Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138R027 + (ML20138R027)
- ML20138R030 + (ML20138R030)
- ML20138R031 + (ML20138R031)
- DD-85-17, Notice of Issuance of Directors Decision DD-85-17 Under 10CFR2.206 Re Alleged Equipment Qualification Deficiencies at Facility.Concerns Identified in State of Me 840626 Comments Adequately Addressed + (ML20138R032)
- TXX-3649, Responds to 830121 Request for Addl Info Re Item 3 of IE Bulletin 81-03.Encl Clarifies 810626 Response + (ML20138R033)
- ML20138R034 + (ML20138R034)
- ML20138R036 + (ML20138R036)
- 05000346/LER-1985-020, :on 851004,during Maint on Fire Protection Sys, Diesel Fire Pump Tripped.Caused by Broken Pump Speed Switch Connection & Defective Coolant Pump Seal.Repair & Full Operability of Pump Awaiting Receipt of Parts + (ML20138R037)
- ML20138R038 + (ML20138R038)
- ML20138R039 + (ML20138R039)
- ML20138R041 + (ML20138R041)
- ML20138R042 + (ML20138R042)
- ML20138R044 + (ML20138R044)
- ML20138R045 + (ML20138R045)
- ML20138R046 + (ML20138R046)
- ML20138R048 + (ML20138R048)
- ML20138R049 + (ML20138R049)
- ML20138R050 + (ML20138R050)
- ML20138R051 + (ML20138R051)
- ML20138R052 + (ML20138R052)
- ML20138R053 + (ML20138R053)
- ML20138R054 + (ML20138R054)
- ML20138R055 + (ML20138R055)
- ML20138R056 + (ML20138R056)
- JAFP-85-0781, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-333/85-13.Corrective Actions:Procedures for Plant Drawing Control & Control of Vendor Technical Manuals Will Be Issued by 851031.Drawing Update Procedure Modified + (ML20138R057)
- ML20138R058 + (ML20138R058)
- ML20138R059 + (ML20138R059)
- ML20138R060 + (ML20138R060)
- ML20138R061 + (ML20138R061)
- ML20138R062 + (ML20138R062)
- PNO-II-85-107, on 851107,plant Taken out-of-svc After Verification of Turbine High Bearing Temp.Caused by Main Turbine Bearing Failure.Plant Expected to Be Shut Down for 5 to 14 Days for Repairs + (ML20138R063)
- ML20138R064 + (ML20138R064)
- ML20138R066 + (ML20138R066)
- ML20138R067 + (ML20138R067)
- ML20138R069 + (ML20138R069)
- ML20138R070 + (ML20138R070)
- ML20138R071 + (ML20138R071)
- ML20138R072 + (ML20138R072)
- ML20138R073 + (ML20138R073)
- ML20138R074 + (ML20138R074)
- ML20138R075 + (ML20138R075)
- IR 05000456/1985033 + (ML20138R076)
- ML20138R079 + (ML20138R079)
- ML20138R080 + (ML20138R080)
- ML20138R081 + (ML20138R081)
- ML20138R083 + (ML20138R083)
- ML20138R084 + (ML20138R084)
- ML20138R085 + (ML20138R085)
- ML20138R086 + (ML20138R086)
- ML20138R087 + (ML20138R087)
- ML20138R089 + (ML20138R089)