Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217K9401999-10-0606 October 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990930,IAW 10CFR73.71.No Safeguards Events Occurred ML20210R9181999-08-13013 August 1999 Forwards Insp Rept 50-409/99-02 on 990726-28.No Violations Noted ML20210F3651999-07-0909 July 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990630,IAW 10CFR73.71 & LACBWR Security Plan ML20196D5161999-06-21021 June 1999 Discusses Rev 19 to Various Portions of Lacrosse Boiling Water Reactor Emergency Plan Submitted Under Provisions of 10CFR50.54(q).NRC Initial Review of Changes Will Be Subject to Insp to Confirm No Decrease in Effectiveness of Plan ML20207G1991999-06-0303 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Reorganization Chart Encl ML20206R9211999-05-10010 May 1999 Forwards Annual Financial Rept & Certified Financial Statements for DPC for Years 1998 & 1997,IAW 10CFR50.71(b). Util Will Forward 1998 Annual Rept as Soon as Rept Is Completed ML20206H6771999-05-0505 May 1999 Forwards Insp Rept 50-409/99-01 on 990414-16.No Violation Noted.Overall Performance During Decommissioning/Safe Storage Activities Was Good ML20206J3671999-04-30030 April 1999 Forwards Rev 13 to QA Program Description, IAW 10CFR50.54(a)(3) & 50.4(b)(7).Changes in Rev 13 Listed ML20205R4261999-04-0808 April 1999 Submits Ltr for Calendar Quarter Ending 990331 IAW 10CFR73.71, Reporting of Safeguards Events. No Safeguards Events Occurred During Quarter ML20204F8291999-03-0909 March 1999 Forwards Annual Rept on Status of Decommissioning Funding for La Crosse Boiling Water Reactor,Iaw 10CFR50.75(f)(1) ML20207C2661999-02-19019 February 1999 Forwards Radioactive Effluent Rept & Radiological Monitoring Rept for 1998 for Lacbwr. Lacbwr,Pcp & ODCM, Encl ML20207A9431999-02-11011 February 1999 Forwards Revised Pages to LACBWR Decommissioning Plan. Each Page with Change Will Have Bar in right-hand Margin to Designate Location of Change ML20198E4371998-12-17017 December 1998 Forwards Insp Rept 50-409/98-05 on 981207-10.No Violations Noted.Activities in Areas of Facility Mgt & Control,Spent Fuel Safety & Radiological Safety Were Examined ML20196A8921998-11-23023 November 1998 Forwards Rev 12 to LACBWR QA Program Description ML20155H4221998-11-0303 November 1998 Ack Receipt of Re Insp Rept 50-409/98-02,in Response to Transmitting Predecisional EC Summary & Exercise of Enforcement Discretion Re Compliance with Maint Rule ML20154K0191998-10-13013 October 1998 Forwards Insp Rept 50-409/98-04 on 980921-22.No Violations Noted ML20154P4351998-10-13013 October 1998 Responds to Re Insp Rept 50-409/98-02 & Refers to C/As Taken to Bring LACBWR Into Compliance with Maint Rule IR 05000409/19980021998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20151Z6501998-09-17017 September 1998 Discusses Predecisional Enforcement Conference Held on 980630 Re Insp Rept 50-409/98-02 & Exercise of Enforcement Discretion.Two Apparent Violations,Involving Failure to Implement Key Aspects of Maintenace Rule,Identified ML20153F7431998-09-14014 September 1998 Informs That Changes Made in Rev 12 Are Adminstrative in Nature & Do Not Result in Reduction in Commitment to Safety & Reliably Operate LACBWR in Safstor Condition,Per 980909 Telcon with NRC ML20237D8861998-08-21021 August 1998 Advises That Rev 18 to Portions of Emergency Plan Do Not Decrease Effectiveness of Plan & Plan Continues to Meet Relevant Stds of 10CFR50.47(b) & Therefore,Nrc Approval Not Required ML20237B9181998-08-17017 August 1998 Forwards Insp Rept 50-409/98-03 on 980811-12.No Violations Were Noted.Insp Included Review of Physical Security Plan for LACBWR ML20236W8111998-08-0303 August 1998 Forwards Summary of Decommissioning Insp Plan for Oct 1998 - Apr 1999,for Info.Plan Will Be Updated Approx Twice Yearly & May Be Revised at Any Time Based on Future Insp Findings, Events & Resource Availability ML20237E2631998-07-15015 July 1998 Forwards Rev 12 to QA Program