Responds to NRC Re Violations Noted Re Util Activities W/Metalweld,Inc.Corrective Actions:Coatings for Spray Header,Polar Crane Box Beam Girder & Refueling Floor Bridge Crane Observation Platform Reworked
ML20138N680
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/13/1985
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
PY-CEI-OIE-0148, PY-CEI-OIE-148, NUDOCS 8512240108
Download: ML20138N680 (3)


Text

o e

Qh t THE CLEVELAND ELECTR P.O. BOX 5000 : - CLEVELAND. oHlo 44101 - TELEPHONE (D6) 622-9800 - ILLUMINATING BLOG. - 55 PUBLICSQUARE Serving The Best Location in the Nation PRI0i!ITY RC'JIIU3 MURRAY R. EDELMAN First ininf(

vlCE PRESIDENT f

g' NUCLEAR pg g

p DHS EL ydSS OL uwA 0J

  1. f0 December 13, 1985 FILEffdfV PY-CEI/0IE 0148 L Hr. Charles E. Norelius, Director Division of Reactor Projects. Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441

Dear Mr. Norelius:

In response to your letter of November 4,1985, relative to activities associated with Metalweld. Inc., The Cleveland Electric Illuminating Company (CEI) has investigated each of the five concerns noted. We have analyzed each concern, performed necessary inspections and conducted appropriate investigations to determine the validity and significance of the conditions. Additionally, appropriate actions have been taken to address both the specific concerns and root causes. Our review noted that Concerns 2, 3 and 4 were discovered during. routine inspections and were documented and tracked on Nonconformance Reports prior to our receipt of your concern.

Below is a summary of the results of our investigations and inspections as well as the action taken to date to resolve each concern.

Investigative Results for Concern #1 Background checks and inspections of applicable work areas failed to substantiate the improper use of controlled substances at the Perry Nuclear Power ?lant (PNPP). To further substantiate that work was performed in accordance with the high quality standards of PNPP, a reinspection of 28 selected areas was performed in which the identified craft and inspection personnel had worked common areas. No workmanship deficiencies were noted. This inspection coupled with a review of the contractor's quality program indicated that the program was effective in ensuring quality workmanship at every stage of the process.

051224010e85121]4o DEC 161985 PDR ADOCK 050 o $6 0\\

o s

1

4 y

1 ~

w av, ga -

t i

[j-

y y

, j ',

n

_f p

5

- Mr2 Charica E. - Nor:liusi

.-2-'

.D:ccabar 13. 1985

+

~

7 PY-CEI/0IE 0148.L.

~

~

g

~

_t

~

?Investinative Results for Corearn~#2~

  • [

x r

=

n-

$Q X

LInvestigation(revealed;that.a Nonconformance Report;(NR) was written on; Ic November,1 '1985 assa result offtheLidentificationLof coating. defects on c

r ythe1 spray headers during(a routine inspection.1 However,jtodetermine-if

~

the-defects were; generic in nature. a visual. inspection of all: spray a- ~

i

~beaders and's detailed l inspection of four of the six spray headers was conducted? fThe inspection identifiedJonly. minimal additional defe' cts 4 -

J

[(3 spots" the size _of fa quarter). : The total area' of defnets (including j

, ~

ythe initia1Ldiscovered1 defects) was only 0.75 square feet over a total.

l,, area ofi2;648' square feed <This amounts to a 0.03%_ defect ratio caused ^

^

by-overspray and/or. construction damage.'; Investigation substantiated s

that;these defects /were.not= caused by excessive surface temperature or-1

~

~ ' s

~'

9 poor; surface preparation.; These defects were mapped and the NR.was pgba

-; a revised to address.all' minor defects. The coatings'haveibeen reworked.'

EInvestinative Results for-Concern #3-K,

An;investiga' tion lintoithis. concern' revealed that'a Nonconformance Report-

!was written on October 14.(1985;to address coating' deficiencies on the p

1polarccrane,boxbeamjgirder.

Investigation-revealed that the cracked.

-. costing;was-caused by-fallure of. cohesion;of the zinc primer on the weld

~

,,y

. farea due to'the unique configuration-of the area.--NDE examination of the.

Iweld (full.penetiation' veld with fillet velds on ~each side);in the~ vicin-

~'$ "f = lity' ofjthe coating-cracks indicated no-weld defects exist. The coatings j-have.been reworked..

l

~.~.

~

-Investinative Results for Concern #4 g

x

-F.

.,V

' Investigation into this<' concern revealed that a Nonconformance Report addressing defective; coatings' on the. auxiliary platform (referred to in gthe concern as;the refueling-floor' bridge crane. observation platform) w'as t

issued on - September - 11, 1985.

Inspection of the platform. revealed rust-

~

sing had occurred-due to inadequate surface preparation at the vendor's

~

shop. s Since the ~ auxiliary platforms were ;the only' equipment supplied by 1 ~

ithe vendor, it'was determined ~to be'an isolated. case'. We are currently

' nX hel process"of reworking the coating on the platform.

i t

. Y v

Investimative Results for Concern #5-

- LInterviews=with cognizant personnel did not* substantiate the.use of

=

< tungsten carbide tipped drill: bits to prepare surfaces for coating. ~

V However.' interviews with QC inspectors and a painter revealed deburring'

_ m tools' were -used by painters on structural steel. shapes. Further discus-

)

Tsion revealed that.there devices are permitted by the Steel Structures-s 1

Painting Councily(SSPC). 'Esch individual interviewed noted that these' 1

~

. devices were not used on welds, pipe..or snubbers, and uses were limited.

y

- Ltofremoving sharp' edges.from structural steel shapes. There were no

/ indications that excessive metal was removed.

x s

a<

3

.J h) y

~

a t

^ k:-

b sa

. 1 A

m.

e.

f

- p_ s. 3_,

. Mr. Charles E. Nor:lius -

D:ctabar 13. 1985 PY-CEI/0IE 0148 L m

A Documentation-outlining the extent of our investigation and supporting

- ou'r'results.is.being maintained on site. These files.are op'en for your

. review.. We believe-the supporting documentation we have gathered will

- adequately, address each of the concerns you have brought to our attention. VIf you have any questions..please call.

s Sincerely.

- Murray R. Edelman-Vice President f:

Nuclear Group Y s;r -