ML20135B109

From kanterella
Jump to navigation Jump to search

Requests Addl Info Re Rev to Pressure Temp Limits in TS for Plant.Response Should Be Submitted within 30 Days of Ltr Date
ML20135B109
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/02/1996
From: Jabbour K
NRC (Affiliation Not Assigned)
To: Beckham J
GEORGIA POWER CO.
References
TAC-M96609, TAC-M96610, NUDOCS 9612040168
Download: ML20135B109 (4)


Text

. - -. - . - - .- - . - - - . ~ - ~ - . . - . _ _ - -

.a.

December 2, 1996 y.

Mr. J. T. Beckham, Jr.

8 Vice President - Plant Hatch i Georgia Power Company. ,

P. O. Box 1295 '

Birmingham, AL 35201 '

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVISION TO THE  !

PRESSURE TEMPERATURE LIMITS IN THE TECHNICAL SPECIFICATIONS - i FDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M96609 AND M95610)

Dear Mr. Beckham:

l By letter dated September 19, 1996, you proposed a revision to the pressure.  :

temperature limits in the. Technical Specifications for Edwin I. Hatch Nuclear Plant, Units 1 and 2. The~ NRC staff has reviewed your submittal and finds that your response to the enclosed request for additional information is l

{ needed before we can complete our review. '

L We request that you provide your response within'30 days from the date of this '

letter. Please contact me at (301) 415-1496.if you have any questions.

Sincerely, j i

.(original signed by)

Kahtan N. Jabbaur, Senior Project Manager Project Directorate II-2 Division of Reactor Projects - I/II  ;

Office of Nuclear Reactor Regulation  ;

Docket Nos. 50-321 and 50-366  !

Enclosure:

. As stated cc w/ encl: See next page Distribution:

! JDocketeFile' PD II-2 Rdg. KJabbour. KWickman PUBLIC SVarga 0GC .

CSheng JZwolinski ACRS BElliot PSkinner, RII HBerkow LBerry EMerschoff, RII CCasto, RII

] '

t

\

l 9612040168 961202 i PDR ADOCK 05000321 P PDR j j DOCUMENT NAME: G:\ HATCH \ HAT 96609.RAI q  ;

1 To rective a copy of this document, indicate in the box C=Co:yy w/o attacha$nt/pnclosure E= Copy with attachment / enclosure N = No copy 4

0FFICE PM:PD II-2 E LA:PD II-2d 'E' AEthCkB sv-D:PDYM7 i'. y j KJabbour:cn / LBerry \Mm NAME KFickman HBerk W

[ DATE. ll /Q96 //T/fh96 // /M/96 , 19/J/96 0FFICIALRECORBCOPYC b j

8 v3Effo

[  % UNITED STATES j

o j

f NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666-0001 k, . . . . . ,# December 2, 1996 Mr. J. T. Beckham, Jr.

Vice President - Plant Hatch Georgia Power Company P. O. Box 1295 Birmingham, AL 35201 l

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING THE REVISION TO THE PRESSURE TEMPERATURE LIMITS IN THE TECHNICAL SPECIFICATIONS - 1 EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M96609 AND '

M96610)

Dear Mr. Beckham:

l By letter dated September 19, 1996, you proposed a revision to the pressure temperature limits in the Technical Specifications for Edwin I. Hatch Nuclear l Plant, Units 1 and 2. The NRC staff has reviewed your submittal and finds that your response to the enclosed request for additional information is needed before we can complete our review.

We request that you provide your response within 30 days from the date of this letter. Please contact me at (301) 415-1496 if you have any questions.

Sincerely, a u.JAL~

Kahtan N. Jabbour, Senior Project Manager i Project Directorate II-2 i Division of Reactor Projects - I/II l Office of Nuclear Reactor Regulation 4

! l l Docket Nos. 50-321 and 50-366

Enclosure:

As stated l l

cc w/ encl: See next page

! l I

I J

i

1 Mr. J. T. Beckham, Jr.

Georgia Power Company Edwin I. Hatch Nuclear Plant I cc: Mr. Thomas P. Mozingo Mr. Ernest L. Blake, Jr. Program Manager Shaw, Pittman, Potts and Trowbridge Nuclear Operations l 2300 N Street, NW. Oglethorpe Power Corporation I Washington, DC 20037 2100 East Exchange Place P. O. Box 1349 Mr. D. M. Crowe Tucker, Georgia 30085-1349 Manager Licensing - Hatch Georgia Power Company Charles A. Patrizia, Esquire P. O. Box 1295 Paul, Hastings, Janofsky & Walker Birmingham, Alabama 35201 10th Floor 1299 Pennsylvania Avenue Mr. L. Sumner Washington, DC 20004-9500 General Manager, Nuclear Plant Georgia Power Company Mr. Jack D. Woodard i P. O. Box 439 Senior Vice President Baxley, Georgia 31513 Georgia Power Company P. O. Box 1295 j Resident Inspector Birmingham, Alabama 35201 I U.S. Nuclear Regulatory Commission 11030 Hatch Parkway North Chairman Baxley, Georgia 31513 Appling County Commissioners County Courthouse Regional Administrator, Region II Baxley, Georgia 31513 U.S. Nuclear Regulatory Commission 101 Marietta Street, NW. Suite 2900 Steven M. Jackson Atlanta, Georgia 30323 Senior Engineer - Power Supply Municipal Electric Authority Mr. Charles H. Badger of Georgia Office of Planning and Budget 1470 Riveredge Parkway, NW Room 610 Atlanta, Georgia 30328-4684 270 Washington Street, SW.

Atlanta, Georgia 30334 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 l

l j

m .

7 REODEST FOR ADDITIONAL INFORMATION GEORGIA POWER COMPANY. ET AL.

REQUEST TO AMEND THE PRESSURE / TEMPERATURE LIMITS IN TECHNICAL SPECIFICATIONS' DOCKET NOS. 50-321 AND 50-366

1. It appears that the revised statement of Surveillance Requirement (SR) 3.4.9.1(a) regarding Figures 3.4.9-1, Pressure / Temperature Limits for Inservice Hydrostatic and Inservice Leakage Tests, and 3.4.9-2, l Pressure / Temperature Limits for Non-Nuclear Heatup, Low Power Physics '

Tests, and Cooldown Following a Shutdown, is not consistent with the captions of those figures. Please correct this apparent discrepancy. j 1

2. Provide the generic P versus (T-RT ) curve and its methodology for the l uppervesselthatarementionedin,dENE-523-A137-1295, and the ratio of the worst stress around the feedwater nozzle to the membrane stress at places with no geometry discontinuity. Confirm that the generic P versus (T-RT ,7) curve for the bottom head that you are using is the same as that provided by Illinois Power in support of its recent pressure / temperature limits revision (dated February 22,1996) for the Clinton Power Station that has been reviewed by the staff. Otherwise, please provide similar information as requested for the upper vessel curve.

l

3. Provide the copper and nickel contents of the beltline limiting material for the Hatch Unit 2 vessel and confirm that all chemistry and material data used in generating the beltline P-T limit curves for Unit 2 are the same as those in your Generic letter 92-01 submittals.

i i

1 Mb 4