ML20134N119

From kanterella
Jump to navigation Jump to search
Staff Requirements Memo on SECY-96-235 Re Petitions for Commission Review of Directors Decision on Certification of Gaseous Diffusion Plants W/Attachment
ML20134N119
Person / Time
Issue date: 11/22/1996
From: Hoyle J
NRC OFFICE OF THE SECRETARY (SECY)
To: Cyr K, Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO), NRC OFFICE OF THE GENERAL COUNSEL (OGC)
References
REF-10CFR9.7 M961122, SECY-96-235-R, NUDOCS 9611260171
Download: ML20134N119 (3)


Text

_. _.

m j

Q KE00

'o UNITED STATES

~'k NUCLEAR REGULATORY COMMISSION g

j WASHINGTON. D.C. 20555-0001 e

November 22, 1996 IN RESPONSE, PLEASE 43*****g REFER-TO:

M961122 OFFICE OF THE SECRETARY MEMORANDUM FOR:

James M. Taylor Executive Director for Operations Karen D.

Cyr Gene Coun el FROM:

Joh o

e S

ary

SUBJECT:

S F REQUIREMENTS - AFFIRMATION SESSION, 1:30 P.M.,

FRIDAY, NOVEMBER 22, 1996, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)

I SECY-96-235 - PetitioDs for Commission Review of Director's t

Decision on Certification of Gaseous Diffusion Plants The Commission approved a Memorandum and Order responding to petitions for review of the September 19, 1996 decision by the Director, Office of Nuclear Material Safety and Safeguards on the certification of gaseous diffusion plants at Paducah, Kentucky and at Piketon, Ohio.

The Memorandum and Order rejected one late filed petition, denied two requests for reconsideration of two previously rejected petitions, addressed the remaining contentions raised in the valid petitions, and-denied all remaining contentions in the petitions.

The proposed memorandum and order has been modified as noted in the attachment.

Commissioner Dicus did not participate in this matter.

(Subsequently, on November 22, 1996, the Secretary signed the Order.)

Attachment:

As stated

]))hIl)kb I

9611260171 961122 PDR 10CFR l

PT9.7 PDR g

@M-N2TD i

\\CC_&(1.

.. k cc:

Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan OGC OCAA OCA OIG Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)

PDR - Advance DCS - P1-24

k I

Changes to the Memorandum and Order proposed in SECY-96-235 Pace Chance 6

In line 5 (from the top), insert the word "and" befcre the word "from."

In footnote 5, replace the words "Donham/Hansen petition" with " petition filed by Mark Donham and Kristi Hanson."

7 In line 4 (from the top), insert the word "the" before the word " Coalition."

9 In the first line, replace "We therefore" with "Thus, we."

In the third line from the bottom,' replace

" limitation on" with " categories of."

10 In the third line from the bottom, delete the parenthetical phrase.

13 In the second full paragraph, move the last sentence (which begins with " Examples of specific topics...") to place it before the second sentence (which begins "on the basis of the...").

24 In the fifth line from the bottom, insert the words "they are" before the word " privatized."

31 After item 5., add the sentence " Commissioner Dicus did not participate in this matter."