Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135F132 + (ML20135F132)
- DCL-85-282, Potential Part 21 Problem Re Pipe Clamps Mfg by Natl Valve & Mfg Co Reported to NRC on 850620 by Pacific Scientific Co. Facility Unaffected.No Class 1 Pipe Clamps Mfg by Natl Valve & Mfg Co Used + (ML20135F133)
- ML20135F134 + (ML20135F134)
- ML20135F135 + (ML20135F135)
- ML20135F136 + (ML20135F136)
- ML20135F137 + (ML20135F137)
- PY-CEI-NRR-0338, Informs That Simulated Loss of Ac Power Tests Poses Undue Risk of Damage to Plant Equipment Due to High Temp in Drywell,In Response to Generic Ltr 83-24.Test Will Not Be Conducted + (ML20135F138)
- ML20135F139 + (ML20135F139)
- ML20135F140 + (ML20135F140)
- ML20135F141 + (ML20135F141)
- ML20135F142 + (ML20135F142)
- ML20135F143 + (ML20135F143)
- ML20135F144 + (ML20135F144)
- ML20135F145 + (ML20135F145)
- ML20135F146 + (ML20135F146)
- ML20135F147 + (ML20135F147)
- ML20135F148 + (ML20135F148)
- ML20135F149 + (ML20135F149)
- ML20135F150 + (ML20135F150)
- ML20135F151 + (ML20135F151)
- ML20135F153 + (ML20135F153)
- ML20135F154 + (ML20135F154)
- ML20135F155 + (ML20135F155)
- ML20135F157 + (ML20135F157)
- ML20135F159 + (ML20135F159)
- ML20135F160 + (ML20135F160)
- ML20135F163 + (ML20135F163)
- ML20135F164 + (ML20135F164)
- PNO-V-85-057, on 850912,turbine & Reactor Trip Occurred. Caused by Fire in Main Turbine Exciter Encl.Fire Extinguished.All Reactor Shutdown Sys Operated Satisfactorily.Cause of Fire Being Investigated + (ML20135F165)
- ML20135F166 + (ML20135F166)
- RBG-22-002, Final Deficiency Rept DR-314 Re Leakage of Fluid Fyrguel from Pump Seals to Borg-Warner Pump Drive Motor Operators for Copes-Vulcan Valves.Initially Reported on 850718.Next Rept by 850916 + (ML20135F167)
- NPL-97-0073, Submits Documentation for NRC Review to Support Restart Issues as Identified on Unit 2 Startup Commitment List as Result from Discussions Conducted at 970131 NRC Wi Electric Senior Mgt Meeting + (ML20135F168)
- ML20135F169 + (ML20135F169)
- IR 05000369/1984024 + (ML20135F170)
- ML20135F171 + (ML20135F171)
- ML20135F172 + (ML20135F172)
- ML20135F173 + (ML20135F173)
- ML20135F174 + (ML20135F174)
- ML20135F175 + (ML20135F175)
- ML20135F176 + (ML20135F176)
- ML20135F177 + (ML20135F177)
- ML20135F178 + (ML20135F178)
- B11697, Provides Addl Response to SER Confirmatory Item 28 Re GDC 51, Fracture Prevention of Containment Pressure Boundary, Per 850821 Meeting.Fracture Mechanics Evaluation of Main Feedwater Sys Encl + (ML20135F179)
- ML20135F180 + (ML20135F180)
- ML20135F181 + (ML20135F181)
- ML20135F183 + (ML20135F183)
- ML20135F184 + (ML20135F184)
- ML20135F185 + (ML20135F185)
- A04910, Forwards Response to 850520 Request for Addl Info for Conformance W/Generic Ltr 83-28 Re Vendor Interface Programs,Tech Specs,Periodic Maint,Trending Programs & on-line Testing + (ML20135F186)
- ML20135F187 + (ML20135F187)
- IR 05000369/1985006 + (ML20135F188)