May 2,1997 9.'
s l
MEMORANDUM T0: Marylee M. Slosson, Acting Director-Division of Reactor Program Management FROM:
Alfred E. Chaffee, Chief [0riginal signed by)
Events Assessment and Generic Communications Branch Division of Reactor Program Management
SUBJECT:
OPERATING REACTORS EVENTS BRIEFING APRIL 30, 1997 - BRIEFING 97-03 On April 30, 1997, we conducted an Operating Reactors Events Briefing (9/-07) 4 to inform senior managers from offices of the Commission, AE00, NRR and i
regional offices of selected events that occurred since our last briefing on March 12, 1997. Attachment I lists the attendees. Attachment 2 presents the significant elements of the discussed events.
, contains reactor scram statistics for the weeks ending March 16, March 23, March 30, April 20, and April 27, 1997. No significant events were identified for input into the NRC Performance Indicator Program.
The statements contained in the attached briefing slides represent the best information ' currently available to the NRC.
Future followup could produce new information that may alter the NRC's current view of the events discussed.
Attachments: As stated (3) l cc w/atts:
See next page j
CONTACT: Kathy Gray, NRR l
(301) 415-1166 i
,DISTRI@llQH:
(w/atts)
Centralefiles PUBLIC LKilgore, SECY L
PECB R/F KGray TKoshy qq,7a
- v...i...,,.e ini.a. \\KAG\\.0RTRANS DOCUMENT NAME: G:
i,
. indw i. in, non: c. c ywien. 4 t.cnm.ne.nci..,.
r - c.,y with.et. chm.nt/.ac.i..o,.
= - socopy ftCB C/K CB l N 6
l
~~
<a,.m u w un.8 % :lw.a(( pTp cpo$ 1 omer ncB lE' ftCB 3
a cn.,,.. m DATE 06/ i) { /97 p
061d i /97 06/ V /96 06/,[
/97 l
WDCIAL RECORRLT^Y u._ D R A C -l a
090010
- dv4mf,'
tp-i I
b Y
~
9705090126 970502 PDR ORG NRRA J
~
_.. ~ _ _. _ _. -
i I
a cc:
S. Collins, NRR (0-12G18) i F. Miraglia, NRR (0-12G18)
A. Wang, NRR (014820) i F. Gillespie, NRR (0-12G18)
P. Milano, NRR (O'.1820)
R. Zimmerman, NRR (0-12G18)
T. Martin, NRR (0-12G18) j
- 8. Sheron, NRR (0-12G18)
S. Varga, NRR (0-14E4)
J. Zwolinski, NRR (0-14H3)'
J. Roe, NRR (0-13E4)
E. Adensam, NRR (0-13E4)
G. Lainas, NRR (0-7026)-
l G. Holahan, NRR (0-8E2)-
D. O'Neal, NRR (0-10E4) i B. Boger, NRR (0-9E4)
M. Markley, ACRS (T-2E26)
D. Ross, AE0C (T-4018)
C. Rossi, AEOD (T-4A9)
F. Congel, AE00 (T-4D28)
R. 8arrett, AEOD (T-4A43) i-S. Rubin, AE00 (T-4028)
M.. Harper, AE00 (T-4A9) i-W. Leschek, AEOD (T-4A9)
V. McCree, E00 (0-17021)
J. Gilliland, PA (0-2G4)
D. Morrison, RES (T-10F12)
W. Hill, SECY (0-16G15)
H. Miller, Region !
j C. Hehl, Regien I L. Reyes, Region II d
J. Johnson, Region II
- 5. Vias, Region II A. Beach, Region III J. Caldwell, Region III E. Mershoff, Region IV P.'Gwynn, Region IV K. Perkins, Region IV/WCF0 G. Fader,'INP0 J. Zimmer, DOE
_J
LIST OF ATTENDEES l
\\
OPERATING REACTORS EVENTS FULL BRIEFING (97-03) i APRIL 30. 1997 i
i NAME OFFICE NAME OFFICE A. Chaffee NRR K. West NRR D. Skeen NRR J. Beall OCM-EM 4
R. Dennig NRR C. Rossi AE00 T. Martin NRR T. Ihltz OCM-SJ
)
M. Slosson NRR D. Thatcher NRR A. Pal NRR l
4 TELEPHONE ATTENDANCE (AT ROLL CALL)
Regions
.R_qE dent Insoectors i
Region I B. Korona Pilgrim Region III Region IV Misc.
