ML20134M508
| ML20134M508 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 08/28/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Leddick R LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20134M511 | List: |
| References | |
| NUDOCS 8509040151 | |
| Download: ML20134M508 (2) | |
See also: IR 05000382/1985020
Text
__
,o
.
.
AUG 2 8 7385
In Reply Refer To:
Docket:
50-382/85-20
.
4
Louisiana Power & Light Company
ATTN:
R. S. Loddick, Sr. Vice President
'
NuckSr 'Jperations
142 Delaronde Street
New Orleans, Louisiana 7174
l
Gentlemen:
This refers to the inspection conducted by. Messrs. T. A. Flippo, W. B. Jones,
~
and A. R. Johnson of this office ~ during the period June 1 through July 31,
1985, of activities authorized by NRC.0perating License NPF-38 for Waterford
Steam Electric Station, Unit 3, and to the discussions of ou findings with
Mr. R. P. Barkhurst and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included Phase III test witnessing, test
,
results evaluation, surveillance testing and calibration control,
station batteries, control of design changes and modifications, audits,
Phase III quality activities, auditor and. inspector training, control room
ventilation system emergency outside air intake valves, and operational mode
,
changes. Within these areas, the inspection consisted of selective examination
of procedures and representative records, interviews with personnel, and
>
,
observations by the inspectors.
These findings are documented in the enclosed
inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently,~you are required to respond to
,
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the' clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Action of 1980, PL.96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
,
8509040151 850828'
OgnM W W
ADOCK 05000382
E. H.' Joh"M"
G
E. H. Johnson, Chief
Reactor Projects Branch
j
Enclosures:
(see next page)
N
RIV: RRI
./
D:RPB1
f 1TFlippo/rl:de f}C:PSB
f
LConstable
EJohnson
}l)bl85
lA l85
5lLb'85
\\
\\
.
'
- - - - -
- -
-
- --
-
-
--
s
.
.
Louisiana Power and Light Company
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/85-20
cc w/ enclosures:
Louisiana Power & Light Company
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
ATTN:
R. P. Barkhurst, Plant Manager
Licensing Coordinator
P. O. Box B
P. O. Box B
Killona, Louisiana 70066
Killona, Louisiana 70066
Middle South Services
Louisiana Power & Light Company
ATTN:
Mr. R. T. Lally
ATTN:
K. W. Cook, Nuclear Support
P. O. Box 6100
and Licensing Manager
New Orleans, Louisiana 70161
142 Delaronde Street
New Orleans, Louisiana 70174
Louisiana Radiation Control Program Director
bcc to DMB (IE06)
bec distrib. by RIV
- RPB
D. A. Powers, E0
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/C)
R. P. Denise, DRSP
- EP&RPB
- RIV File
- MIS System
D. Crutchfield, NRR
- 766
i
4
,
-
-n
n
g