Special Rept 97-03:on 970529 Fire Barriers Were Impaired to Provide Backup Fire Protection Capabilities IAW TS Before Removing Sys from Svc.Sys Impaired to Implement Mods for Upgrade of HPFP Sys.Fire Watch Established
ML20141C488
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/18/1997
From: Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
97-03, 97-3, NUDOCS 9706250256
Download: ML20141C488 (3)


Text

_ . - - - -_

  • J . l

- . . 1 A

i Tennessee Valley Authority, Post Offee i3ox 2000. Soddy-Daisy, Tennessee 37379-2000 l

June 18,1997 l

I U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket No. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYATI NUCLEAR PLANT (SQN) - UNITS 1 and 2 - FACILITY OPERATING LICENSE DPR-77 and DPR SPECIAL REPORT 97-03 The enclosed special report provides details concerning penetration sleeves and two fire doors that are nonfunctional as fire barriers. This planned fire protection impairment supported the installation of the fire protection system modifications. This report is being submitted in accordance with TS 3.7.12 Action Statement (a).

If you have any questions concerning this submittal, please telephone J. W. Proflitt at (423) 843-6651.

Sincerely, f f), hf R. H. Shell Site Licensing and Industry Affairs Manager g'h&

J Enclosure cc: See page 2

\\G\\\\\\\?REE.0\\\$

t gg003 9706250256 970618 PDR ADOCK 05000327 S PDR

4 Ja ,as-+,p. - .A4 , , . ., 4 .,.._L 4x a .4_,.A A.4a.. m_

_ -_ _ - m.A 4 .a .s _ ..

d y.'

U.S. Nuclear Regulatory Commission Page 2 June 18,1997 l

cc (Enclosure):

Mr. R. W. Hernan , Project Manager U.S. Nuclear Regulatory Commission ,

One White Flint, North - l 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 l

U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsythe St., SW, Suite 23T85 Atlanta, Georgia 30303-3415 l

l l

l . .

ENCLOSURE t

l SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 and 2 SPECIAL REPORT 97-03 Description of Condition On May 29,1997, SQN started a planned outage to modify the High Pressure Fire Protection (HPFP) System. Fire barriers were impaired to provide backup fire protection capabilities in accordance with technical specifications before removing the system from service. Fire barrier penetrations and fire doors were removed from service on or after May 23,1997 to allow for routing of fire hoses.

Cause of Condition The fire protection system was impaired to implement modifications for the upgrade of the HPFP system.

Immediate Actions In accordance with technical specifications a fire watch was established after the fire detectors ,

on one side of the fire barrier were verified operable. The fire watch was maintained until 3e fire barriers were returned to operable status. The fire barriers were returned to service on on before June 11,1997.