ML20141C478

From kanterella
Jump to navigation Jump to search
Forwards LER 97-014-00,submitted IAW Requirements of 10CFR50.73.Commitments Made Listed
Date released: 06/03/2020 Download: ML20141C478


:on 880426,MSIV Closure Time Testing Was Not Adequate,Due to Procedural Inadequacy.Revised DPS 9061.09 to Account for Full Valve Travel & Verified MSIV Operability Before Plant Start Up
ML20141C479
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/18/1997
From: Allen J
ILLINOIS POWER CO.
To:
References
Download: ML20141C479 (4)
Forwards LER 97-014-00,submitted IAW Requirements of 10CFR50.73.Commitments Made Listed
ML20141C475
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/18/1997
From: Romberg W
ILLINOIS POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20141C475 (2)