Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138N645 + (ML20138N645)
- IR 05000062/1985003 + (ML20138N646)
- 05000483/LER-1985-042, :on 851002,feedwater Isolation,Auxiliary Feedwater Actuation & Steam Generator Blowdown Isolation Occurred as Result of Reactor Trip.Caused by Personnel Troubleshooting During RCS Test + (ML20138N647)
- ML20138N648 + (ML20138N648)
- ST-HL-AE-1501, Forwards Response to Draft SER or FSAR Items on Chapter 9, Including marked-up FSAR Pages to Be Incorporated Into Future FSAR Amend.Draft SER & FSAR Open & Confirmatory Items & Open NRC Questions Listed + (ML20138N649)
- ML20138N650 + (ML20138N650)
- 05000352/LER-1997-001-01, :on 841026,failed to Test safety-related Logic Circuits.Caused by Inadequate Test Procedures.Tested & Restored Untested Contacts to Operable Status & Will Revise Appropriate Surveillance Test Procedures + (ML20138N651)
- ML20138N652 + (ML20138N652)
- ML20138N653 + (ML20138N653)
- ML20138N654 + (ML20138N654)
- ML20138N655 + (ML20138N655)
- ML20138N656 + (ML20138N656)
- ML20138N657 + (ML20138N657)
- TXX-4608, Informs of Mgt Appointments.Ab Scott Appointed as Vice President of Nuclear Operations & J Kuykendall Appointed Vice President within Nuclear Organization + (ML20138N658)
- ML20138N660 + (ML20138N660)
- ST-HL-AE-1504, Forwards Response to Draft SER or FSAR Items Re Facility Operating limits.Marked-up FSAR Pages Will Be Included in Future Amend + (ML20138N663)
- ML20138N666 + (ML20138N666)
- IR 05000456/1984021 + (ML20138N667)
- ML20138N668 + (ML20138N668)
- ML20138N670 + (ML20138N670)
- ML20138N671 + (ML20138N671)
- ML20138N674 + (ML20138N674)
- ML20138N675 + (ML20138N675)
- IR 05000806/2011004 + (ML20138N676)
- ML20138N677 + (ML20138N677)
- ML20138N678 + (ML20138N678)
- ML20138N680 + (ML20138N680)
- ML20138N681 + (ML20138N681)
- 3F1285-03, Forwards Fire Protection Evaluations 4, Domestic Water Supply to Nuclear Svc & Decay Heat Seawater Pump Bearings & 5, Crystal River Unit 3 Hose Station Length Discrepancies. Fee Paid + (ML20138N682)
- ML20138N683 + (ML20138N683)
- ML20138N684 + (ML20138N684)
- ML20138N685 + (ML20138N685)
- ML20138N686 + (ML20138N686)
- ML20138N688 + (ML20138N688)
- ML20138N689 + (ML20138N689)
- ML20138N690 + (ML20138N690)
- ML20138N692 + (ML20138N692)
- ML20138N693 + (ML20138N693)
- ML20138N694 + (ML20138N694)
- ML20138N695 + (ML20138N695)
- ML20138N697 + (ML20138N697)
- ML20138N699 + (ML20138N699)
- ML20138N700 + (ML20138N700)
- 05000315/LER-1985-062, :on 851117,lower Containment Airborne Monitor Particulate Channel Train B Alarmed High,Producing ESF Actuation Signal.Caused by Monitor Trending Upward.High Alarm & Alert Alarm Setpoints Readjusted + (ML20138N701)
- ML20138N702 + (ML20138N702)
- ML20138N703 + (ML20138N703)
- ML20138N704 + (ML20138N704)
- 05000325/LER-1985-063, :on 851116,primary Containment Group 3 Isolation Occurred Due to Erroneous RWCU Sys Leak High Signal.Caused by K604 Functioning Out of Allowable Instrument Tolerances + (ML20138N706)
- ML20138N707 + (ML20138N707)
- ML20138N708 + (ML20138N708)
- PNO-IV-85-065, on 851216,Koony X-Ray,Inc Radiography Truck, Containing 60-Ci Ir-192 Camera,Stolen.Camera Properly Stored in Locked Box + (ML20138N709)