J ATTACHMENT 1 1
?:
1 d
d r
4 i
OPERATING REACTORS EVENTS BRIEFING 97-03 LOCATION:
0-10B11, WHITE FLINT WEDNESDAY, APRIL 30, 1997 11:00 A.M.
i l
i PILGRIM, UNIT 1 MAIN TRANSFORMER FAULT RESULTS IN OIL SPILL l
INTO TURBINE BUILDING i
I s'
l PRESENTED BY:
EVENTS ASSESSMENT AND GENERIC COMMUNICATIONS BRANCH i
ATTACHMENT 2
i I
l' 97-03 PILGRIM, UNIT 1 MAIN TRANSFORMER FAULT RESULTS-IN OIL SPILL INTO TURBINE BUILDING MARCH 7, 1997
(
PROBLEM l
A FAULT IN THE MAIN TRANSFORMER PROVIDED A LEAKAGE PATH l
FOR SEVERAL THOUSAND GALLONS OF INSULATING OIL TO ENTER l
THE TURBINE BUILDING.
l i
CAUSE A FAULT IN THE TRANSFORMER RUPTURED A LOW-VOLTAGE BUSHING, PROVIDED A LEAKAGE PATH.
L SAFETY SIGNIFICANCE THE POTENTIAL FOR A SIGNIFICANT FIRE IN THE TURBINE BUILDING THAT COULD HAVE AFFECTED BOTH DIVISIONS OF SAFETY-RELATED SWITCHGEAR.
i
[
DISCUSSION e
ON MARCH 7, 1997, THE UNIT WAS 3 WEEKS INTO A REFUELING.
OUTAGE, USING THE MAIN TRANSFORMER TO BACKFEED 0FFSITE POWER INTO THE PLANT VIA THE UNIT AUXILIARY TRANSFORMER.
l
. CONTACT:
D. SKEEN, NRR/DRPM/PECB AIT: NO L
REFERENCE:
10 CFR 50.72 #31912 SIGEVENT: NO i
_l:
i.
PILGRIM, UNIT 1 97-03 l
e THE'STARTUP TRANSFORMER WAS OUT OF SERVICE FOR l
MAINTENANCE, AS WAS THE "A" EMERGENCY DIESEL GENERATOR (EDG).
e MAIN TRANSFORMER FAULT CAUSED BREAKERS IN THE 345 KV YARD TO TRIP TO CLEAR THE FAULT.
EDG "B" STARTED AND
[
LOADED THE A6 SAFETY BUS.
THE SHUTDOWN TRANSFORMER, SUPPLIED BY 23 KV 0FFSITE POWER, PICKED UP THE A5 SAFETY BUS.
EDG "A" WAS OUT OF SERVICE FOR MAINTENANCE.
e AUGMENTED FUEL POOL COOLING (AFPC) MODE OF RESIDUAL HEAT REMOVAL (RHR) WAS LOST WHEN BUS A6 SWAPPED OVER TO THE "B" EDG.
AFPC WAS RE-ESTABLISHED WITHIN 50 MINUTES.
