Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136H595 + (ML20136H595)
- ML20136H596 + (ML20136H596)
- ML20136H599 + (ML20136H599)
- ML20136H603 + (ML20136H603)
- ML20136H605 + (ML20136H605)
- ML20136H606 + (ML20136H606)
- IR 05000333/1985025 + (ML20136H607)
- ML20136H608 + (ML20136H608)
- ML20136H610 + (ML20136H610)
- ML20136H611 + (ML20136H611)
- ML20136H612 + (ML20136H612)
- ML20136H615 + (ML20136H615)
- ML20136H618 + (ML20136H618)
- ML20136H619 + (ML20136H619)
- ML20136H622 + (ML20136H622)
- ML20136H623 + (ML20136H623)
- ML20136H625 + (ML20136H625)
- ML20136H627 + (ML20136H627)
- ML20136H632 + (ML20136H632)
- ML20136H634 + (ML20136H634)
- ML20136H639 + (ML20136H639)
- ML20136H644 + (ML20136H644)
- ML20136H647 + (ML20136H647)
- ML20136H648 + (ML20136H648)
- ML20136H649 + (ML20136H649)
- ML20136H652 + (ML20136H652)
- ML20136H654 + (ML20136H654)
- ML20136H656 + (ML20136H656)
- ML20136H658 + (ML20136H658)
- 3F1185-20, Provides Revs to Commitments in Response to 850628 Generic Ltr 85-11 on NUREG-0612 Re Control of Heavy Loads. Installation of Rail Stops for Intake Gantry Crane Unnecessary + (ML20136H659)
- B11868, Responds to 851018 Request for Review of Tech Specs to Ensure Accurate Reflection of Fsar,Ser & Plant as-built Configuration.Ser Discrepancies Re ECCS Subsystems & ESFAS Instrumentation Encl + (ML20136H661)
- ML20136H662 + (ML20136H662)
- ML20136H664 + (ML20136H664)
- ML20136H666 + (ML20136H666)
- ML20136H670 + (ML20136H670)
- ML20136H671 + (ML20136H671)
- ML20136H675 + (ML20136H675)
- ML20136H676 + (ML20136H676)
- ML20136H679 + (ML20136H679)
- ML20136H681 + (ML20136H681)
- ML20136H682 + (ML20136H682)
- ML20136H684 + (ML20136H684)
- ML20136H685 + (ML20136H685)
- ML20136H690 + (ML20136H690)
- ML20136H692 + (ML20136H692)
- ML20136H693 + (ML20136H693)
- BECO-85-210, Application for Amend to License DPR-35,changing Tech Spec Surveillance Requirement for Scram Insertion Time to Require Only 10% of CRDs Be Tested on Rotating Basis at Least Once Per 120 Days of Operation.Fee Paid + (ML20136H694)
- ML20136H697 + (ML20136H697)
- ML20136H698 + (ML20136H698)
- ML20136H699 + (ML20136H699)
- ML20136H703 + (ML20136H703)