Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138R006 + (ML20138R006)
- ML20138R007 + (ML20138R007)
- ML20138R008 + (ML20138R008)
- ML20138R009 + (ML20138R009)
- ML20138R010 + (ML20138R010)
- 2CAN128507, Application for Amend to License NPF-6,changing Tech Specs to Clarify Responsibility of Safety Review Committee Appointments & Total Membership of Committee & to Make Section 6.5.2.8 Consistent W/Sts.Fee Paid + (ML20138R012)
- ML20138R013 + (ML20138R013)
- ML20138R014 + (ML20138R014)
- ML20138R015 + (ML20138R015)
- ML20138R016 + (ML20138R016)
- ML20138R017 + (ML20138R017)
- ML20138R018 + (ML20138R018)
- ML20138R019 + (ML20138R019)
- TXX-4643, Summarizes Activities Associated W/Control of Corbicula Sp (Asian Clams) & Microbiologically Induced Corrosion,Per 851028 Telephone Request + (ML20138R021)
- ML20138R023 + (ML20138R023)
- ML20138R025 + (ML20138R025)
- 05000387/LER-1984-044, :on 840613,average Rod Scram Insertion Time Required by Tech Spec 3.1.3.4 Not Met for All Rods. Apparently Caused by Poor Control Rod Scram Pilot Valve Performance.Valves Modified + (ML20138R026)
- ML20138R027 + (ML20138R027)
- ML20138R030 + (ML20138R030)
- ML20138R031 + (ML20138R031)
- DD-85-17, Notice of Issuance of Directors Decision DD-85-17 Under 10CFR2.206 Re Alleged Equipment Qualification Deficiencies at Facility.Concerns Identified in State of Me 840626 Comments Adequately Addressed + (ML20138R032)
- TXX-3649, Responds to 830121 Request for Addl Info Re Item 3 of IE Bulletin 81-03.Encl Clarifies 810626 Response + (ML20138R033)
- ML20138R034 + (ML20138R034)
- ML20138R036 + (ML20138R036)
- 05000346/LER-1985-020, :on 851004,during Maint on Fire Protection Sys, Diesel Fire Pump Tripped.Caused by Broken Pump Speed Switch Connection & Defective Coolant Pump Seal.Repair & Full Operability of Pump Awaiting Receipt of Parts + (ML20138R037)
- ML20138R038 + (ML20138R038)
- ML20138R039 + (ML20138R039)
- ML20138R041 + (ML20138R041)
- ML20138R042 + (ML20138R042)
- ML20138R044 + (ML20138R044)
- ML20138R045 + (ML20138R045)
- ML20138R046 + (ML20138R046)
- ML20138R048 + (ML20138R048)
- ML20138R049 + (ML20138R049)
- ML20138R050 + (ML20138R050)
- ML20138R051 + (ML20138R051)
- ML20138R052 + (ML20138R052)
- ML20138R053 + (ML20138R053)
- ML20138R054 + (ML20138R054)
- ML20138R055 + (ML20138R055)
- ML20138R056 + (ML20138R056)
- JAFP-85-0781, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-333/85-13.Corrective Actions:Procedures for Plant Drawing Control & Control of Vendor Technical Manuals Will Be Issued by 851031.Drawing Update Procedure Modified + (ML20138R057)
- ML20138R058 + (ML20138R058)
- ML20138R059 + (ML20138R059)
- ML20138R060 + (ML20138R060)
- ML20138R061 + (ML20138R061)
- ML20138R062 + (ML20138R062)
- PNO-II-85-107, on 851107,plant Taken out-of-svc After Verification of Turbine High Bearing Temp.Caused by Main Turbine Bearing Failure.Plant Expected to Be Shut Down for 5 to 14 Days for Repairs + (ML20138R063)
- ML20138R064 + (ML20138R064)
- ML20138R066 + (ML20138R066)
- ML20138R067 + (ML20138R067)