Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20135B081 + (ML20135B081)
- ML20135B084 + (ML20135B084)
- ML20135B085 + (ML20135B085)
- ML20135B087 + (ML20135B087)
- ML20135B088 + (ML20135B088)
- JAFP-97-0056, Monthly Operating Rept for Jan 1997 for Ja FitzPatrick Nuclear Power Plant + (ML20135B089)
- ML20135B090 + (ML20135B090)
- ML20135B092 + (ML20135B092)
- ML20135B094 + (ML20135B094)
- ML20135B095 + (ML20135B095)
- ML20135B098 + (ML20135B098)
- ML20135B099 + (ML20135B099)
- ML20135B101 + (ML20135B101)
- ML20135B102 + (ML20135B102)
- ML20135B103 + (ML20135B103)
- ML20135B104 + (ML20135B104)
- ML20135B105 + (ML20135B105)
- ML20135B106 + (ML20135B106)
- BSEP-97-0079, Informs That BSEP Will Not Have Any Individuals Participating in Generic Fundamentals Exam Section of Written Operator Licensing Exam to Be Administered on 970409 + (ML20135B107)
- ML20135B108 + (ML20135B108)
- ML20135B109 + (ML20135B109)
- IR 05000352/1996007 + (ML20135B111)
- 05000346/LER-1997-001, :on 970122,nuclear Instrumentation Declared Inoperable & Incapable of Performing Safety Functions.Caused by Small Shift in Degraded Bottom Linear Amplifier.Power Range Bottom Linear Amplifier Replaced + (ML20135B112)
- ML20135B113 + (ML20135B113)
- ML20135B114 + (ML20135B114)
- ML20135B115 + (ML20135B115)
- ML20135B117 + (ML20135B117)
- ML20135B118 + (ML20135B118)
- ML20135B119 + (ML20135B119)
- ML20135B120 + (ML20135B120)
- ML20135B121 + (ML20135B121)
- 05000333/LER-1997-002, :on 970124,shutdown Cooling Isolation Occurred. Caused by Pressure Transient.Placed Shutdown Cooling in Service After Resetting Isolation Logic & Refilling & Venting Sys + (ML20135B122)
- 2CAN119610, Application for Amend to License NPF-6,adding Suppl 1-P & Approval Ltr to Section 6.9.5.1 in Support of Increased SG Tube Plugging Limit Beyond 10% Ref to Small Break LOCA Methodology CENPD-137 + (ML20135B123)
- ML20135B124 + (ML20135B124)
- ML20135B126 + (ML20135B126)
- ML20135B127 + (ML20135B127)
- ML20135B128 + (ML20135B128)
- ML20135B129 + (ML20135B129)
- ML20135B130 + (ML20135B130)
- ML20135B132 + (ML20135B132)
- ML20135B133 + (ML20135B133)
- ML20135B134 + (ML20135B134)
- ML20135B135 + (ML20135B135)
- ML20135B136 + (ML20135B136)
- ML20135B137 + (ML20135B137)
- ML20135B138 + (ML20135B138)
- ML20135B140 + (ML20135B140)
- ML20135B141 + (ML20135B141)
- ML20135B142 + (ML20135B142)
- ML20135B143 + (ML20135B143)
- ML20135B144 + (ML20135B144)