Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138F058 + (ML20138F058)
- ML20138F061 + (ML20138F061)
- ML20138F063 + (ML20138F063)
- L-96-017, TER on Third 10-Yr Interval ISI Program Plan:Boston Edison Co,Pilgrim Nuclear Power Station + (ML20138F066)
- ML20138F067 + (ML20138F067)
- ML20138F070 + (ML20138F070)
- PY-CEI-NRR-0368, Documents Commitment to Provide Rept Describing Methods Used to Establish Setpoints & Allowable Values for Reactor Protection Sys & ESF Trip Functions Assumed to Operate in FSAR Chapters 6 & 15 Analysis Per 840723 & 1009 Ltrs + (ML20138F072)
- ML20138F075 + (ML20138F075)
- ML20138F078 + (ML20138F078)
- ML20138F081 + (ML20138F081)
- ML20138F082 + (ML20138F082)
- ML20138F085 + (ML20138F085)
- 05000247/LER-1985-013, :on 851004,leakage Into Containment from All Sources Exceeded Tech Spec Limit of 10 Gpm for Combined Leakage.Source of Leakage Traced to Tube in Fan Cooler Unit Water Box.Tubing Replaced + (ML20138F086)
- ML20138F088 + (ML20138F088)
- ML20138F090 + (ML20138F090)
- ML20138F092 + (ML20138F092)
- ML20138F093 + (ML20138F093)
- ML20138F094 + (ML20138F094)
- ML20138F097 + (ML20138F097)
- ML20138F098 + (ML20138F098)
- ML20138F100 + (ML20138F100)
- ML20138F103 + (ML20138F103)
- ML20138F105 + (ML20138F105)
- 05000395/LER-1985-027, :on 850920,reactor Tripped Due to Loss of Main Feedwater Pumps During Testing of Condensate Sys.Caused by Improper Valve Lineup.Personnel Instructed & Training Program Developed + (ML20138F106)
- IR 05000802/2009016 + (ML20138F110)
- ML20138F111 + (ML20138F111)
- ML20138F117 + (ML20138F117)
- ML20138F119 + (ML20138F119)
- 05000368/LER-1985-019, :on 850913,main Steam Isolation Sys Actuated on Low Steam Generator Pressure During Plant Cooldown.Caused by Personnel Error.Sys Restored to Preactuation Condition. Personnel Counseled + (ML20138F123)
- ML20138F125 + (ML20138F125)
- ML20138F129 + (ML20138F129)
- IR 05000289/1985021 + (ML20138F134)
- ML20138F137 + (ML20138F137)
- IR 05000528/1985001 + (ML20138F143)
- ML20138F145 + (ML20138F145)
- ML20138F148 + (ML20138F148)
- ML20138F149 + (ML20138F149)
- ML20138F154 + (ML20138F154)
- ML20138F157 + (ML20138F157)
- ML20138F158 + (ML20138F158)
- ML20138F159 + (ML20138F159)
- ML20138F160 + (ML20138F160)
- 05000325/LER-1985-051, :on 850921,reactor Power Intermediate Range Monitor Trip Occurred Resulting in Automatic Trip of Reactor Protection Sys Logic Channels a & B.Caused by Bump to LPRM Signal Cable.Trip Signal Reset + (ML20138F161)
- ML20138F163 + (ML20138F163)
- ML20138F165 + (ML20138F165)
- ML20138F166 + (ML20138F166)
- ML20138F169 + (ML20138F169)
- ML20138F171 + (ML20138F171)
- ML20138F174 + (ML20138F174)
- ML20138F175 + (ML20138F175)
- ML20138F176 + (ML20138F176)