Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000322/1985021 + (ML20137B738)
- ML20137B739 + (ML20137B739)
- 05000325/LER-1985-065, :on 851211,autostarting of Control Bldg Emergency Air Filtration Sys Train 2A Occurred.Caused by Spurious Actuation of Fire Detector Due to Air Flow from Exhaust of Vacuum Cleaner + (ML20137B741)
- 05000295/LER-1985-047-03, :on 851208,during Startup from Outage for Turbine Repairs,Reactor Power Changed by Greater than 15% in 1 H.Caused by Misunderstanding Between Radiation Protection & Operating Personnel.No Procedure Revs Made + (ML20137B743)
- B11642, Forwards Reviews of Integrated Safety Assessment Program Topics 2.04,2.08,2.11,2.12 & 2.22,in Response to NRC 850731 Request.Topics Include Stud Tensioners & CRD Sys Water Hammer + (ML20137B747)
- ML20137B748 + (ML20137B748)
- ML20137B750 + (ML20137B750)
- 05000305/LER-1985-023, :on 851212,loss of Power to Instrument Bus I Occurred.Caused by Failure of Constant Voltage Transformer. Constant Voltage Transformer Replaced & Instrument Bus Returned to Normal Power Supply + (ML20137B752)
- ML20137B754 + (ML20137B754)
- ML20137B757 + (ML20137B757)
- ML20137B759 + (ML20137B759)
- ML20137B761 + (ML20137B761)
- ML20137B762 + (ML20137B762)
- ML20137B763 + (ML20137B763)
- ML20137B764 + (ML20137B764)
- ML20137B768 + (ML20137B768)
- ML20137B769 + (ML20137B769)
- ML20137B771 + (ML20137B771)
- ML20137B775 + (ML20137B775)
- ML20137B776 + (ML20137B776)
- ML20137B778 + (ML20137B778)
- ML20137B779 + (ML20137B779)
- ML20137B780 + (ML20137B780)
- ML20137B782 + (ML20137B782)
- ML20137B783 + (ML20137B783)
- ML20137B784 + (ML20137B784)
- ML20137B785 + (ML20137B785)
- ML20137B789 + (ML20137B789)
- ML20137B792 + (ML20137B792)
- PNO-I-85-059, on 850815,unplanned 2% Power Excursion Occurred for 3-5 While Increasing Power to Permit Operational Testing of HPCI Sys.Power Ascension Program Testing Suspended Until Problem Resolved + (ML20137B794)
- ML20137B797 + (ML20137B797)
- ML20137B798 + (ML20137B798)
- B11654, Responds to 850731 Request for Addl Info Re C-E Reactor Vessel Level Monitoring Sys.Recommendations for Mods to Emergency Operating Procedures Accounting for Differences Between C-E & Westinghouse Sys Developed + (ML20137B798)
- ML20137B799 + (ML20137B799)
- ML20137B801 + (ML20137B801)
- ML20137B804 + (ML20137B804)
- ML20137B808 + (ML20137B808)
- ML20137B809 + (ML20137B809)
- ML20137B811 + (ML20137B811)
- ML20137B812 + (ML20137B812)
- IR 05000338/1985023 + (ML20137B814)
- ML20137B815 + (ML20137B815)
- ML20137B818 + (ML20137B818)
- ML20137B821 + (ML20137B821)
- ML20137B822 + (ML20137B822)
- ML20137B823 + (ML20137B823)
- ML20137B824 + (ML20137B824)
- AECM-86-0008, Submits Evaluation of Test Results of Interplant Communication Sys for NRC Review within 90 Days of Completion.Sys Inadequate in Fire Water Pumphouse & Divs I-III Diesel Generator Bldgs.Design Change Request Issued + (ML20137B825)
- ML20137B826 + (ML20137B826)
- ML20137B827 + (ML20137B827)
- NSD-NRC-97-5014, Forwards Draft Seismic Margin Analysis (PRA Chapter 55) & Responses to Requests for Addl Info.Nrc Expected to Review Draft PRA Chapter 55 & Responses Provided in Encl 2 Preparation for Meeting Between Westinghouse & NRC + (ML20137B828)