39 iva m ow+an NUCLEAR PLANT OPERATING STATISTICS Browns Ferry Nuclear Plant
- Corrected
~
Period iinurs
_745 vanin October i., W.
Item No.
Unit No.
1?n i t 1 t'o f e 9 t ?" i t 1 Plut l
1 Averaqe Hourly Gross loJd. kW IJ.b.5.,28 7_
0 0
1,065,987 2
Maximuen Hour Net Generation. MWh 1.066' O
O I G66
_ 3 Core Thermal Energy Gen, GWO (t)2 4100.3711 0
0 q0g 17,11_
t 4
steam Geri. Thermal Energy Gen., GWO (112 c
5 Gross Electrical Gen., MWh 794,160 0
0 794.L160 2
6 station use, MWh 20,410 5 652 8,188 34,250 2
{
7 Net Electrical Gen.. MWh 773,750
-5 M 2_
-8,188 759,910 o
a station use. Percent 2.57 0
0 4.31 9
Accum. Core Avg. Cuposure. MWD / Ton!
15,818 0
0 15,818 10 CTEG This Month.106 BTU 8,221,327 0
0 8,221,327
~
6 11
$GTEG This Month,10 GTU l '?
13 Hours RcJctor WJs Critical 745 0
0 745 14 unit use Hours. Min.
7_45:00 0
0 7 t.5 : 00 15 Capacity Factor, Percent 97.0 0
0 32.3 16 Tureine Avail. Factor, Percent 100 0
- 19. S..__ 39 o
]
17 Generator Avail. Factor, Percent 100
- = _g.,. Turhoyn. Avail. Factor. Percent 100 0
19,9 39a _ _
0 19.8 Vs.9 t"-.J.uu2t ImnlJ.'acmfmm L.__ -
!.0 Q...
__._,.0,_____
19.8 Pl. 9 2
- o unit Asa,t. ractor. Percent 100 0
0 33.3 21 Turhir e startons 0
0 0
0 22 o actor Cntet 93rtuns 0
0 0
0 24 Grcss Heat nate. etu/kWh 10J50 0
0 10,350 5
25 Net Heat nat., ntu/kWh 10 d30 0
0 y
2G 10,820,
g,,
w 27 23 Throttle Preuure. psig 945 0
0 945 u
i 29 Thrnt_tla Temperature, F 538 0
0 535
.a 30 Enhausf Pressure. InHg Abs.
2.29 0
0 2.29 h
31 Intake Water Temo., *F 74.3 0
0 74.3 y
l 33 Main Feedwater. M lb/hr 12.9 0
0 I 2. 's li 34 l
35 3G 37 Felt Power Capacity. ErPO (1) 346 Gi)
.Ud _
33 Accum. Cycle Full Power Days. CFPO (3) 25 L _._. _ (4)
_ _..(/ j _
j 39 Oil Fireif for Generation. Gallons t
44,71,7,,
n
.o o.t heatina vatupJtlWfGA 4I._On.LG1:ne.tation MWh l 'e 0. T9_..
.' '). /c _
f.13 a. lio,:r Net Gen.
Man. Day Net Gen.
Load MWh l
Time Uste MWh Da te Factor, %
',,, ' ~ ~ ~
e 43 ina i 2400 10/1184.2s.sss 10 / 2 n / a 'i os.7 3
Remarkst !For 13FNP this value es MWD /STU and for SONP and WisNP this value is MWOi M T U.
C
'2(t) indicates Thermal Energy.
(3Lin formation furnished _ by Reactor Analys ts Group _- Chat tanooga
,[
F 1
(4) End-of-cycic 5 refuel outage 509100440 8507i6
~
~~
~ ~
~
DR
~~ ~ ~
ADOCK 05000259
'~ ' ' ~ ~ ~ ~ "
f g
PDR sa t. n.,,l,.,
zS. f fs-~
t,................-r
- ,,.. s..,,,.. -
1._ _._. j
12 0 Corrected OPERATING DATA REPORT DOCKET NO.
50-759 DATE 11 01 R4 C051PLETED BY T Thern
~
TELEPflONE (705) 729-3834 OPERATING STATUS Notes
- 1. Unit Name:
R m e 1:' q r nn a
- 2. Reporting Period: M nhor 1QR4
- 3. Licensed Thermal Power (SIWt):
3293
- 4. Nameplate Rating (Gross AlWe):
1152
- 5. Design Electrical Rating (Net atWe): 1065
- 6. Staximum Dependable Capacity (Gross AtWe):
1098.4
- 7. Stasimum Dependable Capacity (Net A!We):
1065
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasone N/A
- 9. Power Level To Which Restricted. If Any (Net 5tWe):
N/A
- 10. Reasons For Restrictions. If Any:
N/A w
h This Month Yr.to.Date Cumularise
- 11. Ifours in Reporting Period
_745 7.320 89.936
- 12. Number Of 11ours Reactor Was Critical
_745 6.603.48 56,409.6 y
- 13. Resetor Reserve Shutdown Ifours O
700 20 6.485.22
- 14. Hours Gc::erator On.Line
_745 6,458 95 55.176,53 _
- 15. Unit Reserve Shutdown llours 0
0
'O
-16. Gross Thermal Energy Generated (51Wif)
- ?,AnA 406
- 14 965. 8L
- 158.523.525_
- 17. Gross Electrical Energy Generated (5tWH) 794.16.D____.
6.575.690
_52.221.310
- 18. Net Electrical Energy Generated (51Wil) 773.750 6.401.898
_ 50.727,225
- 19. Unit Service Factor 100 88.2
__61.4
- 20. Unit Asailability Fictor 100 88.2 61.4
- 21. Unit Capacity Factor (Using SIDC Net) 97.5 82.1 53.0
- 22. Unit Capacity Factor (Using DER Net) 97.5 82.1 53.0
- 23. Unit Forced Outage Rate 0
11.4 22.5
- 24. Shutdowns Scheduled Oser Next 6 Stonths (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Regmrt Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
s Forecast Achiewd INITIA L CRITICA LITY INITIAL ELECTRICITY
- f COStalERCIAL OPERATION l
i 19/77)