Description. Page Change Locations Indicated by Bold Bar in right-hand Margin ML20236K7091998-07-0606 July 1998 Forwards Official Transcript Proceedings from 980513,public Meeting Held in Viroqua,Wi on Decommissioning of Lacrosse Boiling Water Reactor.Pen & Ink Changes Made to Original Transcript to Correct Errors & to Clarify Abbreviations ML20249A8331998-06-15015 June 1998 Expresses Appreciation for Support Provided for Recent Meeting Held at Viroqua High School - Middle School Complex on Decommissioning of Lacrosse Boiling Water Reactor ML20248M0461998-06-0909 June 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Viroqua High School on Decommissioning of LACBWR ML20216B9311998-05-0707 May 1998 Forwards Insp Rept 50-409/98-01 on 980420-0423.No Violations Noted ML20217K7121998-03-27027 March 1998 Forwards Rev 18 to LACBWR Emergency Plan.Bar Lines in right- Hand Margins Note Changes.Description of Each Change & Reason for Change Is Included as Cover Pages to Plan Rev ML20203K2041998-02-27027 February 1998 Forwards Summary of Decommissioning Insp Plan for Remainder of FY1998.Plan Will Be Updated Approx Twice Each Yr & May Be Revised Any Time Based on Future Insp Findings,Events, Resource Availabilty,Etc ML20202J4261998-02-16016 February 1998 Forwards Revised LACBWR Decommissioning Plan & Revised LACBWR Initial Site Characterization Survey for Safstor. Both Documents Revised Jan 1998 ML20202J0381998-02-10010 February 1998 Forwards Revised LACBWR Decommissioning Plan. Each Page W/Change Will Have Bar in right-hand Margin to Designate Location of Change ML20199A9351998-01-19019 January 1998 Forwards Insp Rept 50-409/97-01 on 971209-11 & 980107.No Violations Noted.Activities in Areas of Facility Mgt, Decommissioning Support,Spent Fuel Safety & Radiological Safety Were Examined During Insp ML20199J4111997-11-21021 November 1997 Informs That NRC Regional Oversight Responsibilities for LACBWR Has Been Transferred to Region III Div of Nuclear Matls Safety.Effective 971105 D Nelson Became Region III Point of Contact for Routine LACBWR Insp Matters ML20198R9721997-10-24024 October 1997 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encl Withheld ML20149G1311997-07-10010 July 1997 Submits Ltr Re Quarterly Submittal of Safeguards Events Log for Quarter Ending 970630.No Safeguards Events During Past Quarter ML20148S9131997-07-0303 July 1997 Forwards Annual Financial Rept & Certified Financial Statements for Dairyland Power Cooperative for 1996 & 1995 ML20141H5581997-05-20020 May 1997 Discusses Change in Ofc as of 970520.Project Mgt for Facility BWR Will Be Assumed by Pw Harris.Site Visit Will Be Arranged Convenient to Both Staff & Scheduled Activities ML20141B7521997-05-0909 May 1997 Forwards TS Re Changes to LACBWR Controlling Documents ML20138H8011997-04-29029 April 1997 Forwards Corrected Page to Safety Evaluation,Issued by NRC, by Ltr Dtd 970425.W/o Ltr ML20138B6821997-04-25025 April 1997 Forwards Corrected Page 8 of SE for Amend 69 to La Crosse Boiling Water Reactor License ML20138A6431997-04-15015 April 1997 Forwards Rev 11 to LACBWR QA Program Description ML20137R7651997-04-11011 April 1997 Forwards Safety Evaluation Approving Changes to QAP Description ML20138B7261997-04-10010 April 1997 Submits Ltr for Calendar Quarter Ending 970331,IAW 10CFR73.71 & LACBWR Security Plan ML20134H1841997-01-31031 January 1997 Submits Quarterly Safeguards Event Log Re License DPR-45 ML20133A3721996-12-16016 December 1996 Forwards Rev 17 to LACBWR Emergency Plan ML20132F8601996-12-10010 December 1996 Forwards Revised LACBWR Decommissioning Plan. Each Page W/ Change Will Have Bar in right-hand Margin to Designate Location of Change ML20134M2421996-11-0505 November 1996 Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals ML20149F2461994-08-0202 August 1994 Ack Receipt of 10CFR50.54(a) Submittal Dtd 940620,which Incorporates Changes in Quality Assurance Program Description ML20058P1281993-12-0909 December 