Text
I
.
.
CEC 2 6198G
Docket No. 50-295
Docket No. 50-304
l
l
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. A. Gautam
and R. Smeenge of this office on November 12-19, 1985, of activities at Zion
Nuclear Power Station, Units 1 and 2, authorized by NRC Operating Licenses
No. DPR-39 and No. DPR-48 and to the discussion of our findings with
Mr. George Pliml and others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
. Original signed by D. H. Danielson for
J. J. Harrison, Chief
Engineering Branch
-Enclosure:
Inspection Report
No. 50-255/85041(DRS);
No. 50-304/85042(DRS)
See Attached Distribution
h$k
kha
[
t \\
G
1 dl-
-
.
DEC 2 61985
Commonwealth Edison Company
2
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
G. J. Plim1, Plant Manager
Jan Norris, Project Manager, NRR
U. Potopovs, Vendors Program Branch, IE
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
Mayor, City of Zion
i
RIII
RIII
RI
RI
.RIII
A+Gr
vs
.
-
r
Gautam/jp
Sme engef
am . -
ehl
son
/>l1$9
iht P
ifug
sv k
i
s/tr
.
. -
- .