Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134N081 + (ML20134N081)
- 05000361/LER-1985-040, :on 850801,control Room Isolation Sys Train B Actuated Due to Spurious Alarm on Control Room Radiation Monitor.Cause Unknown.Investigative Maint Order Written to Check for Defective Components + (ML20134N082)
- 05000254/LER-1985-011-08, :on 850802 & 04,high RCIC Exhaust Pressure & RCIC Turbine Trip Alarms Annunciated.Caused by Water Dripping on Barksdale Pressure Switch.Switch Replaced & Hose Repositioned + (ML20134N084)
- ML20134N086 + (ML20134N086)
- 05000315/LER-1985-037, :on 850803 & 07,automatic ESF Actuations Occurred.Caused by Installation of Approved Design Change. No Corrective Actions Planned + (ML20134N087)
- 05000316/LER-1985-015-01, :on 850803,ESF Actuation Occurred.Caused by Level Deviation Due to Excessive Leakage Through Loop 4 Auxiliary Feedwater Valve.Loop 4 Removed from Svc & Will Be Repaired Prior to Startup + (ML20134N089)
- ML20134N090 + (ML20134N090)
- ST-HL-AE-1331, Final Deficiency Rept Re Four Missing Packages of Reactor Pressure Vessel Radiographs.Initially Reported on 850524. Review Program of Radiographic Testing Film Established Between Project & Westinghouse + (ML20134N091)
- ML20134N092 + (ML20134N092)
- 05000364/LER-1985-012-01, :on 850802,reactor Trip Occurred.Caused by Failure of Inverter 2B While Overtemp delta-T in Tripped Condition.Inverter Repaired + (ML20134N093)
- ML20134N094 + (ML20134N094)
- ML20134N095 + (ML20134N095)
- ML20134N096 + (ML20134N096)
- IR 05000263/1996010 + (ML20134N097)
- ML20134N098 + (ML20134N098)
- ML20134N099 + (ML20134N099)
- ML20134N100 + (ML20134N100)
- ML20134N102 + (ML20134N102)
- ML20134N103 + (ML20134N103)
- ML20134N105 + (ML20134N105)
- IR 05000269/1985023 + (ML20134N106)
- ML20134N107 + (ML20134N107)
- ML20134N108 + (ML20134N108)
- ML20134N109 + (ML20134N109)
- ML20134N110 + (ML20134N110)
- ML20134N111 + (ML20134N111)
- ML20134N112 + (ML20134N112)
- ML20134N113 + (ML20134N113)
- IR 05000416/1985031 + (ML20134N114)
- ML20134N116 + (ML20134N116)
- ML20134N117 + (ML20134N117)
- ML20134N119 + (ML20134N119)
- ML20134N120 + (ML20134N120)
- ML20134N121 + (ML20134N121)
- ML20134N122 + (ML20134N122)
- ML20134N123 + (ML20134N123)
- IR 05000708/2008004 + (ML20134N125)
- ML20134N126 + (ML20134N126)
- ML20134N127 + (ML20134N127)
- IR 05000334/1996099 + (ML20134N128)
- ML20134N129 + (ML20134N129)
- ML20134N130 + (ML20134N130)
- ML20134N131 + (ML20134N131)
- ML20134N132 + (ML20134N132)
- ML20134N133 + (ML20134N133)
- ML20134N134 + (ML20134N134)
- ML20134N135 + (ML20134N135)
- ML20134N136 + (ML20134N136)
- ML20134N137 + (ML20134N137)
- NG-96-2436, Provides Util 60 Day Response to GL 96-05, Periodic Verification of Design-Basis Capabilities of SR Movs + (ML20134N138)
- ML20134N139 + (ML20134N139)