1993 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790(d)) 1999-08-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K9401999-10-0606 October 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990930,IAW 10CFR73.71.No Safeguards Events Occurred ML20210F3651999-07-0909 July 1999 Submits Safeguards Event Log for Calendar Quarter Ending 990630,IAW 10CFR73.71 & LACBWR Security Plan ML20206R9211999-05-10010 May 1999 Forwards Annual Financial Rept & Certified Financial Statements for DPC for Years 1998 & 1997,IAW 10CFR50.71(b). Util Will Forward 1998 Annual Rept as Soon as Rept Is Completed ML20206J3671999-04-30030 April 1999 Forwards Rev 13 to QA Program Description, IAW 10CFR50.54(a)(3) & 50.4(b)(7).Changes in Rev 13 Listed ML20205R4261999-04-0808 April 1999 Submits Ltr for Calendar Quarter Ending 990331 IAW 10CFR73.71, Reporting of Safeguards Events. No Safeguards Events Occurred During Quarter ML20204F8291999-03-0909 March 1999 Forwards Annual Rept on Status of Decommissioning Funding for La Crosse Boiling Water Reactor,Iaw 10CFR50.75(f)(1) ML20207C2661999-02-19019 February 1999 Forwards Radioactive Effluent Rept & Radiological Monitoring Rept for 1998 for Lacbwr. Lacbwr,Pcp & ODCM, Encl ML20207A9431999-02-11011 February 1999 Forwards Revised Pages to LACBWR Decommissioning Plan. Each Page with Change Will Have Bar in right-hand Margin to Designate Location of Change ML20196A8921998-11-23023 November 1998 Forwards Rev 12 to LACBWR QA Program Description ML20154P4351998-10-13013 October 1998 Responds to Re Insp Rept 50-409/98-02 & Refers to C/As Taken to Bring LACBWR Into Compliance with Maint Rule ML20153F7431998-09-14014 September 1998 Informs That Changes Made in Rev 12 Are Adminstrative in Nature & Do Not Result in Reduction in Commitment to Safety & Reliably Operate LACBWR in Safstor Condition,Per 980909 Telcon with NRC ML20237E2631998-07-15015 July 1998 Forwards Rev 12 to QA Program Description. Page Change Locations Indicated by Bold Bar in right-hand Margin ML20217K7121998-03-27027 March 1998 Forwards Rev 18 to LACBWR Emergency Plan.Bar Lines in right- Hand Margins Note Changes.Description of Each Change & Reason for Change Is Included as Cover Pages to Plan Rev ML20202J4261998-02-16016 February 1998 Forwards Revised LACBWR Decommissioning Plan & Revised LACBWR Initial Site Characterization Survey for Safstor. Both Documents Revised Jan 1998 ML20202J0381998-02-10010 February 1998 Forwards Revised LACBWR Decommissioning Plan. Each Page W/Change Will Have Bar in right-hand Margin to Designate Location of Change ML20198R9721997-10-24024 October 1997 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encl Withheld ML20149G1311997-07-10010 July 1997 Submits Ltr Re Quarterly Submittal of Safeguards Events Log for Quarter Ending 970630.No Safeguards Events During Past Quarter ML20148S9131997-07-0303 July 1997 Forwards Annual Financial Rept & Certified Financial Statements for Dairyland Power Cooperative for 1996 & 1995 ML20141B7521997-05-0909 May 1997 Forwards TS Re Changes to LACBWR Controlling Documents ML20138H8011997-04-29029 April 1997 Forwards Corrected Page to Safety Evaluation,Issued by NRC, by Ltr Dtd 970425.W/o Ltr ML20138A6431997-04-15015 April 1997 Forwards Rev 11 to LACBWR QA Program Description ML20138B7261997-04-10010 April 1997 Submits Ltr for Calendar Quarter Ending 970331,IAW 10CFR73.71 & LACBWR Security Plan ML20134H1841997-01-31031 January 1997 Submits Quarterly Safeguards Event Log Re License DPR-45 ML20133A3721996-12-16016 December 1996 Forwards Rev 17 to LACBWR Emergency Plan ML20132F8601996-12-10010 December 1996 Forwards Revised LACBWR Decommissioning Plan. Each Page W/ Change Will Have Bar in right-hand Margin to Designate Location of Change ML20134M2421996-11-0505 November 1996 Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals ML20058P1281993-12-0909 December 1993 Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790(d)) ML20059G6131993-11-0101 