Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134M326 + (ML20134M326)
- ML20134M327 + (ML20134M327)
- ML20134M328 + (ML20134M328)
- PNO-IV-85-046, on 850829,util Received Low Power License. Fuel Load Will Not Start Until Potential for Heavy Weather from Hurricane Elena Resolved.Util Estimates Actual Fuel Movement Will Begin on 850830 + (ML20134M331)
- ML20134M332 + (ML20134M332)
- ML20134M333 + (ML20134M333)
- PY-CEI-NRR-0295, Forwards Summary of Redundant & Independent Means of Keeping Feedwater Piping Filled W/Water post-LOCA & Results of Requested Analyses of Sys Response to LOCA (Retran). Feedwater Lines Should Be Leak Tested W/Water,Per Sser 2 + (ML20134M334)
- ML20134M336 + (ML20134M336)
- ML20134M337 + (ML20134M337)
- ML20134M338 + (ML20134M338)
- PY-CEI-NRR-0320, Forwards Rev to Question 430.11 & Proposed SER Change Reflecting Current Design for Emergency Lighting.Preliminary Detailed Listing of Emergency 8 H Battery Pack Locations to Be Incorporated Into FSAR Also Encl + (ML20134M340)
- ML20134M341 + (ML20134M341)
- B11656, Forwards Clarification of Proposed Rev to Tech Spec 3.13.C(1) Re Refueling Submitted w/850510 Ltr.Revised Page Clarifies That Fuel Returns to Reactor Core,Not Literally to Bottom of Reactor Pressure Vessel + (ML20134M342)
- BECO-96-096, Forwards 1995 Annual Rept for Boston Edison Company,Form 10-Q for Quarter Ended 960930,cash Flow Forecast for 1997 & Narrative Statement of Curtailment of Capital Expenditures + (ML20134M344)
- ML20134M345 + (ML20134M345)
- ML20134M347 + (ML20134M347)
- ML20134M348 + (ML20134M348)
- ML20134M349 + (ML20134M349)
- ML20134M350 + (ML20134M350)
- ML20134M352 + (ML20134M352)
- ML20134M356 + (ML20134M356)
- ML20134M359 + (ML20134M359)
- ML20134M360 + (ML20134M360)
- ML20134M361 + (ML20134M361)
- ML20134M362 + (ML20134M362)
- ML20134M363 + (ML20134M363)
- ML20134M364 + (ML20134M364)
- ML20134M366 + (ML20134M366)
- ML20134M367 + (ML20134M367)
- ML20134M370 + (ML20134M370)
- ML20134M371 + (ML20134M371)
- ML20134M373 + (ML20134M373)
- ML20134M375 + (ML20134M375)
- ML20134M377 + (ML20134M377)
- ML20134M378 + (ML20134M378)
- IR 05000482/1985028 + (ML20134M380)
- ML20134M381 + (ML20134M381)
- ML20134M382 + (ML20134M382)
- ML20134M383 + (ML20134M383)
- ML20134M384 + (ML20134M384)
- ST-HL-AE-1321, Forwards Response to Environ & Hydrological Engineering Branch 850516 Questions 290.5-290.12 & 291.11-291.24. Responses to Questions 290.13-290.15,240.01,291.10 & 291.25 Will Be Provided by 850930.Marked-up Environ Rept Encl + (ML20134M385)
- ML20134M388 + (ML20134M388)
- IR 05000482/1996014 + (ML20134M389)
- IR 05000368/1985007 + (ML20134M390)
- ML20134M391 + (ML20134M391)
- ML20134M392 + (ML20134M392)
- ML20134M393 + (ML20134M393)
- 0CAN078506, Responds to NRC Re Violations Noted in Insp Repts 50-368/85-07 & 50-313/85-07.Corrective Actions:No Fire Door Latch Mods Required & Fuel Handling Area Posted as Requiring Beta Protection + (ML20134M394)
- ML20134M395 + (ML20134M395)
- PNO-II-85-081, on 850820,during Full Power,Reactor Tripped. Caused by Valving Procedure Error by Technician Replacing Reactor Coolant Loop Flow Transmitter.Source Range Channel Being Replaced.Restart Scheduled for 850824 + (ML20134M397)
- ML20134M400 + (ML20134M400)