Forwards Insp Repts 50-373/96-19 & 50-374/97-19 on 961106-07,1204,970103 & 0203 & Forwards NOV
ML20134N113
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 02/14/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20134N116 List:
References
NUDOCS 9702210208
Download: ML20134N113 (2)


See also: IR 05000373/1996019

Text

- -

.

.

. . - -

. - .

. - - .

- - - - . - . - - .

,

_ - . - -

-_-

'

,

.

,

,

I

February 14, 1997

.'

!

4

Mr. W. T. Subalusky, Jr.

Site Vice President

4

i.aSalle County Station

1

)

Commonwealth Edison Company

l

2601 North 21st Road

Marseilles, IL 61341

,

j

SUBJECT:

NRC INSPECTION REPORT 50-373/374/96019(DRS) AND NOTICE OF

VIOLATION

Dear Mr. Subalusky:

On February 3,1997, the NRC completed an inspection at your LaSalle facility. The

enclosed report presents the results of that inspection. The inspection included a review

of the authorized activities for your LaSalle 2 Nuclear Power Station. The focus of this

inspection was the use of the Nuclear Design Information Transmittals (NDIT) procedure

and its LaSalle Appendix. Based on the results of this inspection, the NRC has determined

that two violations of NRC requirements occurred. These violations are cited in the

enclosed Notice of Violation (Notice) and the circumstances surrounding them are

4

described in detail in the enclosed inspection report.

,

The first violation is of concern because the engineering department, from late 1995 until

October 1996, used the NDIT process to facilitate minor modifications rather than the

i

process established by station procedures. The second violation is of concern because the

site appendix to the corporate NDIT procedure had not been reviewed and approved as

!

required by the station's technical specifications. This issue had been previously identified

by your site quality organization; however, our review of the resolution found that it did

not satisfy the plant's technical specifications.

You are required to respond to this letter and should follow the instructions specified in the

,

^

enclosed Notice when preparing your response. In addition, in your response to the first

violation, identify any other inappropriate uses of the NDIT, such as operability

,

evaluations. After reviewing your response to this Notice, including your proposed

corrective actions and the results of future inspections, the NRC will determine whether

'

.

7

' further NRC enforcement action is necessary to ensure compliance with NRC regulatory

'

f

requirements,

(())

i

!

.

/

3

9702210208 970214

PDR

ADOCK 05000373

0

PDR

i

.- _.

_-.

-

- _.

-

_ _ . -

- - - . -

-.

.-

. .

-

.

.

.

.

W. T. Subalusky, Jr.

-2-

February 14, 1997

-

i

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter,

its enclosure, and your response will be placed in the NRC Public Document Room.

)

Sincerely,

3

i

/s/ M. Icach (for)

i

i

Geoffrey E. Grant, Director

,

Division of Reactor Safety

,

,

i

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

'

Enclosures:

1. Notice of Violation

4

2. Inspection Report 50-373/374/96019(DRS)

1

'

cc w/encis:

T. J. Maiman, Senior Vice President,

Nuclear Operations Division

4

]

D. A. Sager, Vice President,

Generation Support

-

H. W. Keiser, Chief Nuclear

'

,

Operating Officer

l

D. J. Ray, Station Manager

l

J. Burns, Regulatory Assurance

Supervisor

'

i. Johnson, Acting Nuclear

j

Regulatory Services Manager

j

Document Control Desk - Licensing

-

Richard Hubbard

Nathan Schloss, Economist,

j

Office of the Attorney General

i

State Liaison Officer

Chairman, Illinois Commerce Commission

4

]

Distribution:

j

Docket File w/enci

Rlli PRR w/enct

W. L. Axelson, Rlli w/enci

%C.'IE-01[wlerict

SRis, LaSalle, Dresden,

R. A. Capra, NRR w/enci

!

bC/LFDCB w/onci

Quad Cities w/enct

Enf. Coordinator, Rill w/enci

DRP w/enci

LPM, NRR w/ encl

CAA1 w/enci

DRS w/ encl

A. B. Beach, Rlll w/ encl

4

DOCUMENT NAME: G:\\LAS96019.DRS

To receive a copy of this docurnent, indicate in the box 'C' = Copy w/o attach /enci"E" = Copy w/ attach /enci"N" = No copy

,'

0FFICE

Rill:DRS

l

RIII:DRS

_l

Rlll:DRP

M

Rill:DRS

lW

NAME

Jones (A4

Kropp /4

Dapas #7/M

Leach / Grant e

DATE

02/f/ /97

02/ // '/97

02/ y /97

02/ /*- /97

0FFICIAL RECORD COPY

'

.