ML20138R209
| ML20138R209 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 10/29/1985 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20138R211 | List: |
| References | |
| CON-#485-049, CON-#485-49 OL, NUDOCS 8511180492 | |
| Download: ML20138R209 (2) | |
Text
n i
1 i.
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET
[
P.O. BOX 8699 k
PHILADELPHIA, PA.19101 1215: e414ooo October 29, 1985 Docket No. 50-352 4
Dr. Thomas E. Murley, Administrator Region I U.S.
Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
~
SUBJECT:
Annual Fire Protection System Modification Report Limerick Generating Station Facility Operating License NPF-39 (and NPF-27)
Dear Dr. Murley:
Attached is a copy of the Limerick Generating Station Annual Report of the modifications made to the Fire Protection System during the period October, 1984 thru August, 1985 as required by 10 CFR Section 50.59 and License Condition 2.C. (3)c.
which requires the submittal of an annual report of changes made to the approved fire protection program without prior Nuclear Regulatory Commission approval.
The attached report consists of a listing of the following information for each modifications o
The Philadelphia Electric Company Plant Modification (or document) " Tracking Number" o
The " Title or Name" of the system, subsystem or document which was changed o
A " Description" of the change o
The " Reason" for making the change o
A " Summary" of the written safety evaluation vb*ra v
4 8511180492 851029 Ch,gg,#S p,
t o
ADOCKOSOOg2 DR
~
~
-Dr. Thonao E. Murlcy October 29, 1985 Page 2 Thirty-nine copies of the attached report, as required by 10 CFR Section 50.59, are being sent to you under separate Cover.
In the future, modifications made to the Fire Protection System will be included in the Annual Plant Modification Report.
Should you have any questions or require furE;.er information, please do not hesitate to contact us.
Very truly yours, M
, ~ y W. M. Alden Engineer-In-Charge Nuclear Services Enclosure cca Mr. James M. Taylor, Dir., Office of Inspection & Enforcement E. M. Kelly, Senior Resident Site Inspector See Attached Service List (w/o attachment) r
-_