Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140A554 + (ML20140A554)
- ML20140A557 + (ML20140A557)
- NUREG-0830, Advises That Condition 2.c.(3)(a) of License NPF-30 Fulfilled,Based on & 860117 Rept Re Environ Qualification Program for Electrical Equipment.Program Previously Accepted Per NUREG-0830,Section 3.11 + (ML20140A558)
- ML20140A562 + (ML20140A562)
- PNO-III-86-024, on 860317,backup Reactor Protection Sys Trip Breaker Failed to Trip During Bus a Transfer from Primary Electrical Supply.Caused by Repeated Testing.Manual Scram Inserted.Investigation Underway + (ML20140A563)
- ML20140A565 + (ML20140A565)
- ML20140A566 + (ML20140A566)
- ML20140A569 + (ML20140A569)
- B11943, Forwards Results of LOCA Calculations & Proprietary Engineering Hot Channel... & Core Bypass Flow Summary Rept, in Support of 851211 Rev to Tech Specs,For Approval by 860301.Repts Withheld (Ref 10CFR2.790) + (ML20140A570)
- ML20140A571 + (ML20140A571)
- ML20140A572 + (ML20140A572)
- ML20140A574 + (ML20140A574)
- U-602748, Responds to Violations Noted in Insp Rept 50-461/96-15. Corrective Actions:Usar Change Package 7-70 Was Processed to Add Acceptance Criteria for HPCS Injection Valve Stroke Time to USAR Table 6.3-2 + (ML20140A575)
- ML20140A576 + (ML20140A576)
- ML20140A577 + (ML20140A577)
- ML20140A580 + (ML20140A580)
- ML20140A585 + (ML20140A585)
- ML20140A587 + (ML20140A587)
- ML20140A590 + (ML20140A590)
- ML20140A591 + (ML20140A591)
- ML20140A594 + (ML20140A594)
- U-600407, Forwards Rev 7 to Physical Security Plan,Updating & Clarifying Existing Info.Rev Withheld (Ref 10CFR73.21) + (ML20140A596)
- ML20140A598 + (ML20140A598)
- ML20140A599 + (ML20140A599)
- ML20140A600 + (ML20140A600)
- ML20140A602 + (ML20140A602)
- ML20140A604 + (ML20140A604)
- ML20140A608 + (ML20140A608)
- ML20140A609 + (ML20140A609)
- ML20140A610 + (ML20140A610)
- ML20140A613 + (ML20140A613)
- ML20140A614 + (ML20140A614)
- ML20140A615 + (ML20140A615)
- ML20140A616 + (ML20140A616)
- ML20140A617 + (ML20140A617)
- ML20140A618 + (ML20140A618)
- ML20140A620 + (ML20140A620)
- ML20140A622 + (ML20140A622)
- ML20140A624 + (ML20140A624)
- W3P86-0111, Forwards Program Control & Acceptance Criteria Bases to Be Implemented & Summary of Mods to Procedure PE-5-033 Per 851023-24 Meetings Re Basemat Monitoring Program + (ML20140A626)
- ML20140A628 + (ML20140A628)
- 2CAN059702, Responds to Violations Noted in Insp Repts 50-313/97-01 & 50-368/97-01 on 970202-0315.Corrective Actions:Out of Tolerance Portions of Procedure 2304.105 Were re-tested & Necessary Adjustments Completed + (ML20140A629)
- IR 05000461/1986003 + (ML20140A631)
- ML20140A632 + (ML20140A632)
- ML20140A633 + (ML20140A633)
- ML20140A636 + (ML20140A636)
- ML20140A637 + (ML20140A637)
- ML20140A640 + (ML20140A640)
- IR 05000324/1997002 + (ML20140A641)
- ML20140A644 + (ML20140A644)
- ML20140A645 + (ML20140A645)