POOL TEMPERATURE ROSE FROM 86 F TO 88 F.
e AN OPERATOR REPORTED OIL SPILLING INSIDE THE TURBINE BUILDING VIA THE ISO-PHASE BUS DUCT AIR COOLER WITHIN MINUTES OF THE TRANSFORMER FAULT.
e 4,300 GALLONS OF OIL SPILLED INTO THE TURBINE BUILDING, SPREADING OUT OVER 2,200 SQ FT ON THE GROUND FLOOR (23-FT ELEVATION), 500 SQ FT OF SWITCHGEAR ROOM "B" (1E SWITCHGEAR), AND 1,350 SQ FT OF THE TRUCKLOCK (LOADING / UNLOADING) AREA.
e THE OIL ALSO SPILLED DOWN A STAIRWELL INTO THE LOWER LEVEL OF THE TURBINE BUILDING, COVERING ABOUT 3,000 SQ FT.
i.
l PILGRIM, UNIT 1 97-03 l
l e
EQUIPMENT IN THE AREAS OF THE OIL SPILL INCLUDED:
L l
MAIN GENERATOR HYDROGEN SEAL OIL UNIT, STATOR COOLING l
WATER UNIT, MAIN GENERATOR HYDROGEN GAS PIPING, MAIN l
GENERATOR METERING AND RELAYING INSTRUMENTATION, ISO-L PHASE BUS DUCT AIR COOLING UNIT, MAIN CONDENSER l
SCAVENGING SYSTEM PUMPS AND VACUUM TANK, MAIN TRANSFORMER DELUGE HEADER AND VALVES, AND MAIN l
GENERATOR FIRE PROTECTION CARBON DIOXIDE TANK..
l 4-KV SWITCHGEAR ROOM "B",
WHICH HOUSES SAFETY-RE. LATED l
"B" TRAIN EQUIPMENT (BUS A6), AND NON-SAFETY RELATED EQUIPMENT SUCH AS THE MAIN TRANSFORMER AND MAIN l
GENERATOR AUXILIARIES.
i L
NON-SAFETY RELATED RADWASTE MONITOR TANKS AND PUMPS, I
HOLD-UP TANKS, INSTRUMENT AND SERVICE AIR COMPRESSORS, i
AND TURBINE BUILDING FLOOR DRAINS AND SUMPS.
i e
SIX-HOURS INTO THE EVENT, A LOW ENGINE WATER TEMPERATURE ALARM WAS RECEIVED FOR THE STATION BLACK j
OUT DIESEL GENERATOR (SB0DG).
LICENSEE MANAGEMENT l
DECIDED TO MONITOR THE TEMPERATURE AND START THE SB0DG IF THE TEMPERATURE DECREASED TO 60 F.
e TWENTY MINUTES LATER, AN ATTEMPT TO START THE SBODG FAILED, AND A LOW ENGINE OIL PRESSURE ALARM WAS RECEIVED.
PILGRIM, UNIT 1 97-03 i
FOLLOWUP e
THE' ROOT CAUSE OF THE TRANSFORMER FAULT IS UNKNOWN.
e LICENSEE CORRECTIVE ACTIONS INCLUDE:
I INSTALLATION OF BERMS AROUND THE SWITCHGEAR ROOM l
D0 ORS AND THE STAIRWELL TO CONTAIN POTENTIAL OIL l
SPILLS.
l INSTALLATION OF A DRAIN LINE IN THE BOTTOM 0F THE ISO-PHASE DUCT JUNCTION B0X ON THE MAIN l
TRANSFORMER.
THE DRAIN LINE WILL INCLUDE A RUPTURE l
DISC SET FOR 2 PSIG 0F STATIC OIL PRESSURE.
PROCEDURES TO MONITOR SB0DG PARAMETERS S0 THAT THE i
SB0DG CAN BE STARTED BEFORE PARAMETERS DEGRADE TO j
THE POINT OF CAUSING A FAILURE.
l e-NRC - PLANT SYSTEMS BRANCH, ELECTRICAL ENGINEERING BRANCH, AND THE EVENTS ASSESSMENT AND GENERIC COMMUNICATIONS BRANCH ARE DEVELOPING AN INFORMATION NOTICE TO ALERT LICENSEES THAT A TRANSFORMER FAULT CAN RESULT IN A MAJOR OIL SPILL THAT COULD CAUSE A SIGNIFICANT FIRE.
e NRC INFORMATION NOTICE (IN) 97-21 WAS ISSUED TO ALERT LICENSEES OF THE POTENTIAL UNAVAILABILITY OF SB0DGs DURING A SB0 EVENT.
