Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-1519, Final Deficiency Rept Re Auxiliary & Isolation Relay Panels Installed by Mercury Co Not Conforming to Project Design Criteria & FSAR Commitments.Initially Reported on 850726. Item Not Reportable Per 10CFR50.55(e) + (ML20137B718)
- 05000361/LER-1985-059, :on 851211,Toxic Gas Isolation Sys Train a Spuriously Actuated During Troubleshooting of Ammonia Analyzer After Analyzer Failed Low.Probably Caused by Loose Power Supply Fuse Holder + (ML20137B719)
- ML20137B720 + (ML20137B720)
- ML20137B721 + (ML20137B721)
- ML20137B722 + (ML20137B722)
- PY-CEI-NRR-0399, Forwards Addl Info Resolving Outstanding Meteorology & Effluent Treatment Branch Issues,Including NUREG-0737, Item II.F.1 Re Accident Monitoring Instrumentation & Rev 4 to Emergency Plan Implementing Instruction OM15B:EPI-B7b + (ML20137B724)
- ML20137B728 + (ML20137B728)
- ML20137B737 + (ML20137B737)
- IR 05000322/1985021 + (ML20137B738)
- ML20137B739 + (ML20137B739)
- 05000325/LER-1985-065, :on 851211,autostarting of Control Bldg Emergency Air Filtration Sys Train 2A Occurred.Caused by Spurious Actuation of Fire Detector Due to Air Flow from Exhaust of Vacuum Cleaner + (ML20137B741)
- 05000295/LER-1985-047-03, :on 851208,during Startup from Outage for Turbine Repairs,Reactor Power Changed by Greater than 15% in 1 H.Caused by Misunderstanding Between Radiation Protection & Operating Personnel.No Procedure Revs Made + (ML20137B743)
- B11642, Forwards Reviews of Integrated Safety Assessment Program Topics 2.04,2.08,2.11,2.12 & 2.22,in Response to NRC 850731 Request.Topics Include Stud Tensioners & CRD Sys Water Hammer + (ML20137B747)
- ML20137B748 + (ML20137B748)
- ML20137B750 + (ML20137B750)
- 05000305/LER-1985-023, :on 851212,loss of Power to Instrument Bus I Occurred.Caused by Failure of Constant Voltage Transformer. Constant Voltage Transformer Replaced & Instrument Bus Returned to Normal Power Supply + (ML20137B752)
- ML20137B754 + (ML20137B754)
- ML20137B757 + (ML20137B757)
- ML20137B759 + (ML20137B759)
- ML20137B761 + (ML20137B761)
- ML20137B762 + (ML20137B762)
- ML20137B763 + (ML20137B763)
- ML20137B764 + (ML20137B764)
- ML20137B768 + (ML20137B768)
- ML20137B769 + (ML20137B769)
- ML20137B771 + (ML20137B771)
- ML20137B775 + (ML20137B775)
- ML20137B776 + (ML20137B776)
- ML20137B778 + (ML20137B778)
- ML20137B779 + (ML20137B779)
- ML20137B780 + (ML20137B780)
- ML20137B782 + (ML20137B782)
- ML20137B783 + (ML20137B783)
- ML20137B784 + (ML20137B784)
- ML20137B785 + (ML20137B785)
- ML20137B789 + (ML20137B789)
- ML20137B792 + (ML20137B792)
- PNO-I-85-059, on 850815,unplanned 2% Power Excursion Occurred for 3-5 While Increasing Power to Permit Operational Testing of HPCI Sys.Power Ascension Program Testing Suspended Until Problem Resolved + (ML20137B794)
- ML20137B797 + (ML20137B797)
- ML20137B798 + (ML20137B798)
- B11654, Responds to 850731 Request for Addl Info Re C-E Reactor Vessel Level Monitoring Sys.Recommendations for Mods to Emergency Operating Procedures Accounting for Differences Between C-E & Westinghouse Sys Developed + (ML20137B798)
- ML20137B799 + (ML20137B799)
- ML20137B801 + (ML20137B801)
- ML20137B804 + (ML20137B804)
- ML20137B808 + (ML20137B808)
- ML20137B809 + (ML20137B809)
- ML20137B811 + (ML20137B811)
- ML20137B812 + (ML20137B812)
- IR 05000338/1985023 + (ML20137B814)
- ML20137B815 + (ML20137B815)
- ML20137B818 + (ML20137B818)