Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20141C399 + (ML20141C399)
- ML20141C400 + (ML20141C400)
- 05000341/LER-1997-005, :on 970307,RBCCW to EECW Return & Supply Isolation Valve Interlocks,Installed in EECW Makeup Tank Isolation Valve Circuit Between Dedicated Shutdown Panel & Opening Coil.Caused by Inadequate Design.Revised Procedures + (ML20141C403)
- ML20141C404 + (ML20141C404)
- ML20141C408 + (ML20141C408)
- ML20141C409 + (ML20141C409)
- ML20141C411 + (ML20141C411)
- 05000354/LER-1997-008-01, :on 970520, C Swp Was Removed from Svc While a Pump Was Running in Manual.C Pump Automatically Restarted.Caused by Silt Accumulation Combining W/Hydraulic Perturbation.Sensing Lines Were back-flushed + (ML20141C414)
- ML20141C416 + (ML20141C416)
- ML20141C418 + (ML20141C418)
- ML20141C420 + (ML20141C420)
- ML20141C421 + (ML20141C421)
- ML20141C424 + (ML20141C424)
- ML20141C426 + (ML20141C426)
- ML20141C427 + (ML20141C427)
- 05000336/LER-1997-012, Forwards LER 97-012-00 Which Documents an Event That Occurred at Mnps,Unit 2 on 970410.Commitments Made within Ltr,Submitted + (ML20141C428)
- 05000254/LER-1997-020-01, :on 970519,B-train Control Room Ventilation Sys Became Inoperable When AHU Breaker Tripped When Performing Monthly Surveillance.Cause Could Not Be Determined.Circuitry Testing Completed + (ML20141C430)
- ML20141C432 + (ML20141C432)
- ML20141C434 + (ML20141C434)
- ML20141C436 + (ML20141C436)
- RBG-44001, Provides Suppl Response to GL 96-01.Suppl Provides Summary of Util Intended Corrective Actions for Conditions Described in Original Response + (ML20141C438)
- ML20141C439 + (ML20141C439)
- ML20141C440 + (ML20141C440)
- ML20141C442 + (ML20141C442)
- ML20141C444 + (ML20141C444)
- ML20141C445 + (ML20141C445)
- NRC-97-0060, Forwards Endorsements 166 & 165 to Nelia Policy NF-0092 & Endorsements 60 & 59 to Maelu Policy MF-0120 + (ML20141C447)
- ML20141C450 + (ML20141C450)
- ML20141C452 + (ML20141C452)
- ML20141C454 + (ML20141C454)
- ML20141C455 + (ML20141C455)
- 05000336/LER-1993-023-02, Forwards LER 93-023-02,documenting Event Occurred at Unit 2 on 930622.Commitments Made within Ltr Listed + (ML20141C457)
- ML20141C460 + (ML20141C460)
- ML20141C462 + (ML20141C462)
- 05000336/LER-1997-012-02, :on 970410,inadequate DG Start Surveillance Test Was Identified.Caused Because Personnel Was Unaware That Design of Circuitry for DG Ready to Load Annunciator Did Not Adequately Represent Engine Speed.Revised Sps + (ML20141C463)
- 3F0486-02, CR-3 Pump Support Configuration Study + (ML20141C464)
- 0CAN069706, Forwards Response to Violations Noted in Insp Repts 50-313/97-02 & 50-368/97-02.Corrective Actions:Procedure 1304.175 Satisfactorily Performed on 970206 & 07 + (ML20141C465)
- ML20141C472 + (ML20141C472)
- ML20141C474 + (ML20141C474)
- ML20141C476 + (ML20141C476)
- ML20141C477 + (ML20141C477)
- ML20141C478 + (ML20141C478)
- 05000461/LER-1997-014, :on 880426,MSIV Closure Time Testing Was Not Adequate,Due to Procedural Inadequacy.Revised DPS 9061.09 to Account for Full Valve Travel & Verified MSIV Operability Before Plant Start Up + (ML20141C479)
- ML20141C480 + (ML20141C480)
- ML20141C482 + (ML20141C482)
- ML20141C483 + (ML20141C483)
- 05000341/LER-1997-008, :on 970410,discovered Potential Common Mode Failure Mechanism for 480 Volt MCC Disconnect Switches Due to Not Being Fully Latched Due to Inadequate Maint.Cleaned & Lubricated Fused Disconnect Switches + (ML20141C484)
- IR 05000429/2005003 + (ML20141C485)
- ML20141C486 + (ML20141C486)
- ML20141C487 + (ML20141C487)
- ML20141C488 + (ML20141C488)