Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134M430 + (ML20134M430)
- ML20134M433 + (ML20134M433)
- ML20134M434 + (ML20134M434)
- IR 05000429/2008014 + (ML20134M435)
- 05000263/LER-1996-010-01, :on 961016,panel Fire Barriers Were Not in Correct Position.Cause Unknown.Barrier Restored to Proper Position & Other Barriers in C04 & C08 in CR Checked.W/ + (ML20134M436)
- ML20134M437 + (ML20134M437)
- 3F0885-03, Responds to Violations Noted in Insp Rept 50-302/85-26. Corrective Actions:Ltr Sent to All Site Nuclear Operations Personnel Re Maintaining Current Clearance Order W/Appropriate Work Request at Job Site + (ML20134M439)
- ML20134M440 + (ML20134M440)
- IR 05000348/1985033 + (ML20134M441)
- 05000374/LER-1996-009-06, :on 961016,potential Degradation of Post Loss of Coolant ECCS Recirculation Capability Noted as Result of Discovery of Foreign Matl in Pressure Suppression Pool.Divers Performed Underwater Insp of PSP + (ML20134M442)
- ML20134M446 + (ML20134M446)
- ML20134M451 + (ML20134M451)
- ML20134M452 + (ML20134M452)
- ML20134M453 + (ML20134M453)
- ML20134M454 + (ML20134M454)
- ML20134M456 + (ML20134M456)
- ML20134M457 + (ML20134M457)
- PNO-IV-85-044B, on 850827,truck/train Accident Occurred Involving Spread of U Concentrates.Recovery Will Be Completed by 850907.Bioassay Samples to Be Tested.Nasal Smears Negative + (ML20134M460)
- ML20134M462 + (ML20134M462)
- ML20134M463 + (ML20134M463)
- ML20134M465 + (ML20134M465)
- ML20134M471 + (ML20134M471)
- ML20134M472 + (ML20134M472)
- 0CAN068507, Responds to NRC 850613 Request for Addl Info Re Deviation Noted in Insp Repts 50-313/85-02 & 50-368/85-02.Corrective actions:QAP-13 Will Be Revised to Enhance Effectiveness of Future Audits of Emergency Planning Program + (ML20134M473)
- ML20134M475 + (ML20134M475)
- ML20134M477 + (ML20134M477)
- ML20134M478 + (ML20134M478)
- ML20134M480 + (ML20134M480)
- 05000445/LER-1996-008, :on 961017,two Pressurizer Safety Valves Were Found with Unsatisfactory Lift Setpoints.Caused by Setpoint Drift.Valves Were Returned to Operable Status Using Normal Rework for Components + (ML20134M483)
- IR 05000458/1985033 + (ML20134M484)
- ML20134M487 + (ML20134M487)
- ML20134M488 + (ML20134M488)
- PY-CEI-NRR-0323, Responds to Request for Addl Info Re Switchgear Room Fire Fighting Flooding,Specifically Drainage Capability & Effect of Drained Water on Safe Shutdown or safety-related Equipment.Supporting Gilbert/Commonwealth,Inc Ltr Encl + (ML20134M489)
- ML20134M490 + (ML20134M490)
- RBG-21705, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-33 on 850415-0627.Corrective Actions:All Insp Disciplines Reviewed Sample of Insp Repts for Instances Where Results Changed by Reviewer W/O Justification + (ML20134M493)
- IR 05000298/1985020 + (ML20134M496)
- ML20134M498 + (ML20134M498)
- ML20134M499 + (ML20134M499)
- ML20134M501 + (ML20134M501)
- ML20134M502 + (ML20134M502)
- ML20134M505 + (ML20134M505)
- ML20134M506 + (ML20134M506)
- ML20134M507 + (ML20134M507)
- ML20134M508 + (ML20134M508)
- ML20134M510 + (ML20134M510)
- ML20134M511 + (ML20134M511)
- ML20134M514 + (ML20134M514)
- 05000309/LER-1996-035, :on 961018,requirement for Post Accident Iodine Sampling Inadvertently Removed from Procedure.Caused by Inadequate Control of Licensing Commitment.Procedure 9-304-1 Was Corrected + (ML20134M515)
- IR 05000458/1985058 + (ML20134M517)
- IR 05000309/1996016 + (ML20134M521)
- ML20134M522 + (ML20134M522)