Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-III-85-076, on 850825,recirculation Pump B Problem Resulted in Brief Power Increase from 2.9 to 8.8%.Reactor Operators Tripped Pump After Failing to Reduce Pump Speed. Testing Disclosed No Problems W/Speed Control Circuitry + (ML20134L503)
- ML20134L505 + (ML20134L505)
- PY-CEI-NRR-2140, Monthly Operating Rept for Jan 1997 for Perry Unit 1 + (ML20134L507)
- 3F1196-01, Forwards Rev 23 to Crystal River Unit 3,FSAR Which Satisfies Requirements of 10CFR50.71(e)(4) & Includes Matl Which Describes Organization,Mods or Changes to CR-3 That Have Been Implemented as of End of Refuel 10 + (ML20134L508)
- ML20134L511 + (ML20134L511)
- ML20134L514 + (ML20134L514)
- ML20134L515 + (ML20134L515)
- ML20134L518 + (ML20134L518)
- 05000382/LER-1996-001, :on 951107,TS 3.0.3 Entered Due to SIT Levels Reading High.Caused by Poor Work Practices.Cr Staff Immediately Lowered SIT Levels Until within Specified Range for Compliance W/Tss + (ML20134L523)
- 05000287/LER-1985-001-04, :on 850723,reactor Tripped Due to High RCS Pressure.Caused by Erroneous Signal from Failed Integrated Control Sys Module.Module Replaced + (ML20134L524)
- ML20134L525 + (ML20134L525)
- ML20134L528 + (ML20134L528)
- ML20134L529 + (ML20134L529)
- ML20134L534 + (ML20134L534)
- ML20134L536 + (ML20134L536)
- ML20134L537 + (ML20134L537)
- ML20134L539 + (ML20134L539)
- ML20134L540 + (ML20134L540)
- ML20134L541 + (ML20134L541)
- CLI-96-11, Order (CLI-96-11).* Denies Petition for Review Re Es Mcdaniel Challenge to Staff Rejection of Claim Concerning Written Exam to Become RO at Vogtle Electric Generating Plant.W/Certificate of Svc.Served on 961113 + (ML20134L542)
- ML20134L543 + (ML20134L543)
- ML20134L547 + (ML20134L547)
- ML20134L549 + (ML20134L549)
- ML20134L551 + (ML20134L551)
- ML20134L553 + (ML20134L553)
- ML20134L554 + (ML20134L554)
- ML20134L555 + (ML20134L555)
- ML20134L556 + (ML20134L556)
- ML20134L557 + (ML20134L557)
- ML20134L558 + (ML20134L558)
- ML20134L559 + (ML20134L559)
- ML20134L560 + (ML20134L560)
- ML20134L561 + (ML20134L561)
- ML20134L562 + (ML20134L562)
- 05000296/LER-1985-019-02, :on 850725,during Surveillance Testing on Reactor Bldg Ventilation Exhaust Radiation Monitors, Inadvertent Secondary Containment Isolation Occurred.Caused by Improper Volt Meter Hookup Techniques + (ML20134L563)
- ML20134L564 + (ML20134L564)
- ML20134L565 + (ML20134L565)
- ML20134L566 + (ML20134L566)
- ML20134L567 + (ML20134L567)
- B11666, Forwards Preliminary Summaries of Public Safety risk- Oriented Analyses of Listed Projects Being Evaluated in Integrated Safety Assessment Program + (ML20134L568)
- ML20134L569 + (ML20134L569)
- ML20134L570 + (ML20134L570)
- ML20134L571 + (ML20134L571)
- ML20134L573 + (ML20134L573)
- PNO-I-85-062, on 850829,at 100% Power,Reactor Tripped & Safety Injection Occurred.Caused by Broken Pipe Fitting on Instrument Air Compressor Tank in Turbine Bldg.Pressurizer Pressure Restored to Normal + (ML20134L574)
- ML20134L575 + (ML20134L575)
- ML20134L577 + (ML20134L577)
- ML20134L579 + (ML20134L579)
- ML20134L580 + (ML20134L580)
- ML20134L581 + (ML20134L581)
- IA-85-442, Package of Operator Exam Results Summary Sheets + (ML20134L581)