Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137P839 + (ML20137P839)
- ML20137P843 + (ML20137P843)
- ML20137P844 + (ML20137P844)
- ML20137P847 + (ML20137P847)
- ML20137P849 + (ML20137P849)
- ML20137P850 + (ML20137P850)
- RBG-22709, Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (ML20137P852)
- ML20137P855 + (ML20137P855)
- ML20137P856 + (ML20137P856)
- ML20137P861 + (ML20137P861)
- ML20137P864 + (ML20137P864)
- ML20137P866 + (ML20137P866)
- ML20137P868 + (ML20137P868)
- ML20137P871 + (ML20137P871)
- ML20137P872 + (ML20137P872)
- ML20137P873 + (ML20137P873)
- ML20137P874 + (ML20137P874)
- ML20137P875 + (ML20137P875)
- ML20137P877 + (ML20137P877)
- ML20137P878 + (ML20137P878)
- ML20137P880 + (ML20137P880)
- ML20137P881 + (ML20137P881)
- ML20137P883 + (ML20137P883)
- ML20137P891 + (ML20137P891)
- NSD-NRC-97-5054, Confirms Completion of Submittal of Final Documentation Re Ssar,Chapter 13,Conduct of Operation,For Application for AP600 Design Certification + (ML20137P915)
- ML20137P917 + (ML20137P917)
- ML20137P919 + (ML20137P919)
- ML20137P922 + (ML20137P922)
- ML20137P924 + (ML20137P924)
- ML20137P926 + (ML20137P926)
- ML20137P927 + (ML20137P927)
- ML20137P929 + (ML20137P929)
- ML20137P931 + (ML20137P931)
- ML20137P932 + (ML20137P932)
- ML20137P933 + (ML20137P933)
- ML20137P938 + (ML20137P938)
- ML20137P941 + (ML20137P941)
- ML20137P943 + (ML20137P943)
- ML20137P945 + (ML20137P945)
- ML20137P946 + (ML20137P946)
- ML20137P948 + (ML20137P948)
- NSD-NRC-97-5052, Confirms Completion of Submittal of Final Documentation Re Ssar,Chapter 8,Electrical Power,For Application for AP600 Design Certification + (ML20137P952)
- ML20137P953 + (ML20137P953)
- TXX-9702, Responds to NRC Re Violations Noted in Insp Repts 50-445/96-16 & 50-446/96-16.Corrective actions:re-emphasized Supervisory Responsibilities & Self Verification Techniques & Replaced or Tightened Fuse Clips + (ML20137P955)
- ML20137P956 + (ML20137P956)
- ML20137P960 + (ML20137P960)
- ML20137P962 + (ML20137P962)
- ML20137P963 + (ML20137P963)
- 05000413/LER-1985-072, :on 851226,hourly Firewatch for Diesel Generator Room 1B & Auxiliary Feedwater Pump Room Posted 21 & 2 Minutes Late,Respectively.Caused by Malfunctioning Computer Sys Multiplexer.Procedures Written + (ML20137P964)
- 05000325/LER-1985-068, :on 851230,2 H Time Frame for Surveillance Testing of Reactor Level Instrument B21-LT-N024A-1 Exceeded & Instrument Not Placed in Tripped Condition.Caused by Technician Error.Technicians Counseled + (ML20137P968)
- ML20137P970 + (ML20137P970)