Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137C954 + (ML20137C954)
- ML20137C956 + (ML20137C956)
- 05000312/LER-1984-016, :on 840425,RCS Pump Seal Return Line Isolation Valve Exceeded Tech Spec Stroke Time Limit.Caused by Weaknesses in Documentation & Surveillances of Equipment. Valve Restroked.Surveillance Procedure Revised + (ML20137C957)
- ML20137C959 + (ML20137C959)
- ML20137C960 + (ML20137C960)
- ML20137C961 + (ML20137C961)
- NPL-97-0090, Responds to GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs + (ML20137C963)
- ML20137C966 + (ML20137C966)
- ML20137C967 + (ML20137C967)
- ML20137C971 + (ML20137C971)
- ML20137C974 + (ML20137C974)
- ML20137C975 + (ML20137C975)
- IA-85-450, Responds to FOIA Request for Mailing List for IE Info Notices Issued by Div of Emergency Preparedness & Engineering Response.Mailing Labels Encl.Labels W/ Individual Names Deleted,Per 850716 Telcon.W/O Encls + (ML20137C975)
- ML20137C978 + (ML20137C978)
- 05000281/LER-1985-011-02, :on 851023,emergency Diesel Generator (EDG) Automatically Started.Caused by Inadequate Design Change Test Procedure.Control of EDG 2 Transferred to Main Control Room Panel & Diesel Shut Down + (ML20137C982)
- ML20137C983 + (ML20137C983)
- ML20137C984 + (ML20137C984)
- ML20137C987 + (ML20137C987)
- B16327, Monthly Operating Rept for Feb 1997 for Millstone Nuclear Power Station Unit 3 + (ML20137C990)
- ML20137C992 + (ML20137C992)
- NPL-97-0104, Forwards Documentation for Review to Support Restart Issues Identified on Unit 2 Startup Commitment List + (ML20137C994)
- 05000316/LER-1985-041-01, :on 851211,at 81% Reactor Thermal Power,High Alarm Received on Upper Containment Normal Range Area Monitor,Train B After Instrument Failed Low.Investigation Into Cause Continuing + (ML20137C998)
- ML20137D005 + (ML20137D005)
- ML20137D006 + (ML20137D006)
- ML20137D011 + (ML20137D011)
- ML20137D013 + (ML20137D013)
- ML20137D014 + (ML20137D014)
- ML20137D018 + (ML20137D018)
- ML20137D021 + (ML20137D021)
- ML20137D026 + (ML20137D026)
- 05000323/LER-1985-009-01, :on 851022,generator & Reactor Trip Occurred. Caused by Technician Inadvertently Actuating Current Test Block of Main Generator Differential Relay.Technician Counseled & Instructions Installed on Panel + (ML20137D027)
- ML20137D032 + (ML20137D032)
- ML20137D035 + (ML20137D035)
- ML20137D038 + (ML20137D038)
- ML20137D039 + (ML20137D039)
- ML20137D042 + (ML20137D042)
- ML20137D046 + (ML20137D046)
- IA-85-474, Listing of Financial Assistance Awards (Grants) - FY84 + (ML20137D046)
- ML20137D047 + (ML20137D047)
- ML20137D049 + (ML20137D049)
- ML20137D051 + (ML20137D051)
- 05000409/LER-1985-017, :on 851022 Reactor Scrammed Due to High Flux. Caused by Loss of Load Due to Maint on Tie Line Breaker 2NB11 & Loss of Offsite Power.Power Supply to Breaker Compressor Changed + (ML20137D053)
- ML20137D054 + (ML20137D054)
- ML20137D059 + (ML20137D059)
- ML20137D067 + (ML20137D067)
- ML20137D069 + (ML20137D069)
- ML20137D072 + (ML20137D072)
- ML20137D075 + (ML20137D075)
- 05000333/LER-1985-026, :on 851031,breaker Operation on Output Line Caused Turbine Generator Load Unbalance Resulting in Reactor Scram.Caused by motor-operated Disconnect at 345 Kv Substation.Plant Performed Per Design + (ML20137D076)
- ML20137D078 + (ML20137D078)
- ML20137D079 + (ML20137D079)