November 1993 Responds to Re Violations Noted in Insp Rept 50-409/93-01 on 930903 & 22 & 24.Corrective Actions: Reassigned Mechanics & Instrument Technician to LACBWR Staff ML20056E2601993-08-12012 August 1993 Forwards Nonproprietary & Proprietary Version of Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve. Proprietary Version Withheld ML20056E2681993-05-11011 May 1993 Requests That Proprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve Be Withheld,Per 10CFR2.790(b)(4) ML20128P4611993-02-11011 February 1993 Forwards Rev to Annual Decommissioning Plan,Changing Requirement to Maintain Hourly Meteorological Data Logging for Effluent Release Calculations & Removing Makeup Demineralizer Sys ML20128K5891993-02-0909 February 1993 Forwards Corrected App a to Annual Rept for 1992 - Rept of Changes,Tests & Experiments ML20055H6371990-07-25025 July 1990 Forwards Decommissioning Fund Rept for Plant ML18041A2111989-11-16016 November 1989 Responds to Generic Ltr 89-19 Re Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Actions or Recommendations in Generic Ltr Will Not Be Performed ML20248C5941989-09-21021 September 1989 Forwards Revised Radioactive Effluent Rept for LACBWR (Jan- June 1989), Incorporating Sr-89/90 & Fe-55 Analysis Data ML20247A1931989-08-22022 August 1989 Forwards Proposed Operator Licensing Exam Schedule Format for FY90 - FY93,in Response to Generic Ltr 89-12 ML20245G0911989-07-27027 July 1989 Advises That Util Already Exempt from 10CFR26, Fitness-for- Duty Program Because of Safstor Status.Request for Exemption Will Not Be Necessary Since License Amended to possession-only License Via Amend 63 ML20246K8411989-07-10010 July 1989 Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2, Spds. All Spent Fuel Transferred from Reactor to Spent Fuel Storage Well & on 870804,License DPR-45 Amended to possess- but-do-not-operate Status ML20246B8371989-06-27027 June 1989 Forwards Endorsements 71,72,73,74,75 & 76 to Nelia Policy NF-217 ML20245A1231989-06-0606 June 1989 Submits Whole Body Dose Estimates & Request for Changes to Tech Specs 6.8.3.1 & 6.8.4 ML20248C2861989-06-0101 June 1989 Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Generic Ltr Does Not Apply to Plant Since No Sys Operate as High Energy Sys ML20247B3121989-05-0808 May 1989 Responds to NRC Re Conduct of Backfit Process, Informing NRC of Plant Permanent Shutdown in Apr 1987 ML20248F1421989-04-0707 April 1989 Forwards Annual Financial Rept & Certified Financial Statements for 1987 & 1988.W/o Annual Financial Rept ML20246N8041989-03-17017 March 1989 Submits Info Re on-site Property Damage Insurance for License DPR-45 for Period 880919 - 890919 ML20204G9191988-10-13013 October 1988 Requests Immediate Relief from Several Sampling & Analysis Requirements of Radiological Environ Monitoring Program to Check for Prescence of I-131.Tech Spec Changes Encl ML20155A3101988-09-30030 September 1988 Responds to NRC 880707 Request for Addl Info Re Decommissioning Plan.Info Includes Flooding Potential & Protection Requirements,Flood Conditions & Effects of High Water Level on Structures ML20154L3511988-09-0909 September 1988 Forwards Answers to Request for Addl Info Re Decommissioning Plan & Safe Storage Tech Specs.Some Answers Suggest Changes to Either Tech Specs or Decommissioning Plan ML20154J3411988-09-0808 September 1988 Forwards Revs to Security,Training & Qualification & Contingency Plans.Revs Withheld (Ref 10CFR2.790(d)) ML20154E4671988-08-30030 August 1988 Responds to Generic Ltr 88-13, Operator Licensing Exams. NRC Will Require Qualified Individuals to Be in Charge of Control Room & Fuel Handling Operations ML20207D1801988-08-0303 August 1988 Advises That Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls Inapplicable to Facility.Reactor Vessel Will Not Be Subj to Pressurization in Plant Safstor Condition 1999-07-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20055H6371990-07-25025 July 1990 Forwards Decommissioning Fund Rept for Plant ML18041A2111989-11-16016 November 1989 Responds to Generic Ltr 89-19 Re Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Actions or Recommendations in Generic Ltr Will Not Be Performed ML20248C5941989-09-21021 September 1989 Forwards Revised Radioactive Effluent Rept for LACBWR (Jan- June 1989), Incorporating Sr-89/90 & Fe-55 Analysis Data ML20247A1931989-08-22022 August 1989 Forwards Proposed Operator Licensing Exam Schedule Format for FY90 - FY93,in Response to Generic Ltr 89-12 ML20245G0911989-07-27027 July 1989 Advises That Util Already Exempt from 10CFR26, Fitness-for- Duty Program Because of Safstor Status.Request for Exemption Will Not Be Necessary Since License Amended to possession-only License Via Amend 63 ML20246K8411989-07-10010 July 1989 Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2, Spds. All Spent Fuel Transferred from Reactor to Spent Fuel Storage Well & on 870804,License DPR-45 Amended to possess- but-do-not-operate Status ML20246B8371989-06-27027 June 1989 Forwards Endorsements 71,72,73,74,75 & 76 to Nelia Policy NF-217 ML20245A1231989-06-0606 June 1989 Submits Whole Body Dose Estimates & Request for Changes to Tech Specs 6.8.3.1 & 6.8.4 ML20248C2861989-06-0101 June 1989 Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Generic Ltr Does Not Apply to Plant Since No Sys Operate as High Energy Sys ML20247B3121989-05-0808 May 1989 Responds to NRC Re Conduct of Backfit Process, Informing NRC of Plant Permanent Shutdown in Apr 1987 ML20248F1421989-04-0707 April 1989 Forwards Annual Financial Rept & Certified Financial Statements for 1987 & 1988.W/o Annual Financial Rept ML20246N8041989-03-17017 March 1989 Submits Info Re on-site Property Damage Insurance for License DPR-45 for Period 880919 - 890919 ML20204G9191988-10-13013 October 1988 Requests Immediate Relief from Several Sampling & Analysis Requirements of Radiological Environ Monitoring Program to Check for Prescence of I-131.Tech Spec Changes Encl ML20155A3101988-09-30030 September 1988 Responds to NRC 880707 Request for Addl Info Re Decommissioning Plan.Info Includes Flooding Potential & Protection Requirements,Flood Conditions & Effects of High Water Level on Structures ML20154L3511988-09-0909 September 1988 Forwards Answers to Request for Addl Info Re Decommissioning Plan & Safe Storage Tech Specs.Some Answers Suggest Changes to Either Tech Specs or Decommissioning Plan ML20154J3411988-09-0808 September 1988 Forwards Revs to Security,Training & Qualification & Contingency Plans.Revs Withheld (Ref 10CFR2.790(d)) ML20154E4671988-08-30030 August 1988 Responds to Generic Ltr 88-13, Operator Licensing Exams. NRC Will Require Qualified Individuals to Be in Charge of Control Room & Fuel Handling Operations ML20207D1801988-08-0303 August 1988 Advises That Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls Inapplicable to Facility.Reactor Vessel Will Not Be Subj to Pressurization in Plant Safstor Condition ML20151Q5001988-07-29029 July 1988 Responds to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs ML20151E8791988-07-18018 July 1988 Requests Revised Submittal of Deadline of 881001 to Facilitate Review of Questions Re Decommissioning Plan. Partial Submittal Will Be Made as Soon as Possible ML20151D4161988-07-15015 July 1988 Responds to NRC Bulletin 87-002,Suppls 1 & 2, Fastener Testing to Determine Conformance W/Applicable Matl Specs. Fastener Purchases Will Be Monitored Through Procurement Control & Receipt Insp Processes ML20196J2371988-06-22022 June 1988 Responds to NRC Re Violations Noted in Insp Rept 50-409/88-06.Semiannual Whole Body Counts Required by Procedure But Not by Regulation ML20196J1391988-06-22022 June 1988 Responds to NRC Bulletin 88-005 & Suppl 1 to Bulletin Re Nonconforming Matls Supplied by Piping Suppliers,Inc.Review of Procurement Documents Indicated That No Procurement Made W/Piping Suppliers,Inc ML20155E3431988-06-0606 June 1988 Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Demineralized Water Transfer Sys Has Potential for dead-heading of One Pump,But Sys Not safety-related.No Actions Planned in Response to Bulletin ML20154J3291988-05-18018 May 1988 Forwards Change to Rev 10 to Emergency Plan Section 3.8.1, Radiological Protection of Onsite Personnel, Per 880511 Request.Change Describes Conditions for Precautionary Onsite Sheltering & Control Room Ventilation Isolation ML20154F9581988-05-16016 May 1988 Responds to NRC Bulletin 85-003,Suppl 1, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Addl safety-related motor- Operated Valves Found ML20154D5871988-05-10010 May 1988 Submits Info Re Level & Sources of Onsite Property Damage Insurance,Per 10CFR50.54(w).Effective Dates of Primary Coverage Are 870919-880919 ML20154P7371988-04-29029 April 1988 Responds to NRC Re Violations Noted in Insp Rept 50-409/88-03.Corrective Actions:Operations Review Committee Meeting Convened to Discuss Implications of Event.Individual Counseled Re Attention to Duty ML20151U0351988-04-28028 April 1988 Forwards Rev 2 to Plant Physical Security,Guard Force Training & Safeguards Contingency Plans.Encls Withheld (Ref 10CFR2.790(d)) ML20151M7871988-04-18018 April 1988 Forwards Annual Financial Rept & Cetified Financial Statements for 1986 & 1987.Annual Rept for 1987 Will Be Forwarded as Soon as Possible ML20151M8251988-04-15015 April 1988 Responds to 880128 & 0219 Requests for Addl Info Re Plant Emergency Plan & Forwards Rev 10 to Plan.Map of LACBWR Site Defining Emergency Planning Zone Will Be Added to Emergency Plan as Figure A-2 on Page A-15 ML20151B2131988-03-28028 March 1988 Forwards Revised Rev 5 to QA Program Description for possession-only Condition.Revised Pages Reflect Recent Organizational Change ML20148H0511988-03-28028 March 1988 Forwards Revs to Amended Security,Guard Force Training & Qualification & Safeguards Contingency Plans Submitted on 870924.Encls Withheld (Ref 10CFR2.790) ML20196H3531988-02-25025 February 1988 Responds to NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. No Westinghouse Ds Series Circuit Breakers Installed at Facility ML20149N0351988-02-22022 February 1988 Forwards Revised Pages to 870930 Application for Amend to License DPR-45 ML20149J1261988-02-16016 February 1988 Responds to Generic Ltr 88-02 Re Isap Ii.Participation in Program Would Not Further Interests of Util,Since Facility Permanently Shut Down on 870430 & Defueling Completed on 870611 ML20234C3601987-12-21021 December 1987 Forwards Rev 5 to Facility QA Program Description.Analyses Show That No Postulated Accident Would Result in Release Exceeding 10CFR100 Limits,In Present Plant Condition ML20147A8031987-12-21021 December 1987 Forwards Decommissioning Plan & Suppl to Environ Rept for Facility post-operating License Stage,For Review.Proposed Tech Specs for Safstor Period Will Be Submitted Separately. Fee Paid ML20236X8671987-11-30030 November 1987 Forwards 870929 Application Fee for Review of Emergency Plan Rev,In Response to from Diggs to Taylor ML20236M4541987-11-0505 November 1987 Discusses Review of Surveillance Testing Performed Due to 870430 Plant Shutdown.Performance of Listed Tests No Longer Required by Tech Specs Terminated ML20236J8301987-10-30030 October 1987 Confirms That Util Not Required to Pay Annual Fee for Power Reactor OLs or Seek Renewal of Exemption Reducing Amount of Such Fee,Per Issuance of Amend 56 to License DPR-45 on 870804 ML20236J4471987-10-30030 October 1987 Forwards Application Fee for Amend to License DPR-45, Inadvertently Omitted from ML20235X0991987-10-12012 October 1987 Forwards Payment in Amount of $25,000 in Response to 870224 Notice of Violation & Proposed Imposition of Civil Penalty ML20235R1541987-10-0101 October 1987 Provides Supplemental Info Re Requesting Exemption from Requirements to Conduct Annual Emergency Preparedness Exercise.Util Plans to Conduct Exercise within 180 Days After NRC Approval of 870930 Rev ML20235R0161987-09-29029 September 1987 Forwards Emergency Plan Rev,Reflecting Current Status of LACBWR Facility for NRC Approval.Technical Rept,Justifing Proposed Emergency Planning Zone Boundary,Encl ML20235S3321987-09-29029 September 1987 Informs That La Crosse BWR Permanently Shutdown on 870430. Reactor Defuelling Completed on 870611.Listed Active Licensing Actions No Longer Necessary ML20235H4791987-09-24024 September 1987 Forwards Changes to Physical Security,Security Guard Force Training & Qualification & Safeguards Contingency Plans.Fee Paid.Changes Withheld (Ref 10CFR73.21) ML20234E3641987-09-0909 September 1987 Submits Response to IE Bulletin 87-001, Thinning of Pipe Walls in Nuclear Power Plants, Dtd 870709.Formal Insp Program Not Necessary for Continued Safe Fuel Storage at Facility Due to Permanent Termination of Plant Operations ML20238C5201987-09-0202 September 1987 Forwards Endorsements 68 & 69 to Nelia Policy NF-217 ML20238F7371987-09-0101 September 1987 Requests Exemption from 10CFR50,App E Requirement to Conduct Annual Emergency Preparedness Exercise & Requirements to Prepare & Distribute Info Brochure to Residents within 5-mile Epz.Requirements Unnecessary 1990-07-25
[Table view] |
Text
p -
e %
D DA/RYLAND 4
[ COOPERAT/VE eo soxBi7 2eis EAST AV SOUTH . LA CROSSE WISCONSIN 54601 (608) 788 4 000 August 29, 1985 In reply, please refer to LAC-11095 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation Attn: Mr. John Zwolinski, Chief Operating Reactor Branch #5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR PROVISIONAL OPERATING LICENSE NO. DPR-45 NUREG-0827 ITEM 4.21.
3.2 REFERENCES
(1) Letter, LAC-10683 F. Linder (DPC) to J. Zwolinski-(NRC), dated April 8, 1985.
(2) Letter, LS05-85-04-037, J. Zwolinski (NRC) to F.Linder (DPC), dated April 26, 1985.
(3) Letter, LAC-Il060, J. Taylor (DPC) to J. Zwolinski, dated July 31, 1985.
Dear Mr. Zwolinski:
In accordance with above References 2 and 3, please find attached a description of our proposed design to incorporate a back-up isolation valve on the Shutdown Condenser noncondensible gas vent line (Attachment I) and a radiation exposure / cost analysis to implement installation of the subject modification (Attachment II).
Based on a current quotation for the proposed back-up isolation valve and tentative 1986 refueling outage schedule, the possibility exists that the solenoid valve may not be available in time to permit completion of the modification during the 1986 refueling outage. However, every reasonable attempt will be made to improve the delivery of the valve while proceeding on-the balance of the modification workscope. Therefore, as a minimum, we can expect to upgrade the piping system and install the electrical service for the back-up isolation valve during the 1986 refueling outage and if necessary, install and test the back-up isolation valve (time permitting),
during subsequent 1986 refueling planned or unplanned outages.
PCl-9*a 8509040127 850829 PDR ADOCM 05000409:
P I PDRL i
Mr. John Zwolinski, Chief August 29, 1985 Operating Reactor Branch #5 LAC-Il095 If you have any comments regarding our proposed design that may impact our tentative installation schedule, please advise us as early as possible.
If not, we shall proceed as indicated in the attaciunents and keep you advised of any significant design or schedule changes.
Sincerely, DAIRYLAND POWER COOPERATIVE
, /Hif.// hdf James W. Taylor General Manager JWT:DLR:sks cc: J. G. Keppler, Region III NRC Resident Inspector Walter Paulson, LACBWH Project Manager PCI-9.a 2
LAC-11095 ATTACHMENT I Design I. Scope Provide a manual, remotely operated back-up isolation valve on the Shutdown Condenser (SDC) 1" vent line penetration M-19 outside the Containment Vessel in accordance with NUREG-0827 item 4.21.3.2 II. Proposed Design
References:
- 1) NUREG-0827 Final Report dated June 1983.
- 2) Allis-Chalmers Piping Specification for Reactor Plant Systems - LACBWR Project, Spec. No.41-585.
- 3) CB&I Contract No. 8-6902 Drawing 8.
- 4) ASME, ANSI B31.1 Power Piping Code.
- 5) LACBWR Operating Manual Volume II, Section 5.
The present piping arrangement for the SDC 1" vent line, as shown on this attachment page 4, requires upgrade and reclassification due to the installation of a new outboard isolation valve. The proposed design, as shown on page 5 of this attachment, upgrades and reclassifies the piping to plant Class 900-A, and incorporates a new manual, normally open-(de-energized), energize to close, remotely operated solenoid valve located outside of the Containment Vessel upstream of test valve 62-23-050 and valve 55-24-039.-
(1 of 5)
WPl.12.6.
f.
LAC-11095 ATTACHMENT I Design Upgrade and reclassification of the present portion of the Class 150-A piping from the inlet of valve 62-24-004 and outlet of 62-24-005 up to and including valve 55-24-039 necessitates the replacement of manual valves 62-24-004, 55-24-101,.62-23-050 and 55-24-039 which are Class 600 valves with Class 900 or better valves. The present local pressure gage 62-35-801 and valve 62-28-013 will be removed, since the pressure gage serves no purpose, and the line tap will be capped. The existing piping and penetration can be reclassified without any modification or replacement since the pipe material, schedule, fittings, and method of installation satisfies the requirements of plant piping Class 900-A or.the intended service.
Since the purpose of valve 62-25-C03 is to automatically vent noncondensible gases from the SDC at. the onset of SDC operation, it is essential that vent flow path be open downstream of valve 62-25-003 during normal operation. The new remote backup' isolation valve will therefore be a normally open (de-energized), fail open, electric solenoid valve of suitable temperature-pressure rating for the service conditions. This valve will have open,ind closed position indication and will have its electrical supply. front a non-interruptible power source. The hand control and position 3.ndication for the backup
' isolation solenoid valve is planned tx> le located in the main control room.
(2 of 5)
WPl.12.6.
. . . . .-. - - . - . .- ~. . . . - . .,. - . . . . - .
(
LAC-11095 l ATTACHMENT I Design i III. Conclusica Installation of the remote manual backup SDC 1" vent line valve will:-
- 1. Improve the plants ability to remotely isolate the SDC 1" vent line in the event the inboard isolation valve does not close or an internal line break occurs,
- 2. fulfill the requirements as stated in NUREG-0827.
t I
t
, (3 of 5)
'WP1.12.6.
,-r' e -
g - n r- - we en
P LAC-11095 l
ATTACINENT I Design Sketch (Present Arrangement) b 3 j gg .2A ' g 6224' l' - g 10 fl4U1D04U ' g.20 (Ug4ibg6 Y CopotWSR ggoh6 g t S
/
e
~ .
l' h
~ .
g.
CONTAIMMeuf -
W65fL ,... $
$.g f hs ,
9.o f .
j (4 of 5) l
--%.- - e.**
r- ,
LAC-11095 ATTACINENT I Design Sketch (Proposed Modification) ,A
.*'5 3 g.2 4803 p 26
(,1'
,4.# i
- ~.
6HUTDOWU a
' 7 5 p65 COUDENSE f5 F dC
%k Y
l' h g4 M eg n
CouTAIMMeuT WSSEL ...
LAC-11095 ATTACHMENT II Radiation Exposure / Cost Analysis
Subject:
The following provides an analysis of the expected radiation exposure and cost to perform the subject modification to the 1" SDC vent line as described in Attachment I.
I. Radiation Exposure Analysis Performance of the subject modifications required that the plant be shutdown. Thus, it is planned that the modifications will be performed during a refueling outage which will minimize the exposure of personnel.
Is is estimated that the total exposure of all personnel necessary to perform the modifications will be 3 manrem or less.
II. Cost Analysis Est. Cost
- a. Engineering and Superivision 5100.00
- b. Installation Labor 4320.00
- c. Testing 432.00
- d. Direct Materials --
Solenoid Valve 8600.00 Manual valves 200.00 Electrical. 920.00
- e. Consumables & Misc. Matl. 250.00
- f. QA/QC & Procurement 800.00
- g. Procedures & Documentation 480.00 Estimated Totals $21,102.00
, -(1 of 1) 1 WPl.12.6.