THE IN CITED THE PILGRIM EVENT AND A CONDITION AT MILLSTONE 3 AS EXAMPLES.
Briefing 97-04 Pilgrim, Unit 1 Figure 1
- IO BOS10N L Dison Synit y to BOS10N Ebl50N uyst r u
& N E GRID 345KV 345KV
/
(
zuiKv" h
/:
-O1-016 k
o i
ll5KV
- 1
-O
- -O-<
O 3 tSKV4 -
X -0 7 WEST WAtlulE
- .01 0-G.I ii3xy io 3 iskV SWilcilY^tili 23OKV w COMMONWLAI Ill ll yg Ft ECTRIC SYSTLM STATION AUXILIAHY BUSES alSKV
- A ll5Kv
& N E GillD
~%,
g al5KV*
h h
h h
U d
UN'I h SHUTDOWN STAR 10P WLSI MLOWAY MANOMEr AUX THANSF AUX TRANSF AUX IltANSI 345KV SWIICilYAllD SUBSTAllON 345/416KV ww 345/416KV 315/416KV mm ww wwww wwww NC /
23KV NG O < ' O-345*V
" ^ ' "
Bill!XiLWATER h
. O/ N[KV MAIN 345KV SWilCliYAllD * -,- -
345KV V
C'OLUAIUN
^
- q:
-g.
4Rau4@
~* ll5KV TO JOflDAN RD 1 AP I
A COMMOMWE Al_Ill EL ECTillC SYS TL M g AUBt!RN ST Pli GillM STAllON SWITCHYAIID llOL OROOK
}
l
?
O- < - El--
9 a
-w CANAL WW CANAL.
STAllON ST AIlON 115KV 10 UNil 2 mm UNil :
MON TAUP ELECilllC g
115KV 115KV IO COMMONWEAllit I'll GilitG SYSTEM STATION TRANSMISSION SYSTEM ONE LINE DIAGRAM PILGRIM NUCLEAR POWER PLANT
Briefing 97-04 Pilgrim, Unit 1 i
Figure 2 f
To
/
H i sa -Vow ^"
maw Basmass GE9E AAT*o n.
Il
\\
[
Low - V.i.rA cs Bosmeas 7-Sax
,/
i s o - PH ASE B us.D o c.r
/
MAIN T RAMS FORAE R g+
Doc _r air CoonEA
/
mvor q ruaamt B'a //
A6tavER E L-2. 3 f,
Pilgrim - Iso-Phase Bus Duct and Main Transformer Configuration
REACTOR SCRAM i
Reporting Period: 04/21/97 to 04/27/97 6
YTD YTD I
A80VE SELOW YTD 9111 PLANT 2 UNIT EGE,R ILP[
M COMPLICATfONS jj}
jll J_0IA(
Q 04/21/97 FT CALHOUN 1 100 SM Equipment Failure No 1
0 1
04/22/97 HATCH 2 55 SA Equipment Failure No 1
0 1
04/23/97 TURKET POINT 4 100 SA Maintenance Error No 1
0 1
04/24/97 VERMONT YANKEE 1 100 SA Operating Error No 1
0 1
04/24/97 BROWNS FERRY 2 100 SA ' Maintenance Error NO 1
0 1
04/26/97 supeIER 1 6
SA Equipment Failure NO O
1 1
+
l i
1 i
l I.
N:t*: Tear To Date *YTD) Totals include Events Within The Calendar Year Indica *W by The End Date Of The Specified Reporting Period ETS 10 p.g.:g 05/01/97 ATTACHMENT 3
- ~~
.~.
o.
