ML20134M440

From kanterella
Jump to navigation Jump to search
Forwards non-proprietary & Proprietary Version of EPIP Procedures Manuals.Proprietary Version Withheld
ML20134M440
Person / Time
Site: Point Beach, Zion  NextEra Energy icon.png
Issue date: 01/24/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19355E729 List:
References
PBL-97-0031, PBL-97-31, NUDOCS 9702200246
Download: ML20134M440 (1)


Text

-___ _...

Wisconsin Electnc POWER COMPANY Point Beoch Nuclear Plant (414) 755-2321 6610 Nuclear Rd., Two Rivers. WI 54241 PBL 97-0031 January 24,1997 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington, DC 20555 Gentlemen:

DOCKETS 50-266 & $0-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCl. EAR PLANT. UNITS 1 & 2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan implementing Procedures Manual. The revised procedures should be filed in your copies of the manual in accordance with the attached instructions.

h' Please note that the procedures containing names and telephone numbers are stamped "NRC ONuY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPliONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public document rooms Sincerely, c

^

Douglas F. Johnson Manager - Regulatory Services and Licensing clb l

\\b4S t

Attachment 200028 Y

cc:

NRC Resident inspector (w/o/c)

Incident Response Center, Region !!!

MG'i4e4 o1 1

9702200246 970124 j

PDR ADOCK 05000266

\\0 P

F PDR q

< -.an

~,n-s