Text
-
_
. .
,
In Reply Refer To:
g '2 8 fj86
Docket: 50-298/S6-02
,
Nebraska Public Power District
ATTN:
J. M. Pilant, Manager, Technical
-
Staf f-Nuclear Power Group
P. O. Box 499
Columbus, NE
6S601
Gentlemen:
This refers to the inspection conducted by Mr. D. DuBois and Mr. E. Plettner of
this office during the perioc January 1-February 28, 1986, of activities
i -
authcrized by NRC Operating Ucense DPR-46 for Cooper Nuclear Station, and to
the discuscion of our findings with Mr. Guy Horn and other members of your
staff et the conclusion of the inspection.
,
,
i
Areas examined during the inspection included fcilowup of TMI action plan
requirements, licecsee management changes, colo weather preparation,
preparation for refuelin,9, spent fuel shipments, plant trips - safety system
challenges, operational safety verification, and inonthly surveillance and
f
raintenance observations. Within these areas, the inspection consisted of
l
selective examination of procedures and representative records, interviews with
[
personnel, and observations by the inspectors.
These findings are documented
in the enclosed report.
During this inspection, it was fcund that certain of your activities were in
violation of NRC requirements. Consequently..you are required to respond to
this violation in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
j
Regulations. Your response shoult! he based on the s,pecifics contained in the
'
Notice of Violation enclosed with this letter.
l
The response directed by this letter and the accompanying Netice of Violation
is not subject to the clearance procedures of the Office of !4anagement and
Budget as required by the Paperwork Reduction Act of 1960, PL96-511.
Should you have any ouestions concerning this inspection, we will be pleased to
discuss them with you.
j
Sincerely,
i
Original Sigvid By
l
J. E. GagHardo
l
,1. E. Gagliardo, Chief
i
Reactor Projects Branch
Enc
es: (see n
page)
[
N
IV
4 :
I
RPG
p EAP ttner/sn DL Bois/sn
JP Odon
JEGagli r o
'2/2.1/86 '
)/y]/86
hfilf66
3 gf/
\\
/
l
\\
850,o7o245 $ eon
-
29e
eon
ADUCK
\\
t
I
(
0
i
L
r.
i
'.
.
.,
.
,
4
Nebraska Public' Power District
-2-
,.
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC' Inspection Report
50-298/86-02-
cc w/ enclosure:
Guy R. Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
. P. O. Box 98
1
'Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
I
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- Resident Inspector
.
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- EP&RPB
- RSB
MIS System
"'
- RIV File
- RSTS Operator
- w/766
,
'