a p
~
w h
APPENDIX A
?
Nebraska Publii: Power District Docket:
50-298 Cooper Nuclear Station License: DPR-46 4
~ During' an NRC inspection conducted on January 1 to February 28, 1986, a violation of NRC requirements was identified. ' The violation involved failure to have procedures which implecent completely. NRC regulations.
In accordance with the " General Statement of. Policy and Procedure for NRC Enforcement
' Actions," 10 CFR'Part 2, Appendix C (1985), the violation is listed below:
iInadequate Procedure' Implementing Regulations 10 CFR Part 50', Appendix B, Criterion V, requires that activities
~
affecting quality be prescribed by documented procedures and accomplished in accordance with these procedures.
10 CFR Part 50.54(m) requires that:
A senior operator be present in the control room at all times except when the unit is in cold shutdown A senior operator be present in the control room during refueling A licensed operator or a senior operator be present at the controls at all times when the unit is in a mode other than cold shutdown Contrary to the above, licensee Procedure 2.0.3, which specifies operator requirements, did not require that:
A senior operator be present in the control room at all times except when the unit is in cold shutdown A senior operator be present in the control room during refueling A licensed operator or senior operator be present at the controls at all times when the unit is in a mode other than cold shutdown This is a Severity Level V violation (Supplement I. E.)(8602-01).
Pursuant to the provisions of 10 CFR 2.201, Nebraska Public Power District is hereby required'to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1) the reason for the violations if admitted, (2)thecorrectivestepswhichhavebeentakenandtheresultsachieved, (3) the corrective steps which will be taken to avoid further violations, and 8604070247 e60320 PDR ADOCK 05000298 G
PDR m
! (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas af d day of ga d, 1986.
this
_