ML20134N113
| ML20134N113 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 02/14/1997 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Subalusky W COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20134N116 | List: |
| References | |
| NUDOCS 9702210208 | |
| Download: ML20134N113 (2) | |
See also: IR 05000373/1996019
Text
- -
.
.
. . - -
. - .
. - - .
- - - - . - . - - .
,
_ - . - -
-_-
'
,
.
,
,
I
February 14, 1997
.'
!
4
Mr. W. T. Subalusky, Jr.
Site Vice President
4
i.aSalle County Station
1
)
Commonwealth Edison Company
l
2601 North 21st Road
Marseilles, IL 61341
,
j
SUBJECT:
NRC INSPECTION REPORT 50-373/374/96019(DRS) AND NOTICE OF
VIOLATION
Dear Mr. Subalusky:
On February 3,1997, the NRC completed an inspection at your LaSalle facility. The
enclosed report presents the results of that inspection. The inspection included a review
of the authorized activities for your LaSalle 2 Nuclear Power Station. The focus of this
inspection was the use of the Nuclear Design Information Transmittals (NDIT) procedure
and its LaSalle Appendix. Based on the results of this inspection, the NRC has determined
that two violations of NRC requirements occurred. These violations are cited in the
enclosed Notice of Violation (Notice) and the circumstances surrounding them are
4
described in detail in the enclosed inspection report.
,
The first violation is of concern because the engineering department, from late 1995 until
October 1996, used the NDIT process to facilitate minor modifications rather than the
i
process established by station procedures. The second violation is of concern because the
site appendix to the corporate NDIT procedure had not been reviewed and approved as
!
required by the station's technical specifications. This issue had been previously identified
by your site quality organization; however, our review of the resolution found that it did
not satisfy the plant's technical specifications.
You are required to respond to this letter and should follow the instructions specified in the
,
^
enclosed Notice when preparing your response. In addition, in your response to the first
violation, identify any other inappropriate uses of the NDIT, such as operability
,
evaluations. After reviewing your response to this Notice, including your proposed
corrective actions and the results of future inspections, the NRC will determine whether
'
.
7
' further NRC enforcement action is necessary to ensure compliance with NRC regulatory
'
f
requirements,
(())
i
!
.
/
3
9702210208 970214
ADOCK 05000373
0
i
.- _.
_-.
-
- _.
-
_ _ . -
- - - . -
-.
.-
. .
-
.
.
.
.
W. T. Subalusky, Jr.
-2-
February 14, 1997
-
i
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter,
its enclosure, and your response will be placed in the NRC Public Document Room.
)
Sincerely,
3
i
/s/ M. Icach (for)
i
i
Geoffrey E. Grant, Director
,
Division of Reactor Safety
,
,
i
Docket Nos. 50-373; 50-374
'
Enclosures:
4
2. Inspection Report 50-373/374/96019(DRS)
1
'
cc w/encis:
T. J. Maiman, Senior Vice President,
Nuclear Operations Division
4
]
D. A. Sager, Vice President,
Generation Support
-
H. W. Keiser, Chief Nuclear
'
,
Operating Officer
l
D. J. Ray, Station Manager
l
J. Burns, Regulatory Assurance
Supervisor
'
i. Johnson, Acting Nuclear
j
Regulatory Services Manager
j
Document Control Desk - Licensing
-
Richard Hubbard
Nathan Schloss, Economist,
j
Office of the Attorney General
i
State Liaison Officer
Chairman, Illinois Commerce Commission
4
]
Distribution:
j
Docket File w/enci
Rlli PRR w/enct
W. L. Axelson, Rlli w/enci
%C.'IE-01[wlerict
SRis, LaSalle, Dresden,
R. A. Capra, NRR w/enci
!
bC/LFDCB w/onci
Quad Cities w/enct
Enf. Coordinator, Rill w/enci
DRP w/enci
LPM, NRR w/ encl
CAA1 w/enci
DRS w/ encl
A. B. Beach, Rlll w/ encl
4
DOCUMENT NAME: G:\\LAS96019.DRS
To receive a copy of this docurnent, indicate in the box 'C' = Copy w/o attach /enci"E" = Copy w/ attach /enci"N" = No copy
,'
0FFICE
Rill:DRS
l
RIII:DRS
_l
Rlll:DRP
M
Rill:DRS
lW
NAME
Jones (A4
Kropp /4
Dapas #7/M
Leach / Grant e
DATE
02/f/ /97
02/ // '/97
02/ y /97
02/ /*- /97
0FFICIAL RECORD COPY
'
.