ML20136H690
| ML20136H690 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 01/06/1986 |
| From: | Norris J Office of Nuclear Reactor Regulation |
| To: | Varga S Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8601100442 | |
| Download: ML20136H690 (4) | |
Text
,
January 6, 1986 Docket Nos. 50-295 and 50-304 MEMORANDUM FOR:
Steven A. Varga, Director PWR Project Directorate #3 Division of PWR Licensing-A FROM:
Jan A. Norris, Senior Project Manager PWR Project Directorate #3 Division of PWR Licensing-A
SUBJECT:
FORTHCOMING MEETING WITH COMMONWEALTH EDISON COMPANY (CECO) REGARDING RELOAD METHODOLOGY FOR ZION 1 AND 2 DATE & TIME:
January 30, 1986 9:00 a.m. - 12:00 noon LOCATION:
Room P-114 Phillips Building Bethesda, Maryland PURPOSE:
To discuss CECO safety analysis program, present an overview of the proposed codes and benchmarking techniqu es, and discuss the scheduling of submittals.
The meeting is preparatory to CECO assuming the responsibility of performing the reload safety analyses for Zion Station.. CECO proposed agenda is enclosed.
PARTICIPANTS:
NRC:
R. Lobel, and J. Norris, et. al.
Ceco:
P. LeBlond, B. Palagi, W. Naughton, K. Ramsden, and F. Gunnison
/s/JNorris Jan A. Norris, Senior Project Manager PWR Project Directorate #3 Division of PWR Licensing-A PAD-3 8601100442 e60106
~
JN)rris;ps PDR ADOCK 05000295 P
PDR 1/
/86 4
l l
l
Mr. D. L. Farrar Commonwealth Edison Company Zion Station CC:
Robert J. Vollen, Esquire Mr. Michael C. Parker, Chief 109 North Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Floor Director of Research and Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Mr. Phillip P. Steptoe Isham, Lincoln and Beale Counselors at Law Three First National Plaza 51st Floor Chicago, Illinois 60602 Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive, 5th Floor Springfield, Illinois 62704 U.S. Nuclear regulatory Commission Resident Inspe: tors Office 105 Shiloh Blvd.
Zion, Illinois 60099 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
u ENCLOSURE SUGGESTED AGENDA FOR MIC/ CECO EETING ON CECO SAFETY ANALYSIS PROGRAM I.
INTRODUCTION AND OVERVIEW (CECO)
A.
Objectives of Program B.
Overview of approach C.
Program Schedule II, SYSTEMS TRANSIENT ANLYSIS (CECO)
A.
Methooology and Codes Used B.
Benchmarking of RETRAN C.
Training III. CORE THERfML-HYORAULICS ANALYSIS (CECO)
A.
Methodology and Codes Used B.
Benchmarking of VIPRE C.
Training IV.
PIN THERMODYNAMIC ANALYSIS (CECO)
A.
Methodology and Codes Used B.
Benchmarking of FRAP C.
Training-
-V.
SUMMARY
/ CONCLUSION (CECO)
A.
Planneo Topical Reports B.
Proposed Licensing Scheoule V1.
CAUCUS (OPTIONAL)/NRC DISCUSSION (NRC).
0409K
O MEETING NOTICE DISTRIBUTION j
OPERATING REACTORS BRANCH NO. 1 DIVISION OF LICENSING i
_-Docket File / Central File CJUN L PDR' PADf3 Rdg ORAS H. Denton S. Varga J. Norris OELD E. L. Jordan B. Grimes Receptionist ACRS (10)
Resident Inspector Regional Administrator M. Schaaf C. Parrish NRC Participants R. Lobel