Text
'
\\
OPERATING DATA REPORT l
d DOCKET N3 50-413 DATE february 14. 1997 OPERATING STATUS COMPLETED BY R.A. Willians 1
TELEPHONE 704-382-5346
- 1. Unit Nae: Catawba 1 J
- i. Reporting Period: January 1, 1997-January 31,1997
- 3. Licensed Thermal Pouer (MWt):
3411
- 4. Naseplate Rating (6ross MWe):
1305s Notes INameplate Rating
- 5. Design Electrical Rating (Net MWe):
!!45 (Bross MWel calculated as
- 6. Maninus Dependable Capacity (Bros < MWe):
1192 1450.000 MVA :.90 power l
- 7. Manisus Dependable Capacity (Net MWe):
!!29 factor per Page lii, B. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last NUREG-0020.
j Report. Give Reasons
- 9. Poner Level To Which Restricted, If Any (Net MWe):
- 10. Reason For Restrictions, If any:
ThisMonth Yr.-to-Date Cuaulative
- 11. Hours In Reporting Period 744.0 744.0 101641.0
- 12. Nusber Of Hours Reactor Was Critical 744.0 744.0 78977.8
- 13. Reactor Reserve Shutdown Hours
- --0--
--0--
- 14. Mcurs Generator On-Line 744.0 744.0 77641.9
- 13. Unit Reserve Shutdown Hours -0--
- 16. Sress Theraal Energy Generated (MWH) 2533075 2533075 253236536
- 17. Gross Electrical Energy Generated (MWH) 915091 915091 89534497 IB. Net Electrical Energy Generated (MWH) 870065 B70065 04225431
- 19. Unit Service Factor 100.0 100.0 76.4
- 20. Unit Availability Factor 100.0 100.0 76.4
- 21. Unit Capacity Factor (Using MDC Net) 103.6 103.6 73.2
- 22. Unit Capacity Facter (Using DER Net) 102.1 102.1 72.4
- 23. Unit Forced Outage Rate 0.0 0.0 7.8
- 26. Shutdcun Scheduled Over Neet 6 Months (Type, Date, and Duration of Each):
None
- 23. If Snut Down At End Of Report Period. Estisated Date of Startup:
- 26. Units In Test Status (Prior to Cossercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERAT!DN 9702200219 970214
^
PDR ADOCK 05000413 R
r d
?
OPERATING DATA REPORT DOCKET NO 50-413 UNIT Catada 1 BATE Februarv 14. 1997 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH Jamary. 1997 El AVERA6E DAILY POWER LEVEL BJ.
AYERAGE DAILY POIER LEVEL
( R -Net) linie-Net) 1 1135 17 1172 2
1165 IB
!!72 1
3 1164 19 1173 I
4 1164 20 1172'
)
I 5
1163 El 1173 6
1171 22 1170 7
1171 23 1169 8
1172 24 1171 9
1171 25 1171 10
!!69 26 1173 11 1172 27 1172 12 -
1173 2B 1170 13 1172 29 1172 1
14 1173 30 1173 15 1173 31 1173
.l l
16 1171 i.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME Carawisa 1 DATE uz /19 / wi REPORT MONTH January 1997 COMPLETED BY x.
a.
williams TELEPHONE t/usi-3uz-ddsp (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER C-Refueling 3-Automatic Scram (NUREG-0161))
D-Regulatorv Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
DOCKET: 50-413 UNIT: Catawba 1 Date: 02/14/97 NARRATIVE
SUMMARY
MONTH: January,1996 1
Catawba Unit I began the month of January operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Wilhams Telephone: (704)- 382-5346 1
l i
i MONT11LY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 1 2.
Scheduled next refueling shutdown: November 1997 3.
Scheduled restart following refueliag: La.nuary 1998 Ti{E PROJECT MANAGER liAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafler require a tecimical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
J 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or
]
l performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuelassemblies (a) in the core: 193 9
(b) in the spent fuel pool: 631 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
9.
Projected date of last refueling which can be accommodated by present license capacity:
September 2009 i
DUKE POWER COMPANY DATE: February 14.1997 Name of
Contact:
R. A. Williams Phone: (704b 382-5346 s
1
~_
l OPERATING DATA REPORT 1
i DOCKFT NO 50-414 DATE February 14. 1997 GPERATING STATUS COMPLETED BY R.A. Williams TFLEPHONE 704-382-5346 1.UnitNaee: Catawba 2
- 2. Reporting Period: January 1, 1997-January 31,1997
- 3. Licensed Thereal Power (MWt):
3411
- 4. Naseplate Rating (Gross MWe):
13051 Notes
- Nameplate Rating.
