Responds to NRC Re Violations Noted in Insp Rept 50-412/85-14.Corrective Actions:Procedures Revised & Personnel Trained to Include Access Requirements Re Control of Fabrication & Installation Processes for Piping Sys
ML20135F173
Person / Time
Site: Beaver Valley
Issue date: 09/06/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-5-126, NUDOCS 8509170182
Download: ML20135F173 (3)


Text

.1bVL

'Af Duquesne Udit 2ts-g126, Nuclear Construction Dmaion Toisem N$uYP 'iS2 5 September 6, 1985 United States Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 ATTENTION:

Mr. Richard W. Starostecki Division of Project and Resident Prograns

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 USNRC IE Inspection Report No. 50-412/85-14

REFERENCE:

NRC Inspection 50-412/85-14, dated August 6, 1985 Gentlemen:

This is in response to the Notice of Violation cited in Inspection No. 50-412/85-14 and listed in Appendix A (Notice of Violation) attached to your letter to Mr. J. J. Carey, dated August 6,1985.

Notice of Violation 85-14-01:

" Insufficient Clearance Around Welds - PSI Related" Violation:

10CFR50, Appendix B, Criterion V, requires that activities affecting quality shall be prescribed by documented instructions, procedures...

and shall be accompli shed in accordance with these instructions, procedures, or drawings.

Specification 2BVS-920 requires that minimum longitudinal clear access equal to 4 Tn + 2 " be provided for welds which require surf ace or volumetric inservice inspection.

' Contrary to the above, during the period from June 24-28,1985, pipe support 2RCS-PSSP007X, reactor building elevation 783' 7-1/2", and pipe support 2RCS-PSR-036, reactor building elevation 783' 6" were found to obstruct 6" dianeter shop weld A, line 2RCS-006-107-1, and 3" diameter weld 2RCS-109-F500, respectively, such that the required longitudinal minimun clear access was not provided for the welds.

' Response:

At cited in this violation, minimum specified longitudinal access to the subject welds was not maintained when pipe supports 2RCS-PSSP-007X and 2RCS-PSR-036 were installed.

FCP-208, " Control of Fabrication and 8509170182 850906 PDR ADOCK 05000412 I

0 G

PDR

'g kt

United States Nuclear Regulatory Commission i

Mr. Richard W. Starostecki 1

USNRC IE Inspection Report No. 50-412/85-14 Page 2 Installation Processes for Piping Systens," identifies access require-ments and the need to obtain Engineering resolution when access could not be maintained.

A review of FCP-207, " Component Support Control,"

indicated that this FCP had not identified such requirements.

To strengthen OLC's progran, FCP-207 will be revised to include these requirenents/ procedures, and necessary training of personnel will be completed by September 30, 1985.

The FCP-207 revision, 2BVS-920 revision, and SQC Inspection Plans 7.2 and 7.3.1, which have already been revised to change inspection attributes for minimum clear access to welds, should prevent recurrence of any similar problem.

In addi-tion, the preservice inspection plan will include an appropriate attri bute to assure that the spatial envelope is acceptable for each weld requiring inspection prior to performing the initial PSI.

4 In regards to the related Unresolved Item 85-14-02, the project is evaluating existing procedures to determine what additional measures are required to ensure all discipline installation activities are completed without adversely affecting the weld accessibility envelope.

The results of this evaluation will be made available to the NRC Senior Resident Inspector upon request.

DUQUESNE LIGHT COMPANY By J. 'J.Marey Vice President SDH/wjs cc: Mr. J M. Taylor, Director (3)

Mr. B. K. Singh, Project Manager Mr. G. Walton, NRC Resident Inspector INPO Records Center NRC Document Control Desk SUBSCRIBEDANDSW0p4TOB ORE ME THIS (g/ DAY OF M/74

.L _, 1985.

_ U $ O $12 2L Notary Public ANITA ELAINE REITER, NOTARY PUBUC ROBINSON TOWNSHtP, ALLEGHENY COUNTY MY COMMISS!ON EXP!RES CCTOBER 20,1986 m%-i

--r i-rs

-T y-y_--y, c

,.i.r 9-w -y er9 7

---t-+t---y-

United States Nuclear Regulatory Commission Mr.* Richard W. Starostecki USNRC IE Inspection Report No. 50-412/85-14 Page 3 1,

COMMONWEALTH OF PENNSYLVANIA )

)

SS:

COUNTY OF ALLEGHENY

)

O i

On this

/

day of

// [ f, before me, a i

Notary Public in and for said Commonwealth and County, personally appeared 1

J. J. Carey, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statenents. set forth in the Submittal are true and correct to the best of his knowledge.

X f

__- Notary Public 1

i ANITA ELAINE REITER, NOTARY PUBUC j

ROBINSON TOWNSHIP, ALLEGHENY COUNTY t

MY CO.YMISSION EXP'RE3 COTOBER 20,1986 i

t i

i i

i I

a I

i t

t

. - - ~

- _,, -, _ -. - -.... ~. - _.

-