s COMPARISON OF KEKLY SCRAM STATISTICS WITH INDUSTk' AVERAGES k
PERIOD ENDING 04/27/97 NUMBER 1997 1996 1995 1994 1993 Of WEEKLY WEEKLY WEEKLY WEEKLY
-WEEKLY f
4 SCRM CAUSE SLRAMS AVERAGE AVERAGE AVERAGE AVERAGE AVERAGE (TTD)
POWER GREATER THAN OR EQUAL TO 15%
i EQUIPMENT FAILURE 2
0.72 1.52 1.83 1.52 1.83 DESIGN /INSTALLATlod ERROR 0
0.24 0.10 0.12 0.08 0.04 OPERATING ERkOR 1
0.12 0.08 0.15 0.21 0.27 MAINTENA EE ERROR 2
0.30 0.50 U 38 0.54 0.52 EXTEREAL 0
0.06 0.13 0.21 0.17 0.13 OTHER 0
0.06 0.10 0.06 0.02 e
SubtoteL 5
1.50 2.43 2.75 2.52 2.81 t
POWER LESS THAN 15%
EQUIPMENT FAILURE 1
0.18 0.23 0.10 0.27 0.38 0.02 DEslGN/ INSTALLATION ERROR 0
0.00 OPERATING ERROR 0
0.00 0.10 0.13 0.08 0.13 0.02
(
MAINTENANCE ERROR 0
0.06 0.06 0.08 0.04 EXTERNAL 0
0.00 OTHER 0
0.00
$dar 1
0.24 0.39 0.31 0.37 0.57 l
TOTAL 6
1.74 2.82 3.06 2.89 3.38 l
1997 1996 1995 1994 1993 No. OF WEEKLY WEEKLY
' WEEKLY WEEKLY WEEKLY j
SCRAM TYP.
SCRAMS AVERAGE AVERAGE AVERAGE AVERAGE AVERAGE (YTD)
TOTAL AUTOMATIC SCRANs 5
1.14 1.71 1.92 2.19 2.44 l
TOTAL MANUAL SCRANS 1
0.60 1.10 1.13 0.69 0.94 8
l TOTALS MAY OltFER BECAUSE OF ROUNDING OFF ETS-14 Page: 1 05/01/97
~.
, NOTES 1.
PLANT SPECIFIC DATA BASED ON INITIAL REVIEW OF 50.72 REPORTS FOR THE WEEK OF INTEREST.
PERIOD IS MIDNIGHT SUNDAY THCOUGH MIDNIGHT SUNDAY.
SCRAMS ARE DEFINED AS REACTOR PROTECTIVE ACTUATIONS WHICH RESULT IN ROD MOTICM, AND EXCLUDE PLANNED TESTS OR SCRAMS AS PART OF PLANNED SHUTDOWN IN ACCORDANCE WITH A PLANT PROCEDURE.
THERE ARE 111 REACTORS HOLDING AN OPERATING LICENSE.
2.
PERSONNEL RELATED PROBLEMS INCLUDE HUMAN ERROR, PROCEDURAL DEFICIENCIES, AND MANUAL STEAM GENERATOR LEVEL CONTROL PROBLEMS.
3.
COMPLICATIONS: RECOVERY COMPLICATED BY EQUIPMENT FAILURES OR PERSONNEL ERRORS UNRELATED TO CAUSE OF SCRAM.
4.
"OTHER" INCLUDES AUTOMATIC SCRAMS ATTRIBUTED TO ENVIRONMENTAL CAUSES (LIGHTNING), SYSTEM DESIGN, OR UNKNOWN CAUSE.
