Forwards Safety Insp Repts 50-440/85-88 & 50-441/85-27 on 851202-06 & 09-13.No Violation Noted
ML20138R227
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/26/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20138R228 List:
References
NUDOCS 8512310072
Download: ML20138R227 (2)


See also: IR 05000440/1985088

Text

r

.

.

h.

' , .

.

.

DEC 261985

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH .44101

Gentle. men:

-

This refers to the routine safety inspection conducted by C. H. Scheibelhut

of this office on December 2-6 and 9-13, 1985, of activities at Perry

Nuclear Power Plant, authorized by NRC Construction Permits No. CPPR-148 and

No. CPPR-149 and to the discussion of our findings with Messrs. M. D. Lyster,

F. R. Stead and C. M. Shuster.at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas,.the inspection consisted of a selective

examination of procedures and~ representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

"Orl3 GN SIf/43.t,y.P., F. O ra W

I

R. F. Warnick, Chief

Projects Branch l'

Enclosure:

Inspection Reports

No. 50-440/85088(DRP);

No. 50-441/85027(DRP)

See Attached Distribution

?Dk hf0CK 0500

72 851226

w

\\

R 4)

G

Warnick/jp

o

I

j g tY

,,

.

. _

.

. .

-.

.

. - . .

..

-

.-

.

-

.

.

4

DEC 261985

The Cleveland Electric Illuminating

2

Company

Distribution

I

cc w/ enclosure:

-

'

J. J. Waldron, Manager, Perry

Plant Technical Department

1

M. D. Lyster, Manager, Perry Plant

1

Operations Department

'

L. O. Beck,. General Supervising

Engineer, Nuclear Licensing and

Fuel Management Section-

DCS/RSB (RIDS)

Licensing Fee Management Branch

-

Resident Inspector, RIII

i

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.