Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138R184 + (ML20138R184)
- ML20138R185 + (ML20138R185)
- ML20138R186 + (ML20138R186)
- ML20138R188 + (ML20138R188)
- FVY-85-102, Requests Two Exemptions from Provisions of 10CFR50,App R, Section Iii.G, Fire Protection of Safe Shutdown Capability, for 24-volt Battery Chargers & Alternate Shutdown Sys Fuses + (ML20138R191)
- ML20138R192 + (ML20138R192)
- ML20138R193 + (ML20138R193)
- ML20138R194 + (ML20138R194)
- ML20138R196 + (ML20138R196)
- ML20138R198 + (ML20138R198)
- ML20138R199 + (ML20138R199)
- ML20138R200 + (ML20138R200)
- ML20138R201 + (ML20138R201)
- ML20138R202 + (ML20138R202)
- ML20138R203 + (ML20138R203)
- ML20138R205 + (ML20138R205)
- ML20138R207 + (ML20138R207)
- IR 05000295/1985041 + (ML20138R208)
- ML20138R209 + (ML20138R209)
- ML20138R213 + (ML20138R213)
- ML20138R214 + (ML20138R214)
- ML20138R215 + (ML20138R215)
- ML20138R217 + (ML20138R217)
- ML20138R219 + (ML20138R219)
- IR 05000456/1985055 + (ML20138R221)
- ML20138R223 + (ML20138R223)
- ML20138R226 + (ML20138R226)
- ML20138R227 + (ML20138R227)
- ML20138R228 + (ML20138R228)
- ML20138R230 + (ML20138R230)
- IR 05000440/1985088 + (ML20138R234)
- ML20138R235 + (ML20138R235)
- PNO-V-85-091, on 851225,during Full Load Rejection Test, Reactor Tripped on lo-lo Steam Generator Level & Coolant Pumps Tripped.Caused by over-responsive Turbine Control Sys & under-responsive Steam Dump Sys.Pumps Restarted + (ML20138R238)
- ML20138R239 + (ML20138R239)
- ML20138R241 + (ML20138R241)
- ML20138R242 + (ML20138R242)
- ML20138R243 + (ML20138R243)
- FVY-85-121, Notifies of Compliance W/Order Confirming Licensee Commitments on Pipe crack-related Issues.Conditions Will Be Complied W/Upon Completion of Reactor Recirculation & RHR Sys Replacement Program + (ML20138R245)
- ML20138R246 + (ML20138R246)
- ML20138R247 + (ML20138R247)
- ML20138R248 + (ML20138R248)
- IR 05000293/1985034 + (ML20138R249)
- ML20138R252 + (ML20138R252)
- ML20138R253 + (ML20138R253)
- ML20138R254 + (ML20138R254)
- ML20138R256 + (ML20138R256)
- B11916, Provides Supplemental Relief Request Info Re Inservice Insp & Testing Program.Main Feed Sys Check Valves 2-FW-5A & 2-FW-5B Cannot Be Tested Per ASME Boiler & Pressure Vessel Code.Periodic Valve Disassembly Suggested + (ML20138R257)
- 05000334/LER-1985-018, :on 851004,w/unit at 40% Power,First Out Annunciators & Vital Bus III Inverter Trouble Alarm Annunciated.Caused by Misfiring Silicon Control Rectifier. Plant Stabilized Per Emergency Procedures + (ML20138R258)
- IR 05000461/1985040 + (ML20138R259)
- U-600265, Forwards Response to SER Outstanding Issue 9 Re Suppression Pool Hydrodynamics.Existing Design Basis & Justification for Use of NEDE-13426P,Figure 6-9 Re Hydrodynamic Mass Values,Discussed + (ML20138R262)
- PNO-I-85-094, on 851226,reactor Scrammed on Low Reactor Water Level.Caused by Loss of Feed Pump & Fluctuations in Feedwater Level Control Sys.Condensate & Feedwater Sys Isolated.Rcic Sys Manually Started to Control Water Level + (ML20138R263)