OEAB SCRAM DATA Manual and Automatic Scrams for 1987 ------------------ 435 Mnnunl and Automatic Scrams for 1988 ------------------ 291 Manu21 and Automatic Scrams for 1989 ------------------ 252 M2nual and Automatic Scrams for 19 9 0 -------- - --------- 2 2 6 Manual and Automatic Scrams for 1991 ------------------ 206 Mtnual and Automatic Scrams for 1992 ------------------ 212 Minunl and Automatic Scrams for 1993 ------------------ 175 Mnnunl and Automatic Scrams for 1994 ------------------ 150 M2nunl and Automatic Scrams for 1995 ------------------ 159 Manunl and Automatic Scrams for 1996 ------------------ 146 Menual and Automatic Scrams for 1997 --(YTD 04/27/97)-- 29
i l
REACTOR SCRAM 04/14/97 to 04/20/97 i
Reporting Period:
2 i
1 YTD YTD j
ABOVE BELOW YTD EAl[
PLANT & UNIT POWER TLP(
CAUSE COMPLICATIONS
,13 1 TOTAL j 04/20/97 WATTS 8AR 1 100 SA Equipment Failure No 3 0 3 i 9 ) i t hits: Year To Date (YTD) Totals Incinde Events within The Calendar Year Indicated By The End Date of The specified Reporting Period ETS-10 Page:1 04/24/97 )
.. - =. l 1 J a t COMPARISON OF WEEKLY SCRAM STATISTICS WITH INDUSTRY AVERAGES i PERIOD ENDING 04/20/97 NUMBER 1997 1996 1995 1994 1993 3 0F WEEKLY WEEKLY WEEKLY WEEKLY WEEKLY j SCRAM CAUSE SCRAMS AVERAGE AVERAGE AVERAGE AVERAGE AVERAGE J 1 (YTD) POW R GREATER YHAN OR EQUAL TO 1$% l EQUIPMENT FAILURE 1 0.64 1.52 1.83 1.52 1.83 DESIGN / INSTALLATION ERROR 0 0.25 0.10 0.12 0.08 0.04 f OPERATING ERROR 0 0.06 0.08 0.15 0.21 0,27 i MAINTENANCE ERROR 0 0.19 0.50 0.38 0.54 0.52 ) EXTERNAL 0 0.06 0.13 0.21 0.17 0.13 0.02 l 4 OTHER 0 0.06 0.10 0.06 I Subtotal 1 1.26 2.43 2.75 2.52 2.8' l i POWER LESS THAN 15% EQUIPMENT FAILURE O 0.13 0.23 0.10 0.27 0.38 i DESIGN / INSTALLATION ERROR C 0.00 0.02 OPERATING ERROR 0 0.00 0.10 0.13 0.08 0.13 0.02 MAINTENANCE ERROR 0 0.06 0.06 0.08 EXTERNAL 0 0.00 0.04 i OTHER 0 0.00 a Subtotal 0 0.19 0.39 0.31 0.37 0.57 i l TOTAL 1 1.45 2.82 3.06 2.89 3.38 5 1-i 1997 1996 1995 1994 1993 3 No. OF WEEKLY WEEKLY WEEKLY WEEKLY WEEKLY i SCRAM TYPE SCRAMS AVERAGE AVERAGE AVERAGE AVERAGE AVERAGE (YTD) t TCTAL AUTOMATIC SCRAMS 1 0.89 1.71 1.92 2.19 2.44 l TOTAL MANLML SCRAMS 0 0.57 1.10 1.13 0.69 0.94 TOTALS MAY DIFFER SECAUSL OF ROUNDING OFF l [ EVS-15 Page: 1 04/24/9/
