Forwards Rev 2 to Application for Amend to License DPR-16, Consisting of Tech Spec Change Request 100 Re Inservice Insp Surveillance Requirements for Snubbers,In Response to Insp Rept 50-219/85-27.Fee Paid
ML20137H513
Person / Time
Site: Oyster Creek
Issue date: 11/13/1985
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20137H518 List:
References
NUDOCS 8512020409
Download: ML20137H513 (2)


Text

'

A GPU Nuclear Corporation Nuclear  :=== 388 Forked River, New Jersey 08731-o388 609 971-4000 Writer's Direct Dial Number:

November 13, 1985 Direc'or, Nuclear Reactor Regulation U.S. nuclear Regulatory Comission Washington, DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Technical Specification Change Request No.100 Rev. 2 On December 10, 1982, in accordance with 10CFR50.59 and 10CFR50.90, GPU Nuclear Corporation, operator of the Oyster Creek Nuclear Generating Station, Provisional Operating License DPR-16, submitted Technical Specification Change Request No. 100. This Technical Specification Change Request was submitted to address changes in the Inservice Inspection Surveillance Requirements for snubbers.

On April 15, 1985, GPU Nuclear submitted Revision No.1 to Technical Specification Change Request 100 in response to Generic Letter 84-13, which was applicable to all SEP plants. Revision No. I also addressed required changes to the snubber Technical Specifications.

During IE Inspection 85-27, GPU Nuclear and the NRC Inspector performed a comparision tatween Technical Specification Change Request 100, Rev. I and the Standard Technical Specifications. As a result of that effort, this Revision No. 2 to Technical Specification Change Request 100 is hereby submitted.

In view of the time lapsed since our December 10, 1982 submittal and this revision, the interim changes requested have been deleted from this submittal. Instead, only those differences between the existing Technical Specifications and this submittal will be addressed.

This Revision No. 2 supercedes both our original submittal and our proposed Revision No.1, and has been reviewed in accordance with Section 6.5 of the Oyster Creek Nuclear Generating Station Technical Specifications.

Pursuant to 10CFR50.91(b)(1), a copy of Revision No. 2 to Technical Specification Change Request No.100 has been sent to the State of New Jersey Department of Environmental Protection.

1 p&\p J/

20 h00 \ i P

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

' Director Nucle:r Reactor Regulation U.S. Nu. clear R:gulatory Commission Page 2 In accordance with 10CFR170.21, Revision of License Fee Schedule, effective on June 18,1984, we have enclosed a check for $150.00 pursuant to the schedule of Facility Fees. A check for $4,000.00 has already been provided for Technical Specification Change Request No.100, and a check for $150.00 has been provided for Revision No. 1.

Very truly yours, ete . Fiedler Vice President and Director Dyster Creek PBF:JJR: dam Encs.

0087A 3

cc: Dr. Thomas E. Murley, Administrator Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Mr. Jack N. Donohew, Jr.

U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue, Phillips Bldg.

Bethesda, MD 20014 Mail Stop No. 314 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731