Notice of Violation from Insp on 850429-0814
ML20134M430
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/30/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20134M423 List:
References
50-461-85-26, NUDOCS 8509040118
Download: ML20134M430 (1)


See also: IR 05000429/2008014

Text

.

.

l

Appendix  !

NOTICE OF VIOLATION

Illinois Power Company Docket No. 50-461

As a result of the inspection conducted on April 29 - August 14, 1985, and in

accordance with the General Policy and Procedures for NRC Enforcement Actions,

(10 CFR Part 2, Appendix C), the following violation was identified:

10 CFR 50, Appendix 8, Criterion XV, as implemented by Illinois Power Company

Nuclear Power Construction Quality Assurance Manual, Chapter 15, requires

nonconforming items be clearly identified.

Contrary to the above, BA Resident Engineering Traveler Preparation and

Review Group (TPRG) was found to be bypassing the BA NCR program at final

traveler review, by identifying and documenting nonconforming conditions

on an Interoffice Memorandum in lieu of a Nonconformance Report.

This is a Severity Level IV violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to

this office within thirty days of the date of this Notice a written statement

or explanation in reply, including for each violation (1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further violation; and (3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause

shown.

%f

W

-

Dated

AU^ 010c5 ( L

'

J. J. Harrison, Chief

Engineering Branch

G509040110 e50830

PDR ADOCK 05000461

0 PDR