e o j REACTDR SCRAM l ( Reporting Period: 03/24/97 to 03/30/97 1 1 YTD YTD ABOVE SELOW YTD i EllE PLANT 4 UNIT POWER llPg CAUSE COMPLICAiloWS 113 lil TOTAL j 03/26/97 SOUTH TEXAS 2 100 $M Equipment Failure No 2 0 2 03/27/97 WASHINGTON NUCLEAR 2 97 SM Equipment failure NO 1 0 1 03/29/97 DIAsto CANYON 2 100 SA Maintenance Error No 1 0 1 l i l i Note Year To Date (YTD) Totals include Events Within The Calendar Year Indicated By The End Date Of The Specified Reporting Period ~~ ETS 10 Page:1 04/C 7/97
_._..___.__-._,_o._ _m._.-. m. l 4 a i e COMPARISON OF WEEKLY SCRAN STATISTICS WITH INDUSTRY AVERACES ' PERIOD ENDING 03/30/97 i NUMBER 1997 1996-1995 1994 1993 0F WEEKLY WEEKLY WEEKLY WEEKLY WEEKLY $ GRAM _ aaf SCRAMS AVERACE AVERACE AVERACE AVERACE AVERACE-(YTC) POWER GREATER THAN OR EDUAL TO 15% l l. EQUIPMENT FAILLME 2-0.71 1.52 1.83 1.52 1.83 l l DESIGN / INSTALLATION ERROR 0 0.31 0.10 0.12 0.08 _0.04 OPERATING ERROR ~ 0 0.08 0.08 0.15 0.21 0.27 ( MAINTENANCE ERROR 1 0.24 0.50 0.38 0.54 0.52 EXTERNAL 0 0.08 0.13 0.21 0.17 0.13 [ I OTHER 0 0.08 0.10 0.06 0.02 Subtotal 3 1.50 2.43
- 2. 75 2.52 2.81 i
i l 1 POWER LESS THAN 15% l EQUIPMENT fN! LURE O 0.16 0.23 0.10 0.27 0 38 l [ . DESIGN /INSTALLAfl0N ERROR 0 0.00 0.02 l DPERATING ERROR 0 0.00 0.10 0.13 0.08 0.13 MAINTENANCE ERROR 0 0.08 0.06 0.08 0.02 EXTERNAL 0 0.00 0.04 OTHER 0 0.00 i Subtotal 0 0.24 0.39 0.31 0.37 0.57 TOTAL 3 1.74 2.82 3.06 2.89 3.38 I 1997 1996 1995 1994 1993 No. OF WEEKLY WEEKLY WEEKLY WEEKLY WEEKLY SCR AM TYPE SCRAMS AVER AGE, - AVERAGE AVERAGE AVERAGE AVERACE (YTD) TOTAL AutoMAfic SCRAMS 1 1.02 1.71 1.92 2.19 2.44 TOTAL MANUAL STEADS 2 0.71 1.10 1.13 0.69 0.94 i i TOTALS MAY DIFFER BECAUSE OF ROUNDING OFF l l en i i i i 1 J j i ETS 14 Page: 1 04/07/97 ? i i 1 i e 1
/ a REACTOR SCRAM Repdrting Period: 03/17/97 to 03/23/97 YTD YTD ABOVE BELOW YTD 0,All PLANT & UNIT M M CAUSE COMPLICATIONS 15% 15% TOTAL 03/19/97 BEAVER VALLEY 1 100 SA Design or Installati No 1 0 1 03/19/97 BEAVER VALLEY 2 100 SA Design or Installati NO 2 0 2 03/19/9/ SOUTH TEXAS 2 100 SA Equipment Falture No 1 0 1 03/20/97 OCONEE 3 73 Sa Equipment Failure NO 1 0 1 Note Year To Date (TTD) Totals include Events Within The Calender Year Indicated By The End Cate Of The Specified Reporting Period ETS-10 Page:1 04/07/97
