Monthly Operating Repts for Jan 1996 for Catawba Nuclear Station
ML20149K732
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/31/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20149K726 List:
References
NUDOCS 9602220106
Download: ML20149K732 (10)


Text

. ..

I OPERAilNG DATA REPDRT l 1

l DOCKET NO 50-413 1 BATE Februarv 15. 1996 0'ERATl46 STATUS - COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 >

1. Unit Manet Catawba 1
2. Reporting Period: January 1, 1996-January 31,1996 .;'
3. Licensed Thereal Poser (MWt): 3411
4. Naseplate Rating (6tess MWe):- 13054 Notes eNaseplateRating ,

5.' Design Electrical Rating (Not MWe):  !!45 (Gross MWe) calculated as

6. Marlaus Dependable Capacity (Bross MWe)
1192 1450.000 MVA x .90 poser
7. Marieve Dependable Capacity (Nel luie): .  !!29 factor per Page 111, B. If Changes Occur in Capacity Ratings (!!eas Number 3 Through 7) Since Last NUREG-0020. ,

' Rep 6rt. Give Reasons:

9. Power Level To Which Restricted, If A,ny (Net MWe): ,
10. Reason for Restrictions, If any: J This Month Yr.-to-Date Cuaulative
11. Hours In Reporting Period 744.0 744.0 92857.0

~

12. Nuaber Of Hours Reactor Was Critical 673.1 673.1 72966.7
13. Reactor Reserve Shutdoun Hours --0-- --0-- - 14. Hours Generator On-Line 652.9 652.9 71741.6 i- 15. Unit Reserve Shutdown Hours - --0-- ,
16. Gross Thereal Energy Generated (MWH) 2094050 2094050 234M4309
17. Gross Electrical Energy 6enerated IMWH) 749598 749598 82652409
18. Het Electrical Energy 6enerated (MWH) 706503 706503 77751592
19. Unit Service Factor 87.8 87.8 77.3  !
20. Unit Availability Factor 87.8 87.8 77.3 t
21. Unit Capacity Factor (Using MDC Net) 84.1 84,1 73.9
22. Unit Capacity Factor (Using DER Net) 82.9 82.9 73.1 4
23. Unit Forced Outage Rate 12.2 12.2 8.2
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - June 01, 1996 - 99 days

25. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIAL ELECTRICITY COMIERCIAL OPERAi10N 4

9602220106 960215 PDR ADOCK 05000413 R PDR e

f

-i

, )

.i 1

GPEMilt1G MfA REPORT - j J

DOCKET 110 50-413-Isi!T Cat" 1 MTE Fantaarv 15. 1996 '

COIPLETED BY R.A. lillliams TELEPHONE 704-3B2-5346 i

i i

IIONTH Imamarv. 1996 i

I MLL AVERAGE MILY poler LEVEL M1 - AVERAGE MILY P0llER LEVEL f

- (Illie-IletI (INie-Ilet)' {

i

1..

1162. '17 1141 s

2. 1162 18 997 r

3 1163 19 516 i

4 11M to -777  !

1 9 725 21 1157  ;

i

& 0 22 1160 .!

7- 0 23 1161 j i

8 0 24 1157 ,

9 152 25 1162 ,

t to 876 26 1161

!! 1145 27 1160 j l

1155 29 1165 t 12 13 1161 29  !!&4 - ,

14- 1160 30 1164 ,

I 15 1159 31 1163  ;

. !& 1159 i i

i f

4

, ~ . , I

UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO. 50-413' UNIT NAME uuawna _1 DATE uz/1d/36 REPORT MONTH January 1996 COMPLETED BY x. A _. williams TELEPHONE (sue;-Jaz-dsed (1) (2) (3) (4) (5)

R MET-

E HOD T A OF LICENSE N- Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

.. -DATE E HOURS N R/X NO. CODE CODE y PREVENT RECURRENCE 1-P 96 5 F --

D --

IA CKTEKR REACTOR TRIP BREAKER TESTING.

VOLTAGE CRITERION NOT MET 1 96 5 F 91.08 D 1 IA CKTBKR REACTOR TRIP BREAKER TESTING VOLTAGE CRITERION NOT MET 2-P 96 9 F --

H --

RC FUELXX EVALUATE QUADRANT POWER TILT RATIO' 3-P 96 9 F --

A --

HH PUMPXX '1B' FEEDWATER PUMP WIRING REPAIRS i

4-P 96- 1-10 F --

A --

HH PUMPXX '1B' FEEDWATER PUMP WIRING REPAIRS 5-P 96- 1-18 F --

A ---

HH PUMPXX '1A' FEEDWATER PUMP (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

, D-Regulatory Restriction 4-Other-(Explain) File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H -Other (Explain) (Explain) i i

_ _ _ . - - - - - _ ..____ _ _ _ _ ___1__

1 DOCKET: 50-413 I

UNIT: Catawba 1 Date: 02/15/96 NARRATIVE

SUMMARY

i MONTH: January,1996 Catawba Unit i began the month of January operating at 100% full power. Re unit operated at or near 100% full power until 01/05/96 at 1330, when the unit began decreasing power due to reactor trip breaker testing voltage criterion not being met per technical specification action statement. The unit was removed from service on 01/05/96 at 1700 due to reactor trip breaker testing voltage criterion not being met. The l l

unit was placed on-line 01/09/96 at 1205. The unit held at 48% power from 1745 to 2305 to evaluate quadrant power tilt ratio greater than technical specification limit for operation above 50% r 11 power.

