Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138B649 + (ML20138B649)
- ML20138B651 + (ML20138B651)
- ML20138B652 + (ML20138B652)
- 05000245/LER-1997-015, Forwards LER 97-015-00,documenting Event at Plant on 970321 & Licensee Commitments + (ML20138B653)
- ML20138B654 + (ML20138B654)
- ML20138B656 + (ML20138B656)
- ML20138B657 + (ML20138B657)
- ML20138B658 + (ML20138B658)
- ML20138B660 + (ML20138B660)
- ML20138B661 + (ML20138B661)
- 05000255/LER-1985-018, :on 850914,calibr Check Determined Seven Pressurizer Pressure Transmitters Outside Required Range. Caused by Personnel Miscommunication of Dead Weight Pressures.Correlation Techniques Reviewed + (ML20138B662)
- ML20138B663 + (ML20138B663)
- ML20138B666 + (ML20138B666)
- ML20138B667 + (ML20138B667)
- ML20138B669 + (ML20138B669)
- ML20138B671 + (ML20138B671)
- ML20138B673 + (ML20138B673)
- IR 05000346/1985039 + (ML20138B674)
- ML20138B675 + (ML20138B675)
- ML20138B676 + (ML20138B676)
- HL-5372, Responds to NRC Re Violations Noted in Insp Repts 50-321/97-01 & 50-366/97-01.Corrective Actions:Rev to Procedures 34GO-OPS-065-1S & 34GO-OPS-065-2S Were Initiated & Weapon Discovered Returned to Secure Location + (ML20138B678)
- ML20138B680 + (ML20138B680)
- ML20138B681 + (ML20138B681)
- ML20138B682 + (ML20138B682)
- ML20138B685 + (ML20138B685)
- ML20138B687 + (ML20138B687)
- ML20138B688 + (ML20138B688)
- ML20138B689 + (ML20138B689)
- ML20138B690 + (ML20138B690)
- ML20138B691 + (ML20138B691)
- ML20138B692 + (ML20138B692)
- ML20138B693 + (ML20138B693)
- ML20138B695 + (ML20138B695)
- ML20138B696 + (ML20138B696)
- IR 05000282/1985019 + (ML20138B698)
- ML20138B699 + (ML20138B699)
- ML20138B700 + (ML20138B700)
- ML20138B701 + (ML20138B701)
- 05000366/LER-1997-002-02, :on 970325,grounded Jumper Caused Blown Fuse & Engineered Safety Features Actuations.Replaced Blown Fuse & Policies Contributing to Event Will Be Reviewed by 970601 + (ML20138B704)
- 05000366/LER-1997-003-02, :on 970328,excessive Leakage Identified on Secondary Bypass Valves Was Caused by Undersized Valve Operators & Inappropriate Valve & Operator Orientation. Re-routed Piping Containing Valves + (ML20138B705)
- ML20138B706 + (ML20138B706)
- U-602728, Responds to NRC Ltrs Re Violations Noted in Insp Rept 50-461/96-15.Corrective Actions:Se Documenting That Manual Operation of Component Cooling Water Expansion Tank Was Not an Unreviewed Safety Question Was Approved on 961124 + (ML20138B709)
- ML20138B711 + (ML20138B711)
- B16401, Forwards non-proprietary & Proprietary Versions of Results of Initial Review of Licensed Operator Training Records,Per CAL 1-97-10.Proprietary Version Withheld Per 10CFR2.790 + (ML20138B712)
- ML20138B713 + (ML20138B713)
- IR 05000440/1985058 + (ML20138B715)
- ML20138B716 + (ML20138B716)
- ML20138B718 + (ML20138B718)
- 05000322/LER-1985-043, :on 850917,full Reactor Trip Occurred Due to Low Level Signal.Caused by Hydraulic Oscillation When Instrument Test Equipment Valved In.Procedures to Be Revised + (ML20138B719)
- ML20138B720 + (ML20138B720)
- ML20138B721 + (ML20138B721)