Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20148N298 + (ML20148N298)
- IR 05000312/1978017 + (ML20148N299)
- 05000456/LER-1997-003-06, :on 970524,manually Opened Reactor Trip Occurred Due to Improper Rod Bank Overlap.Caused by Failure of Thumbwheel Switches Due to Dirty Contacts.Stopped Rod Motion,Cleaned Contacts & Revised Procedure + (ML20148N302)
- ML20148N309 + (ML20148N309)
- ML20148N322 + (ML20148N322)
- ML20148N326 + (ML20148N326)
- 05000266/LER-1997-025, :on 970520,pressurizer Level Was Controlled Higher than Assumed in Accident Analysis.Caused by Inappropriately Changing Procedures W/O Adequate Consideration.Listed Affected Procedures Will Be Revised + (ML20148N327)
- ML20148N330 + (ML20148N330)
- ML20148N333 + (ML20148N333)
- NUREG-0436, Responds to Re NRC Policy on Decomm of Nuc Facils.Encl Rept NUREG-0436,Plan for Reeval of NRC Policy on Decomm of Nuc Facils. Covers Alternate Methods of Financial Assistance,Tech,Safety & Cost.W/O Encl + (ML20148N335)
- ML20148N340 + (ML20148N340)
- ML20148N341 + (ML20148N341)
- ML20148N347 + (ML20148N347)
- ML20148N355 + (ML20148N355)
- 05000456/LER-1997-006-05, :on 970522,TS 3.0.3 Was Entered & Unit 1 Cooled Down Due to ECCS Venting Issue.Caused by Mgt Deficiency. Weekly Ultrasonic Exams of Piping Will Be Performed Until TS Is Changed + (ML20148N363)
- ML20148N365 + (ML20148N365)
- ML20148N367 + (ML20148N367)
- ML20148N370 + (ML20148N370)
- 05000259/LER-1988-011-02, :on 880304,three Emergency Equipment Cooling Water Pumps Inadvertently Started Due to Pressure Drop in Raw Cooling Water Sys.Caused by Personnel Error in Not Performing Valve Lineup.Personnel Counseled + (ML20148N371)
- ML20148N372 + (ML20148N372)
- B16519, Monthly Operating Rept for May 1997 for Millstone Nuclear Power Station,Unit 2 + (ML20148N375)
- ML20148N379 + (ML20148N379)
- IA-78-309, Responds to 781102 Request for 11 Documents Re Employee Overexposures.Documents Are Being Placed in Washington PDR + (ML20148N379)
- ML20148N383 + (ML20148N383)
- ML20148N384 + (ML20148N384)
- ML20148N386 + (ML20148N386)
- ML20148N390 + (ML20148N390)
- ML20148N395 + (ML20148N395)
- ML20148N401 + (ML20148N401)
- ML20148N404 + (ML20148N404)
- ML20148N405 + (ML20148N405)
- IR 05000312/1978015 + (ML20148N408)
- ML20148N411 + (ML20148N411)
- 05000302/LER-1997-002, :on 970129,out-of-calibr Fuel Storage Pool Water Level Transmitters Invalidated TS Surveillance.Caused by Lack of Commitment to & Mgt Oversight of Preventive Maint Program.Night Order Was Issued + (ML20148N412)
- ML20148N417 + (ML20148N417)
- ML20148N420 + (ML20148N420)
- ML20148N422 + (ML20148N422)
- ML20148N423 + (ML20148N423)
- NRC-88-0076, Forwards Updated Response to SALP 8 Board Rept,Per NRC 880202 Request.Most Actions Described in Util for Improving Performance Complete.Completion of Tech Spec Improvement Program Extended to 881231 + (ML20148N429)
- ML20148N445 + (ML20148N445)
- ML20148N453 + (ML20148N453)
- ML20148N459 + (ML20148N459)
- ML20148N460 + (ML20148N460)
- ML20148N467 + (ML20148N467)
- ML20148N471 + (ML20148N471)
- ML20148N481 + (ML20148N481)
- ML20148N492 + (ML20148N492)
- ML20148N495 + (ML20148N495)
- ML20148N497 + (ML20148N497)
- ML20148N499 + (ML20148N499)
- IA-79-312, Responds to 7811102 Request for 8 Ltrs Re Employee Overexposures & Airborne Releases & Leakage.Documents Are Being Placed in Washington Pdr.Names of Exposed Individuals Are Withheld + (ML20148N499)