~
- 5. Design Electrical Rating (Net MWel
!!45 (Gross MWe) calculated as
- 6. Maxinus Dependable Capacity (6ross MWe):
1192 1450.000 MVA
.90 power
- 7. Marious Deper.dable Capacity (Net MWe):
!!29 factor per Page 111,
- 8. If Changes Dccur in Capacity Ratings (ltres Nueber 3 Through 7) Since Last NUREB-0020.
Report. Elve Reasons:
5
- 9. Power Level To Which Restricted, If Any (Wet MWe):
- 10. Reason For Restrictions, if any This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 744.0 91657.0
- 12. Nusber Of Hours Reactor Was Critical 744.0 744.0 73113.1
- 13. Reactor Reserve Shutdown Hours
- - --0--
- 14. Hours Benerator Dn-Line 744.0 744.0 71990.2
- 13. Unit Reserve Shutdown Hours
--0--
--0--
--0--
16, 6 toss Thersal Energy Generated (MWH) 2517350.
2517350 233229426
- 17. Gross Electrical Energy Generated (MWH) 907272 907272 82755905
- 18. Not Electrical Energy Senerated (MWH)-
863062 863062 78008954
- 19. Unit Service Factor 100.0 100.0 78.5
- 20. Unit Availability Factor 100.0 100.0 78.5
- 21. Unit Capacity Factor (Using MDC Net) 102.8 102.8 75.3
- 22. Unit Capacity Factor (Using DER Net) 101.3 101.3 74.3
- 23. Unit Forced Outage Rate 0.0 0.0 8.7 24, Shutdown Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
Refueling - March 22 1997 - 40 days
- 25. If Shut Doun At End Of Report Period. Estinated Date of Startup
- 26. Units in Test Status (Prior to Cessercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
.,....~... -.....,-....~...
GPERATING MTA REPORT I
DOCKET 110 50-414 Ull!T Catad a 2 MTE February 14. 1997-CONPLETED BY R.A.liilliams TELEPHONE 704-382-5346 e
t i
r
- j.,
'fl0 NTH Januarv. 1997 o
l81 AVERAGE MILY poler LEVEL
- l61, AVERAGE DAILY Poller LEVEL
- (fliie*t)
(Illiedlet) i 1'
1162 17 ilu l
2 1[kg 18 1163 3
1158 19 ilM i
?
6,,
-4 1158 20 1163
[
a~
5 1156 El 1163 i
6 1164 22 1163 e
7 1165 23 1161 8
1123 24 1164 1
9 1125 25 1162 10 1161 26 llM '
.i 11 1163 27 11M 1
12 1163 29 1162 13 1163 29
!!65 14 11M 30 1165 15 1163 31 1164
~ 16
!!62 i
4i i
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME camwen z DATE uz/is/s/
REPORT MONTH January 1997 COMPLETED BY x.
A.
w1111ams TELEPHONE
(/us1-362-d3ge (1)
(2)
(3)
(4)
(S)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
D WN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
RX
'NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulato n Restriction 4-Other (Explain)
File ( N G-0161)
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source (Explain) (Explain)
G-Operator Error H-Other
... -.. -..... -. ~. -. - - ~....... - -. -.
....~.. -.. - ~...
. ~..
O t
l DOCKET: 50-414 UNIT: Catawba 2 Date: 02/14/97 I
i l
i NARRATIVE
SUMMARY
i i
l MONTil: January,1996 l
l Catawba Unit 2 began the month of January operating at 100% full power. The unit operated at or near l-100% full power for the entire month.
l l
l l
l 4
i i
l l
I t
i Prepared by: R. A. Williams i
Telephone: (704)- 382-5346 i
1 1
4 4
r
I 4
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 2 2.
Scheduled next refueling shutdown: March 1997 3.
Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption or operation thereafte require a technical specification change or other license amendment?
if yes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
. Scheduled date(s) for submitting proposed licensing action and supporting information.
i i
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuelpool: 124 8.
Present licensed fuel pool capacity: 1418 Size ofrequested or plmmed increase: =
i 9.
Projected date oflast refueling which can be accommodated by present license capacity:
September 2011 l
DUKE POWER COMPANY DATE: February 14.1997 Name of
Contact:
R. A. Williams Phone: (704). 382-5346 4
i 4