During power escalation, the unit held at $2% power on 01/09/96 from 2330 to 01/10/96 at 0142 and from 0215 to 0335 at 60% power due to feedwater pump 'IB' The unit returned to 100% full power on 01/11/96 at 0535 and operated at or near 100% power until 01/18/96 at 1537 when the unit began ,

decreasing power and held from 20$$ to 01/20/96 at 1050 due to feedwater pump 'l A' wiring repairs. The  !

unit returned to 100% full power on 01/20/96 at 2205 and operated at or near 100% power the remainder  ;

of the month. i 1

1 1

i i

i l

1 Prepared by: R. A. Williams i Telephone: (704)- 382-5346  !

MONTHLY REFUELING INFORMATION REOUEST

l. Facility name: Catawba. Unit 1
2. Scheduled next refueling shutdown: June 1996
3. Scheduled restart following refueling: September 1996 TiiE PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT, TIIEREFORE, QUESTIONS 4 TilROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing cc,nsiderations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblics (a) in the core: 121 (b) in the spent fuel pool: MQ
8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: :.-
9. Projected date oflast refueling which can be accommodated by present license capacity:

Sentember 1QQ2 i

DUKE POWER COMPANY DATE: February 15.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 f

1 OPERATIN6 DATA REPORT DOCKET NO 50-414 DATE Februarv 15. 1996 OPERATill6 ST4TUS COMPLETED By R.A. Williams TELEPHONE 704-382-5346

1. Unit Names Catauba 2 2.ReportingPeriod: January 1,1996-January 31,1996 -  ;
3. Licensed Thereal Power (MWt): 3411 1
4. Naseplate Rating 16tess MWe): 1305e llotes Hiaasplate Rating l
5. Design Electrical Rating (llet IIWe):  !!45 (Gross flue) calculated as ,
6. Manteue Dependanie Capacity (Stoss leie): 1192 1450.000 MVA x .90 poser i
7. Maxieue Dependable Capacity (Net llue):  !!29 factor per Page 111, j
8. If Changes Occur in Capacity Ratings (! tees llueber 3 Through 7) Since Last NURE6-0020. 1 Report. Give Reasons:

9 _ Power Level To Which Restricted, If Any (llet MWe):

10.' Reason For Restrictions, If any:

This Month Yr.-to-Bate Cuaulative

!!. Hours in Reporting Period 744.0 744.0 82873.0

12. Number of Hours Reactor Was Critical 744.0 744.0 64910.2
13. Reactor Reserve Shutdoun Hours - --0-- --0--
14. Hours Senerator On-Line 744.0 744.0 63881.7
15. Unit Reserve Shutdoun Hours - - - .,
16. Gross Thernal Energy Generated (MiiH) 2528638 2528638 205945176

' 17. Gross Electrical Energy Generated (MWH) 909424 909424 73013791

18. Net Electrical Energy Generated (MWH) 865470 865470 68777727
19. Unit Service Factor 100.0 100.0 77.1
20. Unit Availability Factor 100.0 100.0 77.1 ,
21. Unit Capacity Factor (Using MDC Net) 103.0 103.0 73.4
22. Unit Capacity Factor (Using DER Net) 101.6 101.6 72.5 ,
23. Unit Forced Outage Rate 0.0 0.0 8.8

]

24. Shutdown Scheduled Dyer Next 6 Months (Type, pate, and Duration of Each): j None j l

25._If Shut Dona At End Of Report Perled. Estiaated Date of Startup  ;

26. Units In Test Status (Prior ta Coseercial Operation): Forecast Achieved l INITIAL CRITICALITV INITIAL ELECTRICITY COMMERCIAL OPERATION i-p,-. i y

OPERATING DATA REPORT DOCKET N0 50-414 UNIT catada 2

DATE February 15. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MGMTH January.1996 l

E AYERA6 EDA!LYPOWERLEVEL M AVERAGE DAILY POWER LEVEL

( R -Net) t h -Net). i

!" 1165 17 1165

?

2 .. Ilu 18 till a

3 1166 19 1157 4  !!69 20 1164 5 11M - 21 1167 i 6 1161 22 1167 7 1162 23 1165  ;

, 8 1162 24 1160 9 1169 25 1167 10 1168' 26 1165 11 1168 27 1162 I i

' I 12 1163 29 11&&

13 1164 29 1165 14  !!M M llM 15 1164 11 Itu 16 1166

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME Carawisa z DATE v2/Ad/96 REPORT MONTH January 1996 COMPLETED BY x. A. Williams TELEPHONE t/us;-Juz-duse (1) (2) (3) (4) (5)

R MET-

  • E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)

F Forced Reason- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)

E-Operator training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

-o

DOCKET: 50-414 UNIT: Catawba 2 Date: 02/15/96 NARRATIVE

SUMMARY

-MONTH: January,1996

. Catawba Unit 2 began the month of January operating at 100% full power. The unit operated at or near 100% full power for the entire month.

I Prepared by: R. A. Williams Telephone: (704)- 382-5346 s-

, e.

MONTilLY REFUELING INFORMATION REOUEST

1. Facility name: Catawba. Unit 2
2. Scheduled next refueling shutdown: March 1997
3. Scheduled restart following refueling: April 1997 Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF '

ANY T.S. CilANGE OR LICENSE AMENDMENT. TliEREFORE, QUESTIONS 4

-TilROUGil 6 WILL NO LONGER BE M AINTAINED IN Tills REPORT.

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee ,

regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 124

- 8. Present licensed fuel pool capacity: 141]l j; Size of requested or planned increase: =

9. Projected date oflast refueling which can be accommodated by present license capacity:

September 2Hil l .'