Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138J820 + (ML20138J820)
- ML20138J821 + (ML20138J821)
- 05000245/LER-1994-020-01, :on 940527,SW Sys & ESW Sys Pump Motors Could Not Be Demonstrated to Be Operable During Several Loss of Intake Structure Scenarios.Caused by Inadequate Engineering Evaluation.Hvac Sys Will Be Reviewed + (ML20138J822)
- ML20138J824 + (ML20138J824)
- ML20138J825 + (ML20138J825)
- ML20138J826 + (ML20138J826)
- ML20138J827 + (ML20138J827)
- ML20138J828 + (ML20138J828)
- ML20138J829 + (ML20138J829)
- ML20138J830 + (ML20138J830)
- ML20138J832 + (ML20138J832)
- ML20138J833 + (ML20138J833)
- ML20138J834 + (ML20138J834)
- ML20138J835 + (ML20138J835)
- ML20138J837 + (ML20138J837)
- ML20138J839 + (ML20138J839)
- ML20138J840 + (ML20138J840)
- 05000397/LER-1985-059, :on 851113,scram Occurred Due to Failure of Power to Control Reactor Feedwater Sys Reactor Pressure Vessel Level Instrument Channel.Caused by Failed Critical Instrument Power Inverter.Study Underway + (ML20138J842)
- ML20138J844 + (ML20138J844)
- ML20138J845 + (ML20138J845)
- ML20138J847 + (ML20138J847)
- ML20138J850 + (ML20138J850)
- ML20138J852 + (ML20138J852)
- ML20138J854 + (ML20138J854)
- ML20138J855 + (ML20138J855)
- 05000282/LER-1997-001, :on 970108,auxiliary Building Crane Protective Features Defeated by Wiring Errors.Caused by Wiring Change for New Transmitter critical/non-critical Key Switch. Controllers Being Made to Agree W/One Another + (ML20138J856)
- ML20138J858 + (ML20138J858)
- IA-97-134, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR + (ML20138J858)
- ML20138J861 + (ML20138J861)
- ML20138J863 + (ML20138J863)
- ML20138J864 + (ML20138J864)
- ML20138J866 + (ML20138J866)
- ML20138J867 + (ML20138J867)
- 05000272/LER-1985-011-01, :on 850922,unidentified RCS Leakage Exceeded Allowable Tech Spec Limit.Caused by Operator Error & Lack of Procedure.Steam Leaks Repaired,New Procedure Developed & Personnel Counseled + (ML20138J869)
- ML20138J870 + (ML20138J870)
- ML20138J873 + (ML20138J873)
- ML20138J874 + (ML20138J874)
- ML20138J875 + (ML20138J875)
- DD-97-05, Denies 970307 Request for Commission Review of Directors Decision DD-97-05.NRC Staff Will Respond to Concerns Re Further Use of VSC-24 Casks + (ML20138J879)
- ML20138J882 + (ML20138J882)
- ML20138J883 + (ML20138J883)
- ML20138J884 + (ML20138J884)
- ML20138J885 + (ML20138J885)
- ML20138J887 + (ML20138J887)
- ML20138J888 + (ML20138J888)
- ML20138J889 + (ML20138J889)
- ML20138J891 + (ML20138J891)
- ML20138J898 + (ML20138J898)
- ML20138J900 + (ML20138J900)
- ML20138J901 + (ML20138J901)
- ML20138J904 + (ML20138J904)
- ML20138J905 + (ML20138J905)