Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000275/LER-1985-036, :on 851119,discovered That Safety Injection & Charging Pump Suction Crosstie Valve Surveillances Not Performed Since 850814.Caused by Personnel Error.Test Performed + (ML20138P937)
- ML20138P939 + (ML20138P939)
- ML20138P941 + (ML20138P941)
- ML20138P943 + (ML20138P943)
- ML20138P947 + (ML20138P947)
- ML20138P948 + (ML20138P948)
- ML20138P949 + (ML20138P949)
- ML20138P953 + (ML20138P953)
- ML20138P954 + (ML20138P954)
- ML20138P955 + (ML20138P955)
- ML20138P956 + (ML20138P956)
- IR 05000293/1985028 + (ML20138P957)
- ML20138P961 + (ML20138P961)
- ML20138P962 + (ML20138P962)
- ML20138P963 + (ML20138P963)
- ML20138P967 + (ML20138P967)
- ML20138P968 + (ML20138P968)
- ML20138P969 + (ML20138P969)
- ML20138P974 + (ML20138P974)
- ML20138P975 + (ML20138P975)
- ML20138P977 + (ML20138P977)
- 05000395/LER-1985-032, :on 851217,24-volt Dc Motor Associated W/ Voltage Regulator for Emergency Diesel Generators Failed. Caused by Cracked Delron Pinion Gear in Motor Housing.Gear Matl & Lubricant May Be Incompatible + (ML20138P978)
- ML20138P979 + (ML20138P979)
- ML20138P980 + (ML20138P980)
- ML20138P981 + (ML20138P981)
- ML20138P982 + (ML20138P982)
- ML20138P983 + (ML20138P983)
- 05000029/LER-1985-006, :on 851120,during Surveillance Testing,Three Main Condensate Pump Circuit Breakers Failed to Open on Receipt of Trip Signal.Caused by Open Circuit + (ML20138P984)
- ML20138P985 + (ML20138P985)
- ML20138P987 + (ML20138P987)
- 05000293/LER-1985-033, :on 851127,during Insp 85-32 Identified That Monthly Instrument Channel Checks of Main Stack & Reactor Bldg Vent Waste Gas Monitors Not Performed,Per Tech Spec Section 4.8.B.10.New Procedure Developed + (ML20138P993)
- ML20138P995 + (ML20138P995)
- RC-97-0024, Comment on Proposed Generic Communication, Effectiveness of Ultrasonic Testing Sys in Inservice Inspection Programs. GL Seems to Approach Mandating Implementation of App Viii Requirements + (ML20138P997)
- 05000373/LER-1985-067-01, :on 851120,control Room Ventilation/Auxiliary Electric Equipment Room Ventilation Sys Chlorine Detector B Spuriously Alarmed.Cause Undetermined.Detector Reset + (ML20138P998)
- ML20138Q000 + (ML20138Q000)
- 05000251/LER-1985-025-01, :on 851123,reactor Trip Occurred at Hot Standby Conditions.Caused by Intermediate Range Detectors Overcompensated Due to Voltage Setpoint Drift.Compensation Voltage Adjusted + (ML20138Q001)
- ML20138Q004 + (ML20138Q004)
- 05000206/LER-1985-017-02, :on 851121,reactor Manually Tripped in Response to Loss of Vital Bus 4 Power.Vital Bus Lost Power When Station Reserve Auxiliary Transformer Tripped by Relay Protection Circuitry.Cause Under Investigation + (ML20138Q006)
- ML20138Q007 + (ML20138Q007)
- ML20138Q009 + (ML20138Q009)
- ML20138Q010 + (ML20138Q010)
- ML20138Q013 + (ML20138Q013)
- ML20138Q017 + (ML20138Q017)
- ML20138Q019 + (ML20138Q019)
- ML20138Q020 + (ML20138Q020)
- ML20138Q022 + (ML20138Q022)
- ML20138Q023 + (ML20138Q023)
- ML20138Q024 + (ML20138Q024)
- 05000382/LER-1997-002, :on 970130,72 H Administrative Action Statement Entered Due to Declaring Shutdown Cooling HX B Inlet & Outlet Valves SI-125B & SI-412B Inoperable.Valves Declared Operable After Installation of Relief Devices + (ML20138Q025)
- IR 05000346/1985036 + (ML20138Q026)
- ML20138Q027 + (ML20138Q027)