Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137H434 + (ML20137H434)
- ML20137H436 + (ML20137H436)
- B11789, Forwards Justification for Interim Operation of Hydrogen Analyzer in Hydrogen Monitoring Sys,Per Request. All Equipment W/Exception of Hydrogen Analyzer within Scope of 10CFR50.49 & Fully Qualified + (ML20137H438)
- ML20137H440 + (ML20137H440)
- ML20137H443 + (ML20137H443)
- DCL-97-045, Pacific Gas & Electric Co 1996 Annual Rept + (ML20137H446)
- ML20137H447 + (ML20137H447)
- 3F1185-23, Responds to 850826 Request for Addl Info Re IE Bulletin 80-11 Re Masonry Wall Design.Justification for Fixed Boundary Conditions Along Horizontal Edges in Walls 1,2 & 3 Unnecessary + (ML20137H448)
- SNRC-1218, Requests Meeting W/Appropriate Personnel to Discuss Util Request for Addl Info Re Accumulated OL Review Fees + (ML20137H450)
- ML20137H451 + (ML20137H451)
- ML20137H452 + (ML20137H452)
- ML20137H454 + (ML20137H454)
- ML20137H456 + (ML20137H456)
- NRC-97-0025, Submits Property Insurance Coverage Detailed Under Reporting Requirements of 10CFR50.54(w) + (ML20137H457)
- ML20137H458 + (ML20137H458)
- ML20137H461 + (ML20137H461)
- ML20137H464 + (ML20137H464)
- ML20137H465 + (ML20137H465)
- B16347, Submits Property Insurance Coverage,For Haddam Neck Plant & Millstone Nuclear Power Station,Units 1,2 & 3 + (ML20137H466)
- ML20137H467 + (ML20137H467)
- ML20137H468 + (ML20137H468)
- ML20137H469 + (ML20137H469)
- ML20137H470 + (ML20137H470)
- ML20137H473 + (ML20137H473)
- ML20137H474 + (ML20137H474)
- ML20137H476 + (ML20137H476)
- 05000245/LER-1997-018, Forwards LER 97-018-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970224.Util Commitments Made within Ltr,Listed + (ML20137H477)
- ML20137H479 + (ML20137H479)
- ML20137H481 + (ML20137H481)
- ML20137H482 + (ML20137H482)
- ML20137H485 + (ML20137H485)
- ML20137H486 + (ML20137H486)
- ML20137H487 + (ML20137H487)
- LIC-97-0049, Application for Amend to License DPR-40,incorporating Addl Restrictions on Operation of MSSVs + (ML20137H489)
- 05000346/LER-1983-027-03, /03X-1:on 830428,valve RC240B Declared Inoperable. Caused by Inadequate Maint Procedures & Lack of Proper Training.Torque Switch Set to E-15 Settings & Valve Stem Cleaned & RC240B Returned to Svc + (ML20137H490)
- IR 05000255/1985024 + (ML20137H492)
- ML20137H493 + (ML20137H493)
- ML20137H494 + (ML20137H494)
- ML20137H499 + (ML20137H499)
- 05000267/LER-1985-028, :on 851214,air Flow Through Fuel Storage Facility Did Not Meet Tech Spec Surveillance Requirements. Caused by Air Leaks in Pipe Chase Walls Connected to Reactor Bldg Ventilation Sys.Leaks Repaired + (ML20137H500)
- ML20137H501 + (ML20137H501)
- ML20137H504 + (ML20137H504)
- ML20137H505 + (ML20137H505)
- IR 05000456/1985049 + (ML20137H506)
- ML20137H508 + (ML20137H508)
- 05000245/LER-1997-018-01, :on 970224,four MOVs May Not Fully Isolate Downstream Pipe Break.Caused by Lack of Adequate Design Change Process Guidance & Limited Vendor & Industry Documentation Availability.Mov Program Will Be Revised + (ML20137H509)
- ML20137H513 + (ML20137H513)
- ML20137H514 + (ML20137H514)
- ML20137H516 + (ML20137H516)
- ML20137H518 + (ML20137H518)
- ML20137H519 + (ML20137H519)