UNITED STATES NUCLEAR REGULATORY COMMISSION i
f wasamorow, p. c. mas
%,*s,.*/
GPU NUCLEAR CORPORATION AND JERSEY CENTRAL P0i!ER & LIGHT COMPANY OYSTER CREFV NUCLEAR GENERATING STATION AMENDMENT TO PROVISIONAL OPEP.ATING LICENSE Amendment No. 92 License No. DPR-16 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by GPU Nuclear Corporation and Jersey Central Power and Light Company (the licensees) dated July 22, 1985, complies with the standards and recuire-ments of the Atomic Energy Act of 1954, as amendec (the Act),
and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of tie Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be infetcal to the comon defense anc security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFP Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
0511250167 051119 DH ADOCK 0500 19
F-i
!t 2
2.
Accordingly, the licerse is amended by changes to the Technical l
Specifications as indicated in the attcchrert to this license amendment erd Paragraph 2.C.(2) of Provisional Operating License No. DPR-16 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.92, are hereby incorporated in the license. GPU Nuclear Corporation shell operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuarec.
FOR THE NUCLEAR REGULATORY COMMISSION DT,. ( D
(
(
/
John A. Zwolinski, Chief
(
Operating Reactors Branch PS Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: November 19,1985 l
ATTACHMENT TO LICEf!F APENPPENT N0. 92 PPOVIFIOP7,L OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-719 Revise Appendix A Technical Specifications by receving the pages identified below and inserting the enclosed pages. The revised pages are identified by t
the captioned amendment number and contain vertical lines indicating the area of chenre.
PEMOVE INSERT 6-la 6P l
n h.
Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perfom safety-related functions.
In the event that unforeseen problems require substa.'ntial amounts of overtime to be used or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed:
+
a.
An individual should not be pemitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight, excluding shift turnover time.
b.
An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in av 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in av seven day period, all excluding shift turnover time.
c.
A break of at least eight hours should be allowed between work periods, including shift turnover time.
d.
In a, b, and c above, the time required to complete shift turnover is to be counted as break time and is not to be counted as work time.
e.
Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.
Any deviation from the above guidelines shall be authorized by the Department Managers, or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation.