Forwards Description of Proposed Design to Incorporate back-up Isolation Valve on Shutdown Condenser Noncondensible Gas Vent Line & Radiation Exposure/Cost Analysis for Implementation of Mod,Per NUREG-0827,Item 4.21.3.2
ML20134M446
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 08/29/1985
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0827, RTR-NUREG-827 LAC-11095, NUDOCS 8509040127
Download: ML20134M446 (8)


Text

p -

e  %

D DA/RYLAND 4

[ COOPERAT/VE eo soxBi7 2eis EAST AV SOUTH . LA CROSSE WISCONSIN 54601 (608) 788 4 000 August 29, 1985 In reply, please refer to LAC-11095 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation Attn: Mr. John Zwolinski, Chief Operating Reactor Branch #5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR PROVISIONAL OPERATING LICENSE NO. DPR-45 NUREG-0827 ITEM 4.21.

3.2 REFERENCES

(1) Letter, LAC-10683 F. Linder (DPC) to J. Zwolinski-(NRC), dated April 8, 1985.

(2) Letter, LS05-85-04-037, J. Zwolinski (NRC) to F.Linder (DPC), dated April 26, 1985.

(3) Letter, LAC-Il060, J. Taylor (DPC) to J. Zwolinski, dated July 31, 1985.

Dear Mr. Zwolinski:

In accordance with above References 2 and 3, please find attached a description of our proposed design to incorporate a back-up isolation valve on the Shutdown Condenser noncondensible gas vent line (Attachment I) and a radiation exposure / cost analysis to implement installation of the subject modification (Attachment II).

Based on a current quotation for the proposed back-up isolation valve and tentative 1986 refueling outage schedule, the possibility exists that the solenoid valve may not be available in time to permit completion of the modification during the 1986 refueling outage. However, every reasonable attempt will be made to improve the delivery of the valve while proceeding on-the balance of the modification workscope. Therefore, as a minimum, we can expect to upgrade the piping system and install the electrical service for the back-up isolation valve during the 1986 refueling outage and if necessary, install and test the back-up isolation valve (time permitting),

during subsequent 1986 refueling planned or unplanned outages.

PCl-9*a 8509040127 850829 PDR ADOCM 05000409:

P I PDRL i

Mr. John Zwolinski, Chief August 29, 1985 Operating Reactor Branch #5 LAC-Il095 If you have any comments regarding our proposed design that may impact our tentative installation schedule, please advise us as early as possible.

If not, we shall proceed as indicated in the attaciunents and keep you advised of any significant design or schedule changes.

Sincerely, DAIRYLAND POWER COOPERATIVE

, /Hif.// hdf James W. Taylor General Manager JWT:DLR:sks cc: J. G. Keppler, Region III NRC Resident Inspector Walter Paulson, LACBWH Project Manager PCI-9.a 2

LAC-11095 ATTACHMENT I Design I. Scope Provide a manual, remotely operated back-up isolation valve on the Shutdown Condenser (SDC) 1" vent line penetration M-19 outside the Containment Vessel in accordance with NUREG-0827 item 4.21.3.2 II. Proposed Design

References:

1) NUREG-0827 Final Report dated June 1983.
2) Allis-Chalmers Piping Specification for Reactor Plant Systems - LACBWR Project, Spec. No.41-585.
3) CB&I Contract No. 8-6902 Drawing 8.
4) ASME, ANSI B31.1 Power Piping Code.
5) LACBWR Operating Manual Volume II, Section 5.

The present piping arrangement for the SDC 1" vent line, as shown on this attachment page 4, requires upgrade and reclassification due to the installation of a new outboard isolation valve. The proposed design, as shown on page 5 of this attachment, upgrades and reclassifies the piping to plant Class 900-A, and incorporates a new manual, normally open-(de-energized), energize to close, remotely operated solenoid valve located outside of the Containment Vessel upstream of test valve 62-23-050 and valve 55-24-039.-

(1 of 5)

WPl.12.6.

f.

LAC-11095 ATTACHMENT I Design Upgrade and reclassification of the present portion of the Class 150-A piping from the inlet of valve 62-24-004 and outlet of 62-24-005 up to and including valve 55-24-039 necessitates the replacement of manual valves 62-24-004, 55-24-101,.62-23-050 and 55-24-039 which are Class 600 valves with Class 900 or better valves. The present local pressure gage 62-35-801 and valve 62-28-013 will be removed, since the pressure gage serves no purpose, and the line tap will be capped. The existing piping and penetration can be reclassified without any modification or replacement since the pipe material, schedule, fittings, and method of installation satisfies the requirements of plant piping Class 900-A or.the intended service.

Since the purpose of valve 62-25-C03 is to automatically vent noncondensible gases from the SDC at. the onset of SDC operation, it is essential that vent flow path be open downstream of valve 62-25-003 during normal operation. The new remote backup' isolation valve will therefore be a normally open (de-energized), fail open, electric solenoid valve of suitable temperature-pressure rating for the service conditions. This valve will have open,ind closed position indication and will have its electrical supply. front a non-interruptible power source. The hand control and position 3.ndication for the backup

' isolation solenoid valve is planned tx> le located in the main control room.

(2 of 5)

WPl.12.6.

. . . . .-. - - . - . .- ~. . . . - . .,. - . . . . - .

(

LAC-11095 l ATTACHMENT I Design i III. Conclusica Installation of the remote manual backup SDC 1" vent line valve will:-

1. Improve the plants ability to remotely isolate the SDC 1" vent line in the event the inboard isolation valve does not close or an internal line break occurs,
2. fulfill the requirements as stated in NUREG-0827.

t I

t

, (3 of 5)

'WP1.12.6.

,-r' e -

g - n r- - we en

P LAC-11095 l

ATTACINENT I Design Sketch (Present Arrangement) b 3 j gg .2A ' g 6224' l' - g 10 fl4U1D04U ' g.20 (Ug4ibg6 Y CopotWSR ggoh6 g t S

/

e

~ .

l' h

~ .

g.

CONTAIMMeuf -

W65fL ,... $

$.g f hs ,

9.o f .

j (4 of 5) l

--%.- - e.**

r- ,

LAC-11095 ATTACINENT I Design Sketch (Proposed Modification) ,A

.*'5 3 g.2 4803 p 26

(,1'

,4.# i

~.

6HUTDOWU a

' 7 5 p65 COUDENSE f5 F dC

%k Y

l' h g4 M eg n

CouTAIMMeuT WSSEL ...

  • 55 24-039 (5 of 5) e

LAC-11095 ATTACHMENT II Radiation Exposure / Cost Analysis

Subject:

The following provides an analysis of the expected radiation exposure and cost to perform the subject modification to the 1" SDC vent line as described in Attachment I.

I. Radiation Exposure Analysis Performance of the subject modifications required that the plant be shutdown. Thus, it is planned that the modifications will be performed during a refueling outage which will minimize the exposure of personnel.

Is is estimated that the total exposure of all personnel necessary to perform the modifications will be 3 manrem or less.

II. Cost Analysis Est. Cost

a. Engineering and Superivision 5100.00
b. Installation Labor 4320.00
c. Testing 432.00
d. Direct Materials --

Solenoid Valve 8600.00 Manual valves 200.00 Electrical. 920.00

e. Consumables & Misc. Matl. 250.00
f. QA/QC & Procurement 800.00
g. Procedures & Documentation 480.00 Estimated Totals $21,102.00