167 7 1162 23 1165 ;
, 8 1162 24 1160 9 1169 25 1167 10 1168' 26 1165 11 1168 27 1162 I i
' I 12 1163 29 11&&
13 1164 29 1165 14 !!M M llM 15 1164 11 Itu 16 1166
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME Carawisa z DATE v2/Ad/96 REPORT MONTH January 1996 COMPLETED BY x. A. Williams TELEPHONE t/us;-Juz-duse (1) (2) (3) (4) (5)
R MET-
- E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator training & License Examination F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)
-o
DOCKET: 50-414 UNIT: Catawba 2 Date: 02/15/96 NARRATIVE
SUMMARY
-MONTH: January,1996
. Catawba Unit 2 began the month of January operating at 100% full power. The unit operated at or near 100% full power for the entire month.
I Prepared by: R. A. Williams Telephone: (704)- 382-5346 s-
, e.
MONTilLY REFUELING INFORMATION REOUEST
- 1. Facility name: Catawba. Unit 2
- 2. Scheduled next refueling shutdown: March 1997
- 3. Scheduled restart following refueling: April 1997 Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF '
ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4
-TilROUGil 6 WILL NO LONGER BE M AINTAINED IN Tills REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee ,
regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 124
- 8. Present licensed fuel pool capacity: 141]l j; Size of requested or planned increase: =
- 9. Projected date oflast refueling which can be accommodated by present license capacity:
September 2Hil l .'
4 DUKE POWER COMPANY DATE: February 15.1996 i Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 s
i A