ML20138N678

From kanterella
Jump to navigation Jump to search
Forwards Sys Operational Performance Insp Rept 50-263/96-09 on 961118-970108 & Nov.Violation of Concern Because of Continuing Problems W/Test Control & Incorporation of Corrective Design Limits
Date released: 05/31/2020 Download: ML20138N678


Insp Rept 50-263/96-09 on 961118-970108.Violations Noted. Major Areas Inspected:Maintenance,Engineering & Operations
ML20138N699
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/20/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20138N699 (97)
Notice of Violation from Insp on 961118-970108.Violation Noted:On 960814,during Closeout of Design Change Package RHR Sys Pressure Upgrade Mod, Rev 1,safety Evaluation Failed to Provide Bases for Determination
ML20138N693
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/20/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
Download: ML20138N693 (3)
Forwards Sys Operational Performance Insp Rept 50-263/96-09 on 961118-970108 & Nov.Violation of Concern Because of Continuing Problems W/Test Control & Incorporation of Corrective Design Limits
ML20138N675
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 02/20/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: WADLEY M D
NORTHERN STATES POWER CO.
References
Download: ML20138N675 (3)