t UNITED STATES g
g NUCLEAR REGULATORY COMMISSION o
2 WASHINGTON. D.C. 20066-0001
%4 * * * * *,&
July 3,1996 SD-3'3f M1 Mr. Thomas F. Plunkett President, Nuclear Division Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420
SUBJECT:
SPENT FUEL SURVEY COMMITMENTS FOR ST. LUCIE PLANT, UNITS 1 AND 2
Dear Mr. Plunkett:
On March 26 and 27, 1996, Mr. Jan Norris, then NRR Project Manager for St. Lucie, visited the St. 1.ucie Plant site to conduct a survey on the spent fuel practices and spent fuel pool (SFP) cooling system design and current licensing basis for St. Lucie, Units 1 and 2.
During the survey, in discussions with your staff at the plant site, it is our understanding that the following commitments were made:
1.
FP&L will have a procedure in place prior to the St. Lucie 1 outage which will require that SFP temperature be maintained below 150 degrees F.
The procedure was to be modeled after the St. Lucie Unit 2 procedure OP-1600023, Rev. 58, page 26 of 69.
2.
FP&L will perform a new set of calculations for the design heat load in the Unit 1 SFP for the normal offload conditions. The new calculations are necessary because the St. Lucie staff was unable to produce a copy of the original calculations.
3.
FP&L will develop and implement, prior to the Unit 1 outage, a procedure which will assure that SFP boron concentration is maintained at a minimum'of 1720 ppm.
Accordingly, I am requesting that you provide a letter within 30 days of receipt of this letter that confirms these commitments and indicates the projected or actual completion dates for each of these actions.
These commitments will then be included in future inspection reports and will be tracked by the regional office until completion.
0 3a3M M W8
[
Q o lf 0 0 lr D L
C00031
-l l
Mr. Thomas F. Plunkett If you have any questions concerning these items, please contact me on i
301-415-1495.
Sincerely, Original signed by Leonard A. Wiens, Senior Project Manager Project Directorate II-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation Docket No. 50-335 and 50-389 cc:
See next page DISTRIBJ"10N Rdg.
S. Varga J. Zwolinski OGC ACRS J. Stolz J. Shea C. Polusny E. Merschoff DOCUMENT NAME:
G:\\STLUCIE\\SLLTR.SFP To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy m
l(E Mil-3/PN,
l[3 P0ll-3/D
,I l C-l 0FFICE PDII 3/LA NAME SClayton A/L "
LWiens f74t**#
FMebdon M
- d93 07/ 7 /96 DATE 07/ N 96 ~
07/
f OFFICIAL RECORD COPY
L..,
iQ t
i l
Mr. T. F. Plunkett St. Lucie Plant Florida Power and Light Company a
cc:
Jack Shreve, Public Counsel Regional Administrator, Office of the Public Counsel Region II I
c/o The Florida Legislature U.S. Nuclear Regulatory Commission i
111 West Madison Avenue, Room 812 101 Marietta Street, N.W. Suite 2900 Tallahassee, Florida 32399-1400 Atlanta, Georgia 30323 i
Senior Resident Inspector H. N. Paduano, Manager St. Lucie Plant Licensing & Special Programs 3
i U.S. Nuclear Regulatory Commission Florida Power and Light Company
}
7585 S. Hwy A1A P.O. Box 14000 Jensen Beach, Florida 34957 Juno Beach, Florida 33408-0420 Joe Myers, Director J. A. Stall, Site Vice President i
Division of Emergency Preparedness St. Lucie Nuclear Plant
{
Department of Community Affairs P. O. Box 128 2740 Centerview Drive Ft. Pierce, Florida 34954-0128 i
Tallahassee, Florida 32399-2100
)
i J. Scarola i
J. R. Newman Plant General Manager Morgan, Lewis & Bockius St. Lucie Nuclear Plant 1800 M Street, N.W.
P.O. Box 128 Washington, DC 20036 Ft. Pierce, Florida 34954-0128 j
John T. Butler, Esquire Mr. Kerry Landis Steel, Hector and Davis U.S. Nuclear Regulatory Commission 4000 Southeast Financial Center 101 Marietta Street, N.W. Suite 2900 Miami, Florida 33131-2398 Atlanta, Georgia 30323-0199 Mr. Thomas R.L. Kindred E. J. Wefekam County Administrator Licensing ;4anager St. Lucie County St. Lucie Nuclear Plant 2300 Virginia Avenue P.O. Box 128 Fort Pierce, Florida 34982 Fort Pierce, Florida 34954-0128 Mr. Charles Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 i
)