..m. __ _ ~ _.. lr 4 -' g s i 5 COMPAR!$0W OF WEEKLY SCRAM STATISTICS WITH INDUSTRY 3 /ERAGES PERIOD 7N0!NG ) 03/23/97 a. i NUMBER 1997 1996 1995 1994 1993 j Cf WEEKLY WEEKLY WEEKLY WEEKLY WEEKLY SCRAM CAUSE SCRAMS AVERAGE AVERAGE AVERAGE AVERAGE AVERAGE J (YTC) POWER GREATER THAN OR EQUAL TO 15% EQUIPMENT FAILURE 2 0.60 1.52 1.83 1.52 1.83 DESIGN / INSTALLATION ERROR 2 0.34 0.10 0.12 0.08 0.04 OPERATING ERROR 0 0.09 0.08 0.15 0.21 0.27 MAINTENANCE ERROR 0 0.17 0.50 0.38 0.54 0.52 EXTERNAL 0 0.09 0.13 0.21 0.17 0.13 OTHER 0 0.09 0.10 0.06. 0.02 Subtotal 4 1.38 2.43 2.75 2.52 2.81 POWER LESS THAN 15% EQUIPMENT FAILURE 0 0.17 J.23 0.10 0.2, 0.38 0.02 OESIGN/ INSTALLATION ERROR 0. 0.00 OPERATING ERROR 0 0.00 0.10 0.13 0.08 0.13 MAINTENANCE ERROR 0 0.09 a.06 0.08 0.02 EXTERNAL G 0.00 0.04 OTHER 0 0.00 Subtotal 0 0.26 0.39 0.31 0.37 0.57 TOTAL 4 1.64 2.82 3.06 2.89 3.35 1997 1996 1995 1994 1993 NO. OF WEEKLY WEEKLY WEEKLY WEEKLY WEEKLY SCRAM YYPE SCRAMS AVERAGE AVERAGE AVERAGE AVERAGE AVERAGE (YTO) TOTAL AUTOMATIC SCRAMS 4 1.02
- 1,71 1.92 2.19 2.44 TOTAL MANUAL SCRAPS 0
0.60 1.10 '. 13 0.69 0.94 TOTALS MAY O!FFER SECAUSE OF ROUNDING OFF ETS-14 Page 1 04/07/97
/ l l l e REACTOR SCRAM Reporting Period: 03/10/97 tn 03/16/97 I l YTD YTD ABOVE BELOW YTD 0,All P1Af g UWlf POWER M QAUSg COMPLICATIONS ljt3 1}.} TOTAL 03/11/97 COOK 2 100 SA Design or Instattati No 1 0 t x Note: Year to Date (viD) Totals Include Events Within the Calendar Year Indicated By The End Date of Tho Specified Reporting Period ETs 10 Page:1 03/21/97
..a_ ..m-m._.._. ._m._.. .b j.g.* i COMPARISON 0F WEEKLY SCRAM STATISTICS WITH INDUSTRY AVERAGES j y f l PERIOD ENDING j 03/16/97 i f NUMBER 1997 1996 1995 1994 1993 i' 0F WEEKLV WEEKLY WEEKLY WEEKLY WEEKLY' SCRAM CAUSE SCRANS 'AVERACE AVERAGE AVERAGE AVERAGE AVERAGE (YTO) POWER OREATER THAN OR EQUAL TO 15$ } EQUIPMlNT FAILURE O 0.47 1.52 1.83 1.52 1.83 + 8 DESIGN /INSTALLAfl0N ERROR 1 0.19 0.10 0.12 0.08 0.04-OPERATlWO ERROR 0 0.09 0.08 0.15 0.21 0.27 j MAINTENANCE ERROR 0 0.19 0.50 0.38 0.54 0.52-J ) EXTERNAL 0 0.09 0.13 0.21 0.17 0.13 l 'O.02 ) OTHER 0 0.09 0.10 0.06 + . Subtotal 1 1.12 2.43 2.75 2.52 2.81 1 l l f 6 l, POWER LESS THAN 1$% I i l EQUIPMENT FAILURE O 0.19 0.23 0.10 0.27 0.38 i j DE$ltN/INSTALLAT! J ERROR 0 0.00 0.02 l. OPERATING ERROR 0 0.00 0,10 0.13 0.08 0.13 l. MAINTENANCE ERROR 0. 0.09 0.06 .0.08 0.02 j. EXTERNAL 0 0.00 0.04 OTHER 0 0.00 Subtotat 0 0.28 0.39 0.31 0.37 0.57 1; TOTAL 1 1.40 2.62 3.06 2.89 3.38 4 3 I i 1997 1996 1995 .1994 1993 ) NO. OF WEEKLY WEEKLY WEEKLY WEEKLY WEl!KLY '1 SCRAM Tyre SCRAMS AVERAGE AVERAGE AVERAGE AVERAGE AVERAGE I (YTD) i' 1 3 TOTAL AUTOMATIC SCRAMS 1 0.75 1.71 1.92 2.19 2.44 i i TOTAL MANUAL SCRAMS 0 0.65 1.10 1.13 0.69 0.94 - TOTALS MY DIFFER BECAUSE OF ROUNDING OFF 'I ETS 14 Pa9et 